Remote estimating for US contractor bids
Metals Estimating Services for Stairs, Rails & Fabrications
Itemized takeoffs for the Division 05 fabrication package — stairs, railings, lintels, embeds, grating and ornamental metal — measured from your drawings and listed by mark. Structural frame members are priced as a separate scope, so your metals bid stays clean and easy to check.
- Project fee
- Scope-based written quote
- Typical delivery
- Schedule agreed after review
- Deliverables
- Excel + marked-up PDFs
We confirm the fee and delivery date in writing after reviewing your drawings. See scope-specific fees and timing.
Your next contractor bid
Request a metals estimating quote
Tell us the deadline, location and required scope. Send current drawings or paste a drawing-sharing link in the form. You receive a written proposal confirming the deliverables, fee and delivery date after document review.
Useful documents for this scope
- Architectural plans, elevations and stair/railing details
- Structural plans and embed/anchorage details
- Division 05 specifications and finish/coating schedules
Coordinate your bid scope
Confirm adjoining work and exclusions before the estimate begins. Inspect the sample deliverable formats and tell us which outputs you need.
Remote support across the United States. View service areas.
Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.
Interactive preview of our formula-driven, itemized Excel deliverables with Division 05 fabrication quantities:
Worked estimating example. Quantities show the stated scope and format; this is not a client project or a project-specific price quote.
| Material / Scope Item | Base Qty | Unit | Waste / Lap Factor | Estimator Note |
|---|---|---|---|---|
| Two-flight egress stair with landing, pan treads and pipe rails | 2 | EA | N/A | Stringers, treads, landing framing and rail posts counted by mark; landings measured separately from flights; coating listed separately |
| Pipe guardrail with posts, mid-rails and wall returns | 240 | LF | 3% | Posts, top rail, mid-rails and returns measured by run; wall brackets counted per post spacing; extensions at top and bottom counted per run |
| Loose steel lintels per opening schedule | 18 | EA | N/A | Angles sized per opening; bearing length and coating noted for each lintel |
| Embed plates with headed studs for concrete and masonry | 36 | EA | N/A | Plates and studs taken from structural details; locations listed by grid reference; anchor bolts and weld notes recorded per plate |
| Welded steel bar grating panels with banding | 640 | SF | 5% | Panels measured by area; cutouts for penetrations and support angles listed separately; stair treads counted by piece where the layout shows them |
| Cold-formed stud and track wall framing | 1,850 | LF | 5% | Stud and track lengths by wall type; bridging, blocking and headers on separate lines; deflection track and slip joints noted where detailed |
| Pipe bollards with caps and concrete fill | 12 | EA | N/A | Bollard pipe, cap, fill and anchorage per detail; finish noted per bollard group; removable bollards listed apart from fixed units |
Compare stair, railing and lintel quantities separately from grating area and coating allowances. Send the stair schedule, railing details and opening schedule to confirm the measured metals package and any fabrication or installation pricing. Request this estimating scope.
Metals Estimating: quantities, checks and quote requirements
Metals takeoffs list fabricated Division 05 items — stairs, rails, lintels, embeds, grating, plate and cold-formed framing — by mark, run or area, with materials, finishes and coatings on separate lines. The structural frame is priced as a separate scope through the structural steel service.
Measurement and reporting basis
- Stairs by flight and piece (FLIGHT / EA) — stringers, treads, landings and attached rails
- Railings and guards by linear foot (LF) — posts, brackets, returns and extensions counted per run
- Lintels by piece and length (EA / LF) — one lintel per scheduled opening unless detailed otherwise
- Embed plates and anchors by piece (EA) — plates, studs and anchor assemblies per structural detail
- Grating and floor plate by area (SF) — panels, banding, fasteners and cutouts listed separately
Documents to include
- Architectural plans, elevations and stair/railing details
- Structural plans and embed/anchorage details
- Division 05 specifications and finish/coating schedules
- Door and window opening schedule for lintels
- Current revision, addenda, project ZIP code and bid deadline
Also identify the current revision, addenda, project ZIP code, requested trades and bid deadline.
A scope check before pricing
Match every stair, rail run and lintel to its schedule line and drawing reference before totaling, and confirm galvanized items are not also counted as primed. A fabrication item that appears on two sheets must be measured once.
Scope limits: Field measurement, shop drawings, connection engineering and welding procedures are outside a standard metals takeoff. Delegated-design stairs and vendor-designed assemblies are listed as exclusions unless their details are supplied.
Worked estimating example
Count stair risers from floor-to-floor height
A floor-to-floor height of 10 ft 6 in equals 126 inches. Dividing 126 inches by the 7-inch maximum riser height in IBC Section 1011.5.2 gives 18 risers, with 17 treads between the first and last riser, and the 10 ft 6 in rise stays within the 12-foot single-flight limit in IBC Section 1011.8.
- What the estimate should record
- Record the floor-to-floor height, the riser count and the riser height used, together with the tread depth and the flight layout. Keep landings, rails and nosings on separate lines so a change in height does not hide inside a stair lump sum.
- Resolve before pricing
- Does the stair as drawn use the maximum riser height, or does the architect's stair schedule fix a different riser count?
US project coverage for metals estimating
For US projects, include the ZIP code and the location-sensitive inputs below.
- Send the project ZIP code with any fabricator quotations for stairs, rails and custom fabrications, noting coating requirements, lead times and quote validity.
- Freight, field-installation and touch-up assumptions stay separate from the measured fabrication quantities so location-driven costs can be compared across bids.
The proposal records the pricing date, cost sources and unconfirmed allowances. Explore US service area information or send your project details for a scope quote.
Use the document checklist above to request quantities only, a priced estimate or a review of an existing bid.
Request a metals estimating scope quoteWhat Are Metals Estimating Services?
Metals estimating services measure and price the Division 05 fabrication package for a construction bid: the stairs, railings, lintels, embeds, gratings, cold-formed framing and ornamental metal that sit around the structural frame rather than forming it. A metals takeoff counts each fabricated item from the drawings — flights and treads, railing runs and posts, lintels per opening, embeds per detail, grating by area — and separates base metal, finishes and coatings so the bid reflects what the fabricator will actually build. Because these items are scattered across architectural, structural and specification sheets, the value of the service is completeness: every small item found, listed once, and tied to the drawing that defines it. Common materials in the package include carbon steel plate and angles, pipe and tube rails, and galvanized or primed finishes, with stainless steel and aluminum appearing where the drawings call for them. The estimate is delivered as an itemized spreadsheet with a Bluebeam PDF, organized by CSI Division 05 section so each package can be checked on its own.
Complete CSI Division 05 Metals Fabrication Scope
Our estimators quantify the fabrication package — stairs, rails, lintels, embeds, grating and ornamental metal — from the drawings and schedules:
Metal Stairs
Egress and access stairs with stringers, treads, landings, nosings and attached rails, counted flight by flight with riser counts and flight layouts tied to the stair schedule.
Metal Railings
Pipe guards, handrails, balusters and wall rails, measured by run with posts, brackets and returns listed and heights recorded as drawn.
Metal Gratings
Bar grating panels, stair treads and trench covers, measured by area with banding, fasteners and cutouts noted and grating types recorded per the NAAMM grating manual.
Metal Floor Plate
Checkered and plain floor plate for platforms, thresholds and covers, measured by area and thickness, with nosings and edge angles listed where the details show them.
Decorative Metal
Ornamental rails, screens, trim and custom-fabricated feature metal, priced from fabricator quotations, with finishes and fabrication notes recorded from the drawings.
Cold-Formed Metal Framing
Cold-formed studs, track, bridging and headers for framed walls, soffits and backing, measured by member length and count, with gauge and coating separated by wall type.
Our 4-Step Metals Takeoff Methodology
How we keep every fabricated item visible and traceable on bid day:
Drawing & Schedule Review
We read the architectural and structural sheets together with the stair, railing and opening schedules and the Division 05 specifications, so items defined on one sheet and detailed on another are caught the first time. Vendor-designed assemblies, delegated-design stairs and items furnished by others are identified up front and recorded as exclusions or separate allowances.
Fabrication-Item Count by Mark
Every stair flight, railing run, lintel, embed plate, grating panel and bollard is counted against its mark or drawing reference, with quantities shown per item rather than rolled into a single lump sum. Counts are cross-checked between plans, sections and schedules so a stair shown on two sheets is measured once, not twice.
Material, Finish & Coating Separation
Carbon steel, stainless steel and aluminum items are separated by material, and galvanizing, primer and applied finishes are listed apart from the metal they protect. This keeps the coating scope visible on its own lines, so a change of finish changes only the affected items instead of the whole package.
Package QA & Bid-Day Check
The finished takeoff is reconciled against the schedules and the specification sections, and every open question — an unstated finish, a missing lintel size, an unconfirmed embed count — is listed for resolution before pricing. Addenda issued after the takeoff are checked against the measured items so the bid reflects the latest revision.
Frequently Asked Questions About Metals Estimating
What is included in a metals estimating takeoff?
A metals takeoff covers the Division 05 50 00 fabrication package: stairs, railings and guards, ladders, lintels, embed plates, bollards, gratings, checkered plate, cold-formed framing and ornamental metal, each counted by mark, run or area from your drawings. Base metal, fasteners, anchors and specified coatings are listed on separate lines so nothing is priced twice or left out. Structural frame members such as beams and columns sit outside this scope and are covered by our structural steel estimating service. Each line in the takeoff carries its drawing reference, so a reviewer can trace any quantity back to the sheet it came from.
How do you quantify stairs, handrails and guards?
Stairs are counted flight by flight, with stringers, treads, landings, nosings and attached rails listed against the stair schedule and the floor-to-floor heights on the drawings. Handrails and guards are measured by linear foot along each run, with posts, brackets, returns and extensions counted separately. Where the drawings cite the IBC, we check the stated geometry against the code sections the project names — riser and tread limits in Section 1011.5, handrail height in Section 1014.2 and guard height in Section 1015.3 — and flag any mismatch for the design team rather than re-designing the stair. Guard posts and baluster spacing follow the dimensions on the drawings, and any run that depends on a vendor-designed assembly is listed separately rather than measured as standard pipe work.
Do you quantify lintels, embed plates and other concealed metal?
Yes — loose lintels are counted from the door and window opening schedule, one lintel per opening unless the details show a shared or continuous angle. Embed plates, anchor assemblies and shelf angles are counted piece by piece from the structural details, with studs, anchors and weld notes recorded alongside each item. Because these items are buried in concrete or masonry, we list them on their own lines so they are easy to verify against the structural set before the bid goes out. Shelf angles and loose lintels at masonry openings are grouped with the openings they serve, which makes it easy to confirm the count against the masonry scope.
How is cold-formed metal framing measured?
Cold-formed framing is measured by member length and count: studs and track by linear foot per wall type, with bridging, blocking, headers and clips listed separately. Framing for soffits, bulkheads and wall backing is kept apart from structural stud walls so each assembly can be checked against its own detail. Material is separated by gauge and coating as specified, and framing shown only as a note or a typical detail is flagged so the estimator and the bidder agree on what is included. Framing quantities are reported by wall type and member size, so the bidder can see which wall types drive the total length.
What about bar grating, floor plate and trench covers?
Bar grating is measured by square foot from the panel layout, with banding, fasteners, support angles and cutouts for pipes and penetrations listed separately. Checkered floor plate is measured by area and thickness for platforms, thresholds and covers, and trench covers are counted by piece with their frames. Our grating references follow the NAAMM Metal Bar Grating Manual (ANSI/NAAMM MBG 531), which sets out the standard grating types and the information a bid set should show. Trench and pit covers are listed with their frames and any required hold-down hardware, since a cover without its frame is only half the scope.
How do you handle galvanizing, primer and other coatings?
Coatings are separated from base metal in every takeoff: hot-dip galvanizing to ASTM A123 appears on its own lines, and so do shop primer and touch-up work. Exterior stairs, rails, bollards and grating usually carry the galvanizing scope, while interior fabrications are more often primed only — the takeoff follows the finish schedule rather than assuming one coating for the whole package. Where the drawings do not state a finish, we record the item as unfinished and raise it as a question before pricing. Stainless steel and aluminum items are never grouped with carbon steel, because their material and finish costs move independently.
What documents should I send for a metals takeoff?
Send the architectural plans, elevations and stair and railing details, the structural plans and embed details, the Division 05 specifications and finish schedules, and the door and window opening schedule for lintels. Add the current revision, any addenda, the project ZIP code and the bid deadline so the scope and the delivery date can be confirmed in writing. PDF sets work well; CAD or BIM files help where the stair geometry or the grating layout is complex. If the set is issued in phases or as separate bid packages, say which package the takeoff should cover so nothing from another package slips in.
How is delivery arranged for a metals estimate?
Delivery depends on the size of the drawing set, the number of fabrication packages and the bid deadline. Once we have reviewed your documents, we confirm the delivery date, the included scope and the revision coverage in writing, and we flag any missing details before work starts so the date we agree is the date you can plan around. If addenda arrive after the takeoff, tell us before the bid deadline so the measured items can be checked against the latest revision.
Metals estimating services for fabricator and contractor bids
Metals estimating services support metal fabricators, general contractors and bid teams pricing a Division 05 50 00 fabrication package. A metals takeoff should separate the fabrication package from the structural frame, and measured items from supplier quotations and allowances.
Define your bid package
- List stairs by flight, rails by run and lintels, embeds and bollards by piece, each tied to a drawing reference. Keep coating and finish quantities apart from base metal so a finish change does not restate the whole package.
- Separate galvanized exterior items from primed interior items, and vendor-designed assemblies from fabricator-built work. Note which items are supplied by others or priced from supplier quotations.
- Record stair geometry, railing heights and grating types as drawn, and flag any dimension that conflicts with the code sections the project names. Do not present a takeoff quantity as an engineered design or a shop drawing.
Documents to send for a scope quote
Send architectural and structural plans, stair and railing details, embed and anchorage details, Division 05 specifications and the opening schedule. Say whether fabrication, delivery and field-installation pricing should be included, and include the current revision, addenda and bid deadline.
Shop drawings, welding procedures, connection engineering and field measurement sit outside a standard metals takeoff and need a separate agreed scope. Unresolved finishes, unconfirmed embed counts and delegated-design stairs should be documented as exclusions or assumptions before the bid is submitted.
Related estimating scope
Ready to Price Your Metals Package with Confidence?
Send your drawings and specifications for a written metals scope quote. You receive an itemized Division 05 takeoff with every stair, rail, lintel and embed listed against its drawing reference.
Send drawings for a written quote
Include trades, location and bid deadline. We confirm fee and delivery before work starts.
Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.