F&K Estimatings Construction Estimating & Takeoffs

Schedules · Solar glazing · Hardware sets

Phoenix opening counts follow the schedule, including the solar glazing the energy form already named

Openings on a Phoenix permit are checked with the 2024 building and energy books Planning & Development adopted effective 1 August 2025. The solar and thermal values that matter are the ones printed on the schedule or the energy form. They are not a citywide glass upgrade. Rated openings follow the life-safety plan. Hardware is a count of sets.

Keep doors and windows in separate registers. Storefront bays, punched windows, and curtain-wall panels do not share a unit. A residential sliding door is not a storefront bay. Flashings at the head and sill are lengths when the detail draws them. Existing windows that remain on a renovation are not new units. A frame that remains with a new leaf is not a full opening.

Glaziers in the Phoenix-Mesa-Chandler wage area, May 2025 file OEUM003806000000047212103, hourly mean $27.12. That occupation does not hang every hollow-metal frame. The mean is not a window price. Private work does not inherit a public scale.

Upload schedules and elevations. Rough openings are not field-measured. Pair doors are one opening with two leaves when the schedule says pair, and the hardware set for a pair is not doubled unless the set schedule shows two sets.

Sill receivers and head flashings are lengths when the detail draws them. Curtain-wall bays use the schedule’s unit, bay or area, and that choice is written down. Interior borrowed lites do not inherit the exterior glass. Rated corridor lites take the rating of the wall they sit in. A renovation column marks units that remain. A new leaf in an old frame is not a complete opening. Hardware sets numbered in the spec are counts of sets. Closers are not assumed on every leaf. Storefront at grade often has a different sill than the punched windows above, and those sills are not averaged.

Thresholds and door bottoms are counts when the hardware set includes them. Viewers, kick plates, and coordinators are the set contents, not extra openings. A hollow-metal frame schedule that uses a type mark is counted by mark. Storefront shear blocks and receptors are lengths when the storefront detail shows a continuous receptor. Automatic operators are counts of operators, not of doors, when one operator serves a pair. Insect screens on residential sliders are counts if the schedule lists screens. They are not assumed on every sliding panel. Exterior door sweeps in a dusty climate are still only the sweeps the hardware set names.

Opening counts before Valley solar glazing notes

Phoenix opening counts that should not be blended

Do you specify dark glass on every Phoenix window?

No. Glass makeup comes from the schedule. A blank glass type is a gap, not a solar upgrade.

Can storefront and unit entry doors share one price?

The registers should stay separate. They are different products. The bid form can still award them to one contractor.

Will existing windows be measured on site?

No. Sizes come from the survey in the set. A missing survey is an exclusion.

Phoenix opening references

Send Phoenix opening schedules

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.