F&K Estimatings Construction Estimating & Takeoffs

Arizona · Remote estimating from your documents

Arizona Construction Estimating for Sitework and HVAC Bids

For an Arizona estimating inquiry, send the drawings, project city, bid instructions, and requested trades. A useful takeoff identifies measured scope and leaves the applicable code edition, pricing basis, and procurement requirements explicit for review. F&K works from supplied documents remotely; this page does not imply an Arizona office.

This page describes project estimating support for work in Arizona; it does not represent a local office.

Metropolitan Estimating Hubs in Arizona

Explore specialized local code, AHJ, and procurement estimating context for major metropolitan markets within Arizona:

What changes an estimate in Arizona

The public rules below apply to particular project types and agencies. Confirm the owner, jurisdiction, contract and issue date before using them in a bid.

RequirementWhat it means for the estimateScope affected
Arizona state construction procurementArizona State Procurement Office – Construction Services The State Procurement Office identifies a construction-services program and the Arizona Procurement Portal for state sourcing. For a state bid, obtain the actual solicitation and its bid form, addenda, alternates and contract requirements before setting up the estimate. Bid forms, alternates, general conditions and submission requirements
Job order contracting is a distinct pricing formatArizona Department of Administration – General Services Arizona General Services describes its Job Order Contracting program as using a competitively awarded contract with a fixed unit price book. A JOC proposal needs its contract price book and adjustment-factor instructions; a conventional lump-sum estimate cannot simply be reused as the JOC price proposal. Unit-price mapping, adjustment factors and proposal format
Phoenix code edition must be checked by project addressCity of Phoenix – 2024 code adoption Phoenix states that its 2024 Building Construction Code became effective August 1, 2025, subject to its transition provisions. Do not treat a Phoenix code edition as a statewide rule; use the permit authority and edition documented for the specific project. Code-dependent assemblies, equipment and drawing assumptions

How to organize an Arizona bid review

An Arizona project can be a private bid, an agency solicitation or a job order. The contract documents, not the state name alone, determine the estimating workflow.

  • Private or municipal work

    Identify the building department from the project address. Ask which code edition and local amendments the permitted drawings use, then isolate any scope gaps for the design team.

  • State agency work

    Start with the agency solicitation, bid schedule and addenda. Separate measured quantities from contract-specific allowances, alternates and general conditions.

  • Job order work

    If the owner uses the state JOC program, request the awarded contract, unit price book and adjustment-factor instructions before assigning costs.

Services for Arizona projects

Trade scopes for Arizona projects

  • Concrete estimating — foundation and slab quantities from structural drawings
  • Electrical estimating — equipment, devices and feeder scope shown in the set
  • HVAC estimating — roof-mounted equipment, curb and duct interfaces, and replacement work windows documented in the mechanical set
  • Sitework estimating — grading, trenching, specified material treatment and erosion controls measured from civil plans and geotechnical notes

What to send and what to request

Bid drawings and inputs
For sitework, send the grading and utility plans, soils report and any project dust-control requirements. For HVAC, send the equipment schedules, curb details and electrical drawings.
Estimate deliverable
An earthwork and utility schedule with reinstatement and temporary controls on separate lines, or an HVAC workbook with equipment, ductwork, curbs and trade interfaces.

Browse estimating services and trades

Find the drawings, quantities and deliverables for your scope. For a Arizona project, share your bid documents so we can confirm which items belong in the quote.

What to send for a Arizona estimate

  • Current drawings (all disciplines you want included) and the project manual / specifications
  • Addenda issued so far, and the bid date
  • Trades to include and any exclusions
  • Whether you need quantities only or quantities with pricing
  • For public work: the solicitation, bid schedule and all addenda
  • For JOC work: the awarded unit price book and adjustment-factor instructions
  • The project jurisdiction and permit/code edition identified by the design team

How the estimate is prepared

  1. 1. Jurisdiction and procurement type. Confirm the project jurisdiction and whether the work is job order contracting — JOC pricing runs off the awarded unit price book, not a fresh takeoff alone.
  2. 2. Documents for the bid. Gather the current drawings, specifications, addenda and bid date, with the solicitation and bid schedule for public work.
  3. 3. Scope, code edition and deliverable. Nail down the trades, exclusions and deliverable in the written proposal, including the code edition the design team has identified for the project.
  4. 4. Measured output. Quantities are prepared from the supplied documents and the agreed scope; gaps and assumptions are written down for review rather than left implied.
  5. 5. Priced scope and delivery. A priced estimate starts from labor, material and pricing assumptions confirmed in the proposal for that project, and the fee and timing are agreed before work starts.
Full estimating methodology

Fees and turnaround

Arizona fees depend on the procurement route and the package — a standard commercial takeoff is quicker to estimate than a public-works bid with JOC unit-price-book pricing or a multi-jurisdiction scope. The proposal you receive confirms fee, schedule, deliverables, assumptions and exclusions before work starts.

What you receive reflects the documents and assumptions supplied for the job; the final construction cost is not promised.

Arizona estimating questions

What should I send for an Arizona takeoff?

Send the latest drawings, specifications, addenda, project address, requested trades and bid date. For public work, include the solicitation and bid form; for JOC work, include the contract price book and instructions.

Does the Phoenix building code apply across Arizona?

No. Phoenix publishes its own code and transition rules. Identify the authority having jurisdiction and the edition used for your project before treating a code requirement as part of the estimate.

How do I confirm the fee and delivery schedule?

Share the current drawings, specifications, requested trades, deliverable, and bid date. The proposal should confirm the fee and schedule for that scope before work begins.

Related guides

Sources

Requirements can change; confirm the edition and rules that apply with the authority having jurisdiction for your project.

Review your Arizona project scope

Send the current set and procurement documents. The written proposal should identify scope, exclusions, pricing basis and delivery date.

Discuss an Arizona estimate

Or email info@fandkestimatings.us · call +1 (317) 751-5969

Separate regional inputs from the quantity review

Work from the national quantity takeoff scope for the measured output; Arizona's procurement inputs — the solicitation format, the JOC unit price book, the jurisdiction's code edition — belong in the scope discussion, not in the measurement. Use the F&K US sample pages to check selected quantity rows, units and drawing references — they are a format check, not confirmation of all trades, a local office or a completed project here.

We need the current issued drawings and addenda, the project address, and the required units and trade interfaces, with the awarded unit price book for JOC work. Fix in advance the treatment of revised quantities, drawing discrepancies, allowances and omissions, and see the format in the sample evidence library ahead of requesting an output.

A separate agreed basis covers pricing, permit interpretation, procurement quantities and labor productivity — in Arizona that includes the JOC adjustment-factor instructions and the procurement portal's bid format. Raise those points and the revision terms in the scope request.