F&K Estimatings Construction Estimating & Takeoffs

COMMERCIAL QUANTITY SURVEYING & COST CONTROL

Quantity Surveyor Services and Construction Cost Management

Remote quantity surveying and bill of quantities support for US construction projects. Share your drawings to confirm measured quantities, cost schedules, exclusions and delivery in a written quote.

Single-trade material takeoff
$150–$1,000 typical
Typical delivery
Typically 24–48 hours after approval
Deliverables
Excel + marked-up PDFs

Paid estimating and takeoff support for contractors, builders and developers. The fee covers preparation of the agreed estimating deliverables. Final fee and delivery date are confirmed after document review. See scope-specific fees and timing.

Last reviewed · Prepared with

Your next contractor bid

Request a quantity surveyor quote

Send the work breakdown, measurement rules and tender form for the bill of quantities. Specify the package structure, required units and any quantities the tender already identifies as provisional. We confirm the deliverables, fee and delivery date in writing after document review.

Useful documents for this scope

  • Drawings for the trades you need measured
  • Specifications or finish schedules
  • Your preferred units and spreadsheet layout, if any

Mark provisional items before bidders price them

Keep provisional quantities apart from measured lines. Where a measurement rule is missing, record the question and identify which quantity is provisional so bidders can review the same basis and raise comparable qualifications. Inspect the sample deliverable formats and tell us which outputs you need.

Remote support across the United States. View service areas.

Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.

Inspect the deliverable

Follow the drawing and quantity trail

A BOQ is a promise about quantities. Look at the published sample workspace, where selected quantity rows carry their original units and drawing references, and see how measured work is scheduled. The samples are excerpts for format review — not a priced bid, and not evidence of a client result.

Electrical lighting plan from the published estimating sample library

Coordinated MEP quantities

Plumbing, mechanical and electrical quantities organized by their recorded CSI divisions.

90 selected line items · drawing and workbook references where available

Inspect quantities and source excerpts →
Finish plan detail from the published estimating sample library

Tile & finish schedule

Floor tile, wall tile, bases and transition strips with the material descriptions preserved.

16 selected line items · drawing and workbook references where available

Inspect quantities and source excerpts →

Sample Quantity Surveyor Financial Deliverables Matrix

Illustrative document-based BOQ and cost review formats; the rows below are examples, not certified project work or evidence of completed lender inspections:

Commercial Quantity Surveying & Cost Control Deliverable Ledger

Worked estimating example. Quantities show the stated scope and format; this is not a client project or a project-specific price quote.

QS Commercial Deliverable Lifecycle Phase Contract Standard Senior Quantity Surveyor Note Estimator Note
QS Service Component 01 - Illustrative bill of quantities (CSI divisions if agreed) 1 JOB N/A Standardized line-item BOQ for competitive contractor tendering
QS Service Component 02 - Illustrative payment schedule comparison (no site inspection) 1 MO N/A Document-only comparison; no work-in-place certification
QS Service Component 03 - Illustrative change-order quantity comparison 1 COR N/A Illustrative quantity and cost assumptions; no delay opinion
QS Service Component 04 - Illustrative cost schedule reconciliation 1 LS N/A Illustrative reconciliation using client-provided figures

Scope and deliverables

Financial Lifecycle Control & Commercial Cost Management

In large-scale commercial and residential construction, financial oversight must extend far beyond the initial bid. Effective commercial management requires structured Bill of Quantities (BOQ), rigorous interim progress valuations, and forensic change order control.

At F&K Estimatings, our quantity surveyors act as independent financial guardians. We review supplied drawings and quantify materials for the agreed scope. Payment certifications, physical progress inspections and change-order negotiations are not assumed to be included.

Deliverables can include a BOQ or cost schedule with documented measurement assumptions and exclusions, as confirmed in the written quote.

Scope, price, and delivery are confirmed after reviewing the project documents and requested deliverables.

Quantity Surveyor Commercial Financial Ledger and Plan Audit Matrix

Deliverables for your agreed scope

Bill of quantities

A standardized BOQ schedule formatted for transparent tendering, with measured quantities, units and separately stated allowances.

Pre-contract cost plan

Order-of-magnitude budgets and elemental cost plans for feasibility, with the assumptions behind each element stated in writing.

Interim valuation reviews

Document-based reviews of payment schedules and stated quantities, with progress and stored-materials questions recorded for the client.

Final account reconciliation

A comparison of cost schedules, allowances and revisions at closeout, with the items still open listed rather than assumed settled.

Who this service supports

  • Commercial Real Estate Developers
  • Construction Lenders & Banks
  • General Contractors
  • Construction Law Firms
  • Public Agencies & Municipalities

Quantity Surveying: quantities, checks and quote requirements

Quantity surveying produces a measured bill of quantities from the drawings, organized so it can be priced by you or by bidders on the same basis.

Measurement and reporting basis

  • BOQ item description, unit and measured quantity
  • Measurement assumptions and drawing references
  • Provisional quantities or sums identified separately

Documents to include

  • Drawings for the trades you need measured
  • Specifications or finish schedules
  • Your preferred units and spreadsheet layout, if any

Also identify the current revision, addenda, project ZIP code, requested trades and bid deadline.

A scope check before pricing

Agree the measurement conventions and bill-of-quantities structure. Reconcile drawings and specification descriptions so each bidder prices comparable items, with provisional sums identified separately.

Scope limits: Professional registration, lender valuation certification and legal payment certification are not implied.

Worked estimating example

Write a BOQ item that bidders can price consistently

A 200 LF pipe item needs a size, material, specification reference and measurement boundary; the length alone leaves fittings and testing open to interpretation.

What the estimate should record
State what the item includes and where fittings, valves, testing and provisional work appear. Keep uncertain quantities visibly provisional.
Resolve before pricing
Which measurement convention and BOQ item structure does the tender require?

Quantity surveying services for national contractors and measured BOQs

Request a measured bill of quantities with an agreed item structure and measurement rules. A quantity surveyor service should distinguish measured work from provisional items so contractors can compare prices on a common scope without hiding incomplete information in a lump sum.

Measured BOQ

Requested output: Descriptions, units, quantities and drawing references in the agreed work breakdown.

Confirm in your quote: Measurement conventions, trade boundaries and the specification or drawing issue.

Quantity reconciliation

Requested output: A comparison of quantity versions with changes and unresolved items identified.

Confirm in your quote: Common document basis, revised designs and whether existing allowances are retained.

Contractor pricing schedule

Requested output: Agreed quantities organized into the contractor or bid-document cost codes.

Confirm in your quote: Unit definitions, unpriced lines, provisional quantities and rate ownership.

This is a defined quantity measurement and estimating scope. Chartered status, lender valuation, legal payment certification and contract administration are not implied; any separately requested professional function needs its own verified acceptance.

Request this estimating scope

US project coverage for quantity surveying

For US projects, include the ZIP code and the location-sensitive inputs below.

  • State the employer-required measurement rules, project jurisdiction and bill-of-quantities format.
  • Identify regional currency, tax and wage requirements when pricing is included; distinguish measured items from provisional sums.

The proposal records the pricing date, cost sources and unconfirmed allowances. Explore US service area information or send your project details for a scope quote.

Use the document checklist above to request quantities only, a priced estimate or a review of an existing bid.

Request a quantity surveying scope quote

Scope coverage for your bid package

Bill of Quantities (BOQ) Preparation

Detailed, standardized BOQ schedules formatted for transparent contractor tendering and trade buyouts.

Pre-Contract Cost Planning & Feasibility

Order of magnitude budgets, elemental cost plans, and life-cycle cost analysis for real estate developers.

Interim Payment Valuations (Draw Audits)

Document-based review of payment schedules and stated quantities; physical progress and stored materials require independent on-site verification.

Change Order Management & Quantum Claims

Document-based quantity and cost comparisons for change orders; no legal representation or expert claims opinion is implied.

Value Engineering & Cost Optimization

Analyzing alternative structural and MEP systems to reduce capital costs without lowering quality.

Final Account Settlement & Closeout

Comparing provided cost schedules, allowances and revisions; certification or formal closeout approval is outside the standard remote estimating scope.

How your estimate is prepared

Provide the drawings, the contract sum breakdown and the valuation dates. We prepare the BOQ or cost plan from the documents, review interim claims against measured work, and record every assumption in the written output. Our quantity-surveying method, from measurement to final account, sets out the checking steps and version control behind each schedule.

Estimating fees and delivery

Quantity-surveying fees scale with the service and the project value — a single BOQ for one tender takes less estimating time than cost planning plus interim valuations across a full build. The written proposal names the fee and the delivery date for the agreed scope before work begins.

Scope / project typeTypical deliveryTypical fee
Single-trade material takeoffTypically 24–48 hours after approval$150–$1,000 typical
Residential construction estimateTypically 2–4 business days after approval$400–$1,000 typical
Commercial preconstruction packageTypically 3–5 business days after approval$150–$1,000 typical
Industrial & heavy civil takeoffTypically 4–7 business days after approval$1,000–$5,000+ typical
Ongoing estimating supportPriority queue agreed in writing$1,800/mo typical

Surveying fees cover the schedules above. Service type, project size and valuation dates drive the written proposal.

Frequently asked questions

What is the difference between a construction estimator and a quantity surveyor (QS)?

An estimator usually prepares pre-bid quantities and pricing. Quantity surveying can also cover bills of quantities, cost plans, payment valuations and change-order cost reviews. F&K's confirmed deliverable depends on the agreed project scope; site inspections, lender certification and legal claims representation are not included unless expressly agreed and independently verified.

Can a quantity surveyor assist with construction claims and dispute resolution?

We can discuss a document-based review of measured quantities and cost assumptions for a proposed change order. Expert witness reports, legal dispute representation, delay analysis and insurance assessments should not be assumed to be included; ask for a written scope and relevant qualifications before engaging.

How do you manage interim valuations and lender draw fund audits?

Our remote estimating workflow does not establish on-site construction progress or authorize lender disbursements. A qualified on-site inspector or lender-appointed professional should verify physical progress and stored materials. We can discuss document-based quantity or cost schedule support separately.

Do you develop detailed Bill of Quantities (BOQ) per NRM2 / CSI standards?

We can organize quantities and descriptions by an agreed schedule, including CSI MasterFormat divisions where appropriate. RICS NRM2 measurement compliance is not implied; the measurement standard, drawing basis and required output format must be confirmed in the written scope.

What is your typical turnaround for a quantity surveying feasibility report?

Delivery depends on the drawing set, requested trade scope, pricing requirements and bid deadline. The delivery date, scope and revision coverage are confirmed in the written quote after document review.

Share Service: