CONSTRUCTION PROJECT MANAGEMENT & COST CONTROL

Construction Project Management & Cost Control Services

Comprehensive preconstruction project management and cost control support across all 50 US states. Delivering CPM scheduling, Earned Value Management (EVM), subcontractor buyout leveling, and progress draw audits.

Project fee
Scope-based written quote
Typical delivery
Schedule agreed after review
Review package
Written findings for the agreed scope

Final fee, deliverables and delivery date are confirmed after document review. Larger and multi-trade packages take longer. See scope-specific fees and timing.

Your next contractor bid

Request a project management quote

For preconstruction cost tracking, send the baseline estimate, cost codes and open change log. Identify the period or drawing revision you want reconciled and who approves changes to the budget. We confirm the deliverables, fee and delivery date in writing after document review.

Useful documents for this scope

  • Contract drawings and the awarded estimate
  • Revised drawings, bulletins or RFIs
  • Your cost reports, if you want budget tracking

Separate pending changes from approved costs

Reconcile each change to the baseline cost code. Where the log combines pending and approved work, split the entries so your team can see the approved budget and the cost exposure still awaiting a decision. Inspect the sample deliverable formats and tell us which outputs you need.

Remote support across the United States. View service areas.

Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.

Inspect the deliverable

Follow the drawing and quantity trail

Open the published sample workspace to inspect selected quantity rows, original units and available source drawing previews. These are excerpts, not a complete priced bid or evidence of a client result.

Concrete plan excerpt from the published estimating sample library

Concrete & site quantities

Concrete, reinforcement, formwork and site-improvement quantities with separate source units.

48 selected line items · drawing and workbook references where available

Inspect quantities and source excerpts →
Electrical lighting plan from the published estimating sample library

Coordinated MEP quantities

Plumbing, mechanical and electrical quantities organized by their recorded CSI divisions.

90 selected line items · drawing and workbook references where available

Inspect quantities and source excerpts →

Sample Project Controls & Cost Tracking Matrix

Primavera P6 schedules, EVM cost tracking, subcontractor buyouts, and AIA draw audits:

Commercial Project Management & Controls Deliverable Ledger

Worked estimating example. Quantities show the stated scope and format; this is not a client project or a project-specific price quote.

Project Controls Scope Tracking Frequency Management Objective Senior Cost Controller Note Estimator Note
Management Milestone 01 - Primavera P6 Resource-Loaded Baseline CPM Schedule 1 LS N/A Includes critical path logic, float calculations, and subcontractor milestones
Management Milestone 02 - Monthly Earned Value Management (EVM) Cost Ledger 1 MO N/A Tracks CPI, SPI, actual cost vs committed budget across all CSI MasterFormat divisions
Management Milestone 03 - Subcontractor Buyout & Trade Contract Leveling 14 PKG N/A Reconciles scope inclusions, exclusions, and payment milestone terms
Management Milestone 04 - AIA G702/G703 Progress Billing & Retainage Audit 1 MO N/A Validates stored materials and completed work percentages for lender draw

Scope and deliverables

Data-Driven Project Controls & Strategic Cost Management

Winning a profitable project on bid day is only the first hurdle—maintaining that profit through construction requires relentless cost control, proactive schedule management, and disciplined trade buyout execution.

At F&K Estimatings, our project management specialists provide fractional project controls. We establish logic-tied CPM baseline schedules in Primavera P6, level subcontractor trade packages, and monitor monthly budget burn rates with Earned Value Management (EVM).

We give general contractors and developers executive-level project controls without the overhead of full-time executive payroll.

Scope, price, and delivery are confirmed after reviewing the project documents and requested deliverables.

Construction Project Management Scheduling and Cost Control Dashboard

Deliverables for your agreed scope

Color-Coded PDF Markups

High-resolution drawing sheets with every line item, area polygon, and linear foot color-coded in Bluebeam.

Itemized CSI Excel Schedules

Measured quantities organized by CSI MasterFormat, with units and separately stated waste allowances. Labor, material and equipment rates are included only in an agreed priced estimate.

Project-Specific Pricing Basis

Cost assumptions are stated in the written proposal and can use client rates, supplier quotes, or another identified basis.

Pre-Bid RFI & Scope Gap Audit

Scope-gap notes and drawing clarifications for the agreed trades. A separate constructability review is included only when specified in the written quote.

Contractors and builders we serve

General Contractors

Needing fractional project management, CPM scheduling, and professional cost control systems.

Commercial Developers & Owners

Requiring independent third-party construction manager oversight and lender draw verification.

Trade Subcontractors

Seeking schedule delay claim documentation and defensible change order pricing support.

Design-Build Contractors

Coordinating preconstruction design schedules with critical procurement milestones.

Construction Lenders

Requiring third-party progress payment inspections and schedule of values reviews.

Project Management Support: quantities, checks and quote requirements

Project management support covers cost tracking after award: schedule of values, change-order pricing, and budget-to-actual updates prepared from your project documents.

Measurement and reporting basis

  • Baseline estimate and cost-code structure
  • Change log and cost-reporting inputs
  • Budget-to-revision reconciliation

Documents to include

  • Contract drawings and the awarded estimate
  • Revised drawings, bulletins or RFIs
  • Your cost reports, if you want budget tracking

Also identify the current revision, addenda, project ZIP code, requested trades and bid deadline.

A scope check before pricing

Define the requested cost-tracking or preconstruction support task. Align cost codes with the estimate and change log so revised scope can be reconciled with the baseline budget.

Scope limits: On-site supervision, safety management and full construction-management authority are excluded from estimating support.

Worked estimating example

Make a quantity revision visible in the cost log

If a recorded scope changes from 100 to 120 units, the measurable change is 20 units. That change alone does not establish an approved change order or schedule impact.

What the estimate should record
Record the old and new revision, quantity difference, rate basis and approval status. Keep pending changes separate from the accepted project budget.
Resolve before pricing
Who approves the cost change, and which project records define the baseline?

US project coverage for project management support

For US projects, include the ZIP code and the location-sensitive inputs below.

  • Identify the project location, reporting calendar and cost-code structure for the requested cost-tracking support.
  • Record local vendor revisions, delivery changes and location-related change orders against the agreed estimate baseline.

The proposal records the pricing date, cost sources and unconfirmed allowances. Explore US service area information or send your project details for a scope quote.

Use the document checklist above to request quantities only, a priced estimate or a review of an existing bid.

Request a project management support scope quote

Scope coverage for your bid package

Critical Path Method (CPM) Scheduling

Primavera P6 and MS Project logic-driven schedules, milestone tracking, float analysis, and delay claim defense.

Earned Value Management (EVM) & Cost Control

Work breakdown structures (WBS), committed cost tracking, cost variance forecasting, and cash flow modeling.

Subcontractor Buyout & Contract Leveling

Scoping trade packages, drafting scope sheets, leveling sub quotes, and mitigating bid day gaps.

Material Procurement & Delivery Tracking

Early long-lead purchase schedules, vendor expediting, delivery staging, and storage log management.

AIA Progress Billing & Pay Application Audits

G702/G703 schedule of values preparation, stored materials auditing, and lender draw documentation.

Change Order Pricing & Claims Validation

Forensic cost reviews of subcontractor change order requests (CORs), time-and-material audits, and RFI impacts.

From document review to your deliverables

  1. 01

    Share the current bid set

    Send issued drawings, specifications, addenda, location and deadline. Identify the trade packages and outputs you need.

  2. 02

    Agree the written scope

    Confirm included work, exclusions, estimating fee and delivery date before work starts.

  3. 03

    Measure and review

    Organize the agreed quantities or review findings. Record assumptions, missing information and scope clarifications.

  4. 04

    Receive the agreed package

    Review the deliverables against the written scope. Raise questions and identify any later drawing revisions separately.

Software and reporting standards

Measured quantities follow the agreed scope and are organized by applicable CSI MasterFormat divisions. Pricing sources and assumptions are identified separately when a priced estimate is requested.

Software / toolPurposeReporting basis
PlanSwift ProDigitized linear, count, and area takeoff quantificationIndustry Benchmark
Bluebeam RevuVector drawing markup, multi-discipline overlay & RFI loggingCSI MasterFormat
Client Rates / Supplier QuotesProject-specific pricing basis when a priced estimate is requestedAssumptions Stated

Estimating fees and delivery

Most single-trade estimates are delivered in 24–48 hours; larger packages take longer and the written quote confirms the date Exact fee and date are confirmed in the written quote.

Scope / project typeTypical deliveryTypical fee
Single-trade material takeoffTypically 24–48 hours after approval$150–$1,000 typical
Residential construction estimateTypically 2–4 business days after approval$400–$1,000 typical
Commercial preconstruction packageTypically 3–5 business days after approval$150–$1,000 typical
Industrial & heavy civil takeoffTypically 4–7 business days after approval$1,000–$5,000+ typical
Ongoing estimating supportPriority queue agreed in writing$1,800/mo typical

These are estimating-service fees. Drawings, scope and requested delivery determine the written proposal.

Frequently asked questions

What construction project management and cost control services do you provide?

We provide fractional preconstruction project management, Earned Value Management (EVM) budget tracking, Primavera P6 / MS Project Critical Path Method (CPM) scheduling, subcontractor buyout support, and monthly pay application (AIA G702/G703) audits.

Can you assist with material procurement scheduling and delivery logistics?

Absolutely. Our project managers align line-item takeoff quantities with vendor delivery milestones, ensuring high-demand commodities (structural steel, lumber packages, switchgear) arrive exactly when required by the jobsite critical path.

How do you track construction budgets and cost variances during execution?

We establish baseline cost control work breakdown structures (WBS) mapped directly to your CSI MasterFormat estimate. We monitor committed costs, actual jobsite expenditures, and projected cost-to-complete (CTC) to flag potential budget variances before they erode margins.

Do you develop baseline CPM project schedules in Primavera P6 or MS Project?

Yes. We create resource-loaded and logic-tied CPM baseline schedules, detailing trade handoffs, inspection milestones, procurement lead times, and weather contingency days.

How does fractional project management compare to a full-time executive PM?

Our fractional project management model gives growing general contractors and developers access to senior-level preconstruction directors and cost controllers at a fraction of the cost of full-time payroll, benefits, and executive overhead.