Protecting the General Contractor's
Fee at Risk.
Commercial estimating is not just compiling subcontractor numbers. It's identifying the scope gaps between the trades, managing the material lead times, and building a General Conditions model that reflects the reality of the schedule.
Engage Our Precon TeamGMP Validation vs. Hard Bid
Whether you are submitting a competitive hard bid or negotiating a Guaranteed Maximum Price (GMP) with a developer, the risk profile is identical: what you miss, you pay for. We act as your external preconstruction department. We dissect the design development (DD) drawings and provide rigorous cost modeling before the 100% Construction Documents are even issued.
Plan Review: Commercial Coordination
Generic takeoff services just click lines. Our estimating team reviews the architectural details against the structural and MEP notes. When we find a conflict, we highlight it on the plans and generate an RFI before you bid.
The MEP plans showed new condensing units on the roof and new plumbing chases through the existing post-tensioned slab. The structural plans showed nothing. We identified the missing dunnage steel, the X-ray scanning required for the PT cables, and the core drilling labor, saving the GC from a massive day-one change order.
Subcontractor Bid Leveling
When bid day arrives, you don't have time to read the fine print on twenty different subcontractor proposals. We build MasterFormat-aligned bid leveling matrices. We plug the exclusions, normalize the inclusions, and ensure that the low-bid electrician isn't leaving out the temporary power or the fire alarm integration.
Richard Hayes
Director of Commercial Preconstruction • GMP Contracts & High-Rise Commercial
"If you don't build the project virtually during the estimate, you will build it twice in the field. We find the clashes in the PDFs so you don't find them with a sawzall on the jobsite."
Our Commercial Deliverables
- MasterFormat Budget (Div 1-48)
- Pre-Bid RFI Log
- Subcontractor Leveling Sheets
- Schedule-Driven General Conditions
Commercial Preconstruction FAQ
Do you perform constructability reviews before takeoff?
How do you handle phased occupancy and tenant improvements (TI)?
Do you assist with Value Engineering (VE)?
Offload Your Preconstruction Risk
Stop missing bids because your internal estimating team is overwhelmed. Scale your precon capacity with us.
NDA Protected & Confidential