You send an estimator the same package you would hand a subcontractor on bid day: drawings, specifications, addenda, the bid form, a written scope, and the bid date and location. That package is the answer to “what to send an estimator,” and it decides whether you get a usable number or a week of email tag.
Send a complete set and three things happen. The estimator prices the right scope, the quote comes back without assumptions you have to chase, and the quantity takeoff holds up when the bid is opened. Send a partial set and the estimator either asks questions you could have answered up front or prices around the gaps.
F&K Estimatings works remotely from the drawings, so the file package is the whole job. If you already know you need a takeoff, the quantity takeoff service page shows what comes back. This guide covers what goes in the package before you send it.
The core package: drawings, specifications, addenda, bid form, scope, bid date and location
Every estimate request needs the same six items. Missing any one of them turns a clean takeoff into a guess.
Drawings. The full set, every sheet, including the ones you think don’t matter. A missing structural sheet or a superseded architectural plan is the most common reason a takeoff gets redone. Send the complete drawing set as issued for the bid, not a partial print from a site trailer.
Specifications. The construction specifications control materials, methods, and quality. A drawing shows a wall; the spec tells the estimator what is inside it. Send the full project manual, not just the sections you think are relevant.
Addenda. Each addendum changes the bid. Send every one, and note which addenda are current. An addendum acknowledgment confirmation sheet in your package saves the estimator from pricing an old detail.
Bid form. The bid form tells the estimator how the number must be structured: lump sum, unit prices, alternates, allowances. If the owner requires a specific format, send it.
Scope of work. Write one page on what you want priced. Which trades, which areas, what is excluded. The estimator scope of work statement prevents a quote that covers the wrong square footage.
Bid date and location. The date and time the bid is due, plus the project location. Location drives labor rates, prevailing wage, and logistics. Note any site access constraint notes, like a single gate or no laydown area.
Trade-specific extras (sitework, renovation, MEP and equipment schedules)
The core package gets an estimator started. Each trade needs a few more documents.
Sitework. Send the civil drawings, the grading and drainage plan, the geotechnical report, and any survey data. Cut and fill quantities depend on existing grade, so the survey matters as much as the design.
Renovation. Send existing conditions drawings, demolition plans, and photos of the space. A renovation estimate lives or dies on what is actually there. Site photos and a short note on access and phasing belong in the package.
MEP. Send the mechanical, electrical, and plumbing drawings plus the equipment schedules. Equipment schedules carry the model numbers and capacities that drive material takeoff. Send the specification sections for each trade with them.
Equipment. Send the schedule and the cut sheets. If the owner furnishes equipment, say so. That single note changes the scope.
File formats: vector PDFs, scans, DWG and models
Format decides how fast the takeoff goes and how clean the numbers are.
Vector PDFs are the default. Digital takeoff software like PlanSwift and Bluebeam Revu reads vector linework directly, so measurements come off the geometry rather than a scale. Send vector PDFs when you have them.
Scans work, but they slow the job. A scanned set needs the scale verified and dimensions checked by hand. If a scan is all you have, send the highest resolution available and note the sheet size.
DWG files and models help on complex jobs. A DWG lets the estimator verify dimensions. A building information modeling model supports a BIM takeoff with quantities pulled from the model itself. Send the model with the PDFs, not instead of them, and state which model revision is current.
Cloud links. Large sets travel better as a link than as attachments. A shared-folder or project-platform link, or a Bluebeam share, all work. Send a link that stays live through the bid date and note the file list inside it.
What to write in the request (scope, quantities only or priced, template or cost codes)
The email matters as much as the files. Write four things.
Scope. State the trades and the areas. “Full architectural and structural takeoff, buildings A and B, excluding sitework” is a scope. “Takeoff the plans” is not.
Deliverable. Say whether you want quantities only or a priced estimate. A quantity takeoff gives you measured quantities in a spreadsheet. A priced estimate adds labor, material, and equipment rates. Unit price estimating and assemblies estimating are priced formats; say which you expect.
Format. Send your template if you have one, or your cost codes. If your accounting runs on CSI MasterFormat divisions, say so. If you use estimating software, tell the estimator what import format your system takes.
Deadline. Give the bid date and the date you need the quote in hand, which is usually earlier.
A short written brief beats a long one. Five clear lines get a faster, clearer quote than a paragraph of background.
What to do when the set is incomplete
Incomplete sets are normal, especially on design-build and early-budget work. Don’t wait for a perfect set. Send what exists and label the gaps.
Write a short brief on what is missing and what assumptions you will accept. An allowance assumptions written brief lets the estimator price around the hole instead of stopping. If two spec sections conflict, send a specification conflict summary so the estimator prices the stricter one or asks.
Ask for a pre-bid clarification request log if the job is large. It tracks what was asked and answered, which keeps the estimate aligned with the current design.
Expect the quote to carry a contingency line. An estimator contingency rationale memo explains what the number covers and what it doesn’t. That is not padding; it is the price of pricing an incomplete set honestly.
A short checklist before you press send
Run this list before the email goes out. It is the construction estimating document checklist in one pass.
- Full drawing set, current revision, every sheet
- Full project manual and specifications
- Every addendum, with the current list noted
- Bid form and required bid structure
- One-page scope of work with exclusions
- Bid date, time, and project location
- Trade extras: geotech and survey for sitework, existing conditions and photos for renovation, equipment schedules for MEP
- File formats: vector PDFs, DWG or model if available, a live shared-folder or project-platform link for large sets
- Deliverable stated: quantities only or priced, and the format
- Template or cost codes attached
- Contact name and phone for questions
If a package has bid bond documentation or prevailing wage requirements, note them. A prevailing wage determination copy changes labor rates, and the estimator needs it before pricing, not after.
How it works: send plans, written quote (scope, fee, date), takeoff in PlanSwift / Bluebeam Revu, delivery
The process at F&K runs in four steps.
Send the plans. Email the package to info@fandkestimatings.us or share a cloud link. Include the scope and the deadline.
Get a written quote. After document review, you get a written quote that confirms the scope, the exact fee, and the delivery date. The quote is the contract for the work; nothing starts until you approve it.
Takeoff. The estimator works the set in PlanSwift or Bluebeam Revu, measuring quantities from the drawings and cross-checking them against the specifications and schedules.
Delivery. You get an Excel quantity sheet plus color-coded marked-up PDFs. The markup shows what was measured and where, so you can check the takeoff against the drawings line by line. That estimator quantity takeoff backup is what makes the number defensible at bid leveling.
Pricing and turnaround
Published tiers give you a planning range. The written quote after document review confirms the exact fee and delivery date.
| Package | Typical fee | Typical turnaround |
|---|---|---|
| Small single-trade takeoff | $150–$400 | 24–48 hours after approval |
| Mid-size single-trade priced estimate | $400–$900 | 24–48 hours after approval |
| Multi-trade package | $900–$2,500 | 3–5 business days |
| Industrial and heavy civil takeoff | $1,000–$5,000+ | 4–7 business days |
| Ongoing estimating support | $1,800 per month | Ongoing |
Most single-trade work is delivered in 24–48 hours after approval. Multi-trade packages take 3–5 business days. Industrial and heavy civil takeoffs run 4–7 business days. The full pricing page has the details, and the samples page shows what a delivered takeoff looks like.
FAQs
What do I need to send an estimator?
Send the full drawing set, specifications, every addendum, the bid form, a one-page scope of work, and the bid date and location. Add trade extras like the geotech report for sitework or equipment schedules for MEP. The estimator document list above covers the whole package.
Can you start from an incomplete set?
Yes. Send what exists and write a short brief on the gaps and the assumptions you will accept. The quote will carry a contingency line for the missing scope, and the estimator will note what needs a follow-up when the set is complete.
What file format should I use?
Vector PDFs first. Add DWG files or a BIM model when you have them, and say which revision is current. For large sets, send a live shared-folder or project-platform link rather than attachments.
Do I need to send the specifications and addenda?
Yes, both. The specifications control materials and methods the drawings don’t show. Addenda change the bid, so send every one and note which are current. Pricing an old detail is the most avoidable error in estimating.
How do I send large plan sets?
Use a cloud link that stays live through the bid date. Include a file list in the email so the estimator can confirm nothing is missing. If you must attach, split the set by discipline and number the emails.
What happens after I send the files?
You get a written quote confirming scope, fee, and delivery date after document review. Once you approve it, the takeoff runs in PlanSwift or Bluebeam Revu and comes back as an Excel quantity sheet plus color-coded marked-up PDFs.
Use the checklist, then email the set to info@fandkestimatings.us for a written quote. Call +1 (317) 751-5969 if you have questions about the package. For a closer look at what a delivered takeoff contains, see the quantity takeoff service page, and check the samples page for the Excel and markup format.