Bid packages and deliverables
Refurbishment and fit-out packages
Refurbishment tenders are won or lost on what is retained, so the workbook separates strip-out, making good, new work and works to existing structure. Rooms are measured by floor and zone from the survey drawings and finishes schedule, with anything marked as existing kept apart from new supply.
Commercial estimating Subcontract trade takeoffs
Dryliner, groundworker, mechanical and electrical bidders usually receive a package, not a full set. We measure only the trade you are pricing, list the drawing revisions used, and flag items that the main contractor's preliminaries or another trade appear to carry.
Quantity takeoff deliverables Bill of quantities cross-check
If the employer's team has issued a bill, we check its quantities against the drawings and report missing, duplicated or superseded items by bill reference. The result is a query list your estimator can raise during the tender period.
MEP takeoff scope Drylining and ceilings
Partitions are split by type, height and fire or acoustic rating, with boards, insulation, framing and ceilings counted on separate lines. Boxing-in, bulkheads and access panels are listed so they are not lost inside an area rate.
Drywall and drylining takeoff Groundworks and concrete
Excavation, foundations, slabs and drainage runs are measured from the engineer's and architect's drawings, with concrete in cubic metres and reinforcement in tonnes. Disposal, imported fill and temporary works that the drawings imply are called out as assumptions.
Concrete estimating Mechanical and electrical
Distribution, terminals, plant and controls are counted from schematics and layouts, with containment, cabling and testing and commissioning kept apart. Items supplied by the client or another contractor are flagged line by line.
Electrical estimating The written quote confirms the included trades, output, fee and delivery date. For multi-package tenders, tell us whether you need one consolidated workbook or separate returns by trade, building or tender lot.
Refurbishment tender scope check
Before pricing a UK refurbishment, confirm which drawing issue and survey the bill is based on, what is existing and what is new, and whether asbestos and condition surveys are in the pack. Check who carries preliminaries, temporary works, out-of-hours working and making good to adjoining finishes. Confirm the contract form, whether the job falls under the VAT domestic reverse charge, and the return date and time.
Illustrative school refurbishment partition rollup | Scope | Example input | Workbook entry |
| Classroom partitions | 12 rooms × 34 m² of measured partition | 408 m² of partition area. |
|---|
| Corridor lining and toilet block | 96 m² of corridor lining plus 64 m² of two-layer moisture-resistant board | 160 m² combined, with board layers and fire rating recorded separately. |
|---|
| Combined partition area | 408 m² + 160 m² | 568 m² for the drylining package, before waste and making-good allowances. |
The quantities are illustrative. Use the current tender documents and agreed scope to prepare your bid.
Return quantities by room group, with drawing issue, partition type, board layers and fire rating identified on every sheet.
Measurement rules: NRM 2 and what your bill expects
UK building work is commonly measured to the RICS New Rules of Measurement. NRM 2 covers detailed measurement for building works for bills of quantities, quantified schedules of work and schedules of rates, and the current edition is the second edition published in October 2021 and effective from 1 December 2021. It replaced the earlier Standard Method of Measurement, SMM7, which many older bills and price books still follow.
That matters because the same wall can be measured differently under different rules. If your tender bill cites NRM 2, SMM7 or a bespoke method, tell us when you send the package and the workbook will follow it, with the rule cited in the item description where it changes how a quantity is taken. Where no method is stated, we say which assumptions we used so your estimator can adjust them.
VAT and the construction reverse charge
Since 1 March 2021 the domestic reverse charge has applied to most building and construction services reported under the Construction Industry Scheme, when the customer is VAT registered and not an end user or intermediary supplier. In those cases the customer accounts for the VAT rather than the supplier. It does not generally apply to a private domestic customer, who is not VAT registered.
For a tender this changes how prices are presented and compared, so the workbook shows VAT on its own line and keeps materials supplied separately from services visible. Whether the reverse charge applies to your supply is a tax question for your accountant or HMRC guidance, not something F&K decides.
Regulations, contracts and the four nations
Building regulations are set separately for England, Wales, Scotland and Northern Ireland, so the technical standard your drawings cite depends on where the site is. In England the Approved Documents give guidance on topics such as fire safety and energy performance, and a tender that cites a particular document or edition is measured against it. Scottish projects follow their own building standards.
On the contract side, many UK projects use JCT or NEC forms, and the form affects what the estimate must carry, such as who bears ground risk and how changes are valued. We measure to the documents in the pack and flag clauses or exclusions that appear to move quantity risk onto the bidder.
Frequently asked questions
Do you measure to NRM 2 or SMM7?
Whichever method your tender documents cite. Tell us at the start and the workbook follows it, noting where a rule changes how a quantity is taken. If no method is stated we list our assumptions.
Are you a chartered surveying practice?
No. F&K is a remote US-based estimating team. We produce measured quantities and priced estimates for your bid, but if your client or contract needs a RICS-qualified surveyor to certify a bill or valuation, that stays with your own QS.
Can you price in pounds sterling?
Yes. The workbook carries pricing inputs in GBP for the agreed scope and shows VAT separately. Rates come from your supplier quotations or the pricing basis agreed in the written quote.
Can you work on small subcontract packages?
Yes. Many UK enquiries are a single trade package from a main contractor. Send the drawings for that package and we measure only what you are pricing.
What do you need from me, and how fast is the return?
Send the drawings, specification, any issued bill, the contract form, the trades to price and the return time. Typical turnaround is 24-48 hours once the package is complete, confirmed in the written quote.