CMU block takeoff
Requested output: Net wall quantities by block size and type, with special units identified.
Confirm in your quote: Openings, bond beams, lintels, pilasters and unit conversion rules.
Comprehensive material takeoffs for masonry subcontractors and general contractors. We calculate measured CMU block piece counts, face brick, mortar bag quantities, core grout cubic yards, bond beams, ties, and architectural cast stone.
Send the drawing set, required trade scope, project location and bid deadline. We will review your documents and confirm the estimating fee, deliverables and delivery date in a written proposal.
Masonry takeoffs count CMU, brick and stone by wall area and unit, then add grout, reinforcing, ties, lintels, control joints and scaffolding.
Also identify the current revision, addenda, project ZIP code, requested trades and bid deadline.
Separate net wall area, unit counts and grouted cells. Identify opening deductions, bond beams, lintels, flashing and weeps before applying a mortar or grout allowance.
Scope limits: Reinforcement and grout spacing follow the supplied details; structural design and site inspections are excluded.
Worked estimating example
A wall with 1,000 SF gross area and 100 SF of deducted openings has 900 SF net area under that stated deduction basis.
Request a masonry takeoff service with wall types and accessories separated for supplier pricing and installation bids. Brick veneer and structural CMU need different measurement and reinforcement breakdowns.
Requested output: Net wall quantities by block size and type, with special units identified.
Confirm in your quote: Openings, bond beams, lintels, pilasters and unit conversion rules.
Requested output: Face areas, corners, returns, sills and specified veneer accessories.
Confirm in your quote: Module size, coursing assumptions, opening deductions and pattern waste.
Requested output: Reinforced cells, bars, ties and grout quantities from the details.
Confirm in your quote: Fully versus partially grouted walls, lap assumptions and structural revisions.
A block or brick count alone is not a complete masonry package. Identify flashing, weeps, cavity insulation, scaffolding and temporary support ownership before comparing subcontract bids.
Request this estimating scopeFor US projects, include the ZIP code and the location-sensitive inputs below.
The proposal records the pricing date, cost sources and unconfirmed allowances. Explore US service area information or send your project details for a scope quote.
Use the document checklist above to request quantities only, a priced estimate or a review of an existing bid.
Request a masonry scope quoteMasonry estimating services provide itemized digital quantification of all concrete masonry units (CMU), architectural brick, mortar, structural grout fill, rebar reinforcement, and flashing required for masonry construction. An expert takeoff converts architectural elevations and structural wall sections into precise piece counts—preventing costly material shortages or surplus waste on bid day.
Our senior masonry estimators quantify all aspects of structural block, veneer brick, and architectural stone:
Mortar types (M, S, N, O), grout mixes, horizontal joint reinforcement, wall ties, and seismic anchorages.
Modular, king-size, and utility face brick, glazed brick, brick pavers, ties, weep vents, and lintels.
Standard, lightweight, architectural split-face, burnished, and ground-face CMU block partitions.
Natural cut limestone, granite panels, dimensional stone cladding, rubblestone, and anchor hardware.
Cast stone window sills, architectural wall caps, pier caps, decorative banding, and adhered stone veneer.
Tuckpointing, mortar joint raking, brick replacement, masonry chemical washing, and water repellents.
Interactive preview of our formula-driven, itemized Excel deliverables with waste factors & block counts:
Worked estimating example. Quantities show the stated scope and format; this is not a client project or a project-specific price quote.
| Material / Scope Item | Base Qty | Unit | Waste / Lap Factor | Estimator Note |
|---|---|---|---|---|
| 8x8x16 Lightweight Standard Gray CMU (ASTM C90) | 24,800 | EA | 5% | Includes standard stretcher blocks, corner units & jamb blocks |
| 8-Inch U-Block Knockout Bond Beam Units | 2,150 | LF | 5% | Includes 2-#5 continuous rebar reinforcement & lap splices |
| 3000 PSI Coarse Core Grout Fill (Grouted @ 32in OC) | 185 | CY | 10% | Volume calculated per structural cell schedule with cleanout allowances |
| Pre-Blended Type S Masonry Mortar (80 lb Bags) | 1,240 | BAGS | 12% | Calculated for 3/8-inch tooled concave mortar joints per TMS 402/602 |
| Modular Red Clay Face Brick (3-5/8 x 2-1/4 x 7-5/8) | 48,200 | EA | 8% | Includes stainless steel corrugated brick ties @ 16in OC & weep hole inserts |
| 2-Inch Rigid Polyiso Cavity Wall Insulation (R-13.1) | 7,400 | SF | 8% | Includes taped foil seams & self-adhered flexible through-wall flashing |
| 9GA Ladder-Type Wire Joint Reinforcement (10ft lengths) | 8,200 | LF | 10% | Installed horizontally at every second block course (16in OC) |
How we eliminate bidding blind spots and protect your profit margins on bid day:
We review structural wall elevations, bond beam schedules, control joint intervals, and cavity insulation details.
Using PlanSwift & Bluebeam, we calculate gross wall SF, deduct window/door openings, and determine measured block piece counts.
We model structural rebar cell spacing to compute core grout volume, mortar bags, ladder wire, ties, and 5-12% waste.
We apply documented labor assumptions and supplier quote sheets. A senior estimator audits the entire takeoff package.
Our masonry estimating deliverables include piece counts for standard and lightweight Concrete Masonry Units (CMU - 4", 6", 8", 10", 12"), face brick / architectural brick veneer SF, mortar bag counts (Type S, N, M), core grout fill volume (cubic yards), bond beam units, lintels (precast & steel), horizontal ladder reinforcement (Duro-O-Wal), vertical rebar poundage, wall ties, weep vents, and continuous cavity insulation/flashing.
We never guess rough volume. We calculate core grout fill based on structural bar spacing (e.g. 16", 24", 32", 48" OC or fully grouted cells), accounting for bond beam troughs and block hollow percentages. Mortar is calculated per 100 square feet of wall area with localized 10-15% waste factors.
Yes. We quantify manufactured stone veneer, natural cut limestone, cast stone window sills, wall coping stones, pilaster caps, and stainless steel anchor hardware with detailed cut lists.
For historic preservation and restoration projects, we quantify tuckpointing square footages, individual spalled brick replacements, chemical masonry wash, lintel replacement, and structural heli-tie masonry anchoring.
Delivery depends on the drawing set, requested trade scope, pricing requirements and bid deadline. The delivery date, scope and revision coverage are confirmed in the written quote after document review.
We use PlanSwift with custom masonry assemblies, Tradesmens Software, On-Screen Takeoff (OST), and Bluebeam Revu, delivering fully editable, formula-driven Excel spreadsheets structured by CSI Division 04.
We apply documented client or supplier pricing inputs or your supplier price quotes (e.g., Acme Brick, Oldcastle, Forterra), factoring in mason-to-tender crew ratios, scaffold mobilization, winter tenting/heating, and daily lay-rates per crew.
Yes. General contractors use our independent takeoffs to verify subcontractor block counts, ensure core grout fill matches structural notes, and avoid costly scope omissions before submitting tenders.
Masonry estimating services help masonry subcontractors price wall assemblies by material and location. Use a separate masonry takeoff for block, brick veneer and stone rather than one blended wall quantity.
Send architectural elevations, wall sections, structural masonry details, schedules, specifications and the bid deadline. Identify alternates and material supply responsibilities.
Unit counts and waste depend on unit dimensions, bond patterns and project details. Structural design and field inspection are separate from the takeoff; missing reinforcement information requires clarification.
Related estimating scope
Upload your structural masonry blueprints today. Receive a comprehensive, formula-driven MasterFormat takeoff and marked-up PDF drawings on the delivery date agreed after document review.
Project scope and delivery are confirmed in the written quote.
Request Your Quote Now
Share your project scope and bid deadline to request a written quote.
Thank You!
We've received your request. We will reply with a written quote confirming the scope, fee and delivery date after document review.