A bid day checklist is the final pass you run before a bid leaves your hands. It covers the deadline and submission method, every addendum, the instructions to bidders, the largest quantities and units, subcontractor and supplier quotes, pricing build-up, alternates, and the confirmation you keep after you hit send. Used well, it works as a guardrail: it catches the small errors that disqualify a bid and the big ones that win work at a loss. F&K Estimatings builds bid day checklists into every takeoff we deliver, and our bid management service exists for teams that want the final pass handled with the same care as the estimate.
The benefits are simple. You submit on time. You submit what the owner asked for. You submit numbers you can defend. And you keep a record of what you sent.
The main uses: a construction bid day checklist for general contractors, a bid submission checklist for single-trade shops, and a pre-bid review for anyone pricing from a takeoff. The parts: deadline and method, addenda, instructions and bid form, quantity spot-checks, sub and supplier quotes, pricing build-up, alternates and unit prices, exclusions, and the submission file.
Confirm the deadline, time zone and submission method
Write the deadline down twice: once in local time where you sit, once in the owner’s time zone. A 2:00 p.m. bid in Eastern time is 11:00 a.m. for a Pacific estimator, and the portal will not care which clock you watched.
Then confirm how the bid goes in. Portal upload, email, fax, or hand delivery each fail in their own way. Portals time out, email filters quarantine attachments, and paper bids need a courier you scheduled yesterday.
Check three more things before you touch the price:
- Whether the owner wants a sealed bid or an emailed PDF.
- Whether the bid form needs a wet signature or an electronic one.
- Whether the portal requires registration days ahead of time. If you have never used the portal, log in before bid day. Password resets have killed more bids than bad math.
Collect and acknowledge every addendum
Addenda change scope, and scope changes price. List every addendum by number and date, and tick each one against the documents you actually priced.
Then check the bid form. Most forms have an acknowledgment line for each addendum. An unacknowledged addendum can make your bid nonresponsive, no matter how good the number is.
If an addendum lands late, re-measure only the affected scope. Our breakdown of takeoff revisions and bid addenda walks through how to scope that work. A last-day re-measure is possible only when a written quote can confirm a delivery date that still meets the bid. Nobody can promise that in advance, so ask early.
Re-read the instructions to bidders and the bid form
The instructions to bidders tell you what a responsive bid looks like. Read them with a pen. Mark every requirement: bid security, unit price columns, alternates, allowances, delivery terms, and the exact order of the forms.
Then read the bid form itself, line by line. Owners bury requirements in the fine print:
- A specific unit price format.
- A required schedule of values.
- A list of subcontractors to name.
- A certification signature on a specific page.
Missing one line can void the bid. This is where a construction bid day checklist earns its keep. The instructions do not change on bid day, so the check is fast: does the form match what you prepared?
Spot-check the largest quantities and units
You will not redo the takeoff on bid day. You will spot-check the items that carry the most money.
Pull the top ten line items by extended price. For each one, confirm the quantity, the unit, and the waste or coverage factor. Unit errors cost more than math errors. A line priced per square foot when the form asks per linear foot can swing a large bid by a wide margin.
Check the units on the bid form against your quantity takeoff sheet. They should match exactly. If the form says cubic yards and your sheet says tons, convert once, write the conversion down, and check it twice.
Our deliverables make this pass easy: an Excel quantity sheet plus color-coded marked-up PDFs, so the top items are visible at a glance.
Confirm subcontractor and supplier quotes
Call or email every sub and supplier whose number you carried. Confirm four things: the scope they included, the price, the quote’s expiration, and whether they have seen all addenda.
Level the quotes before you plug them in. Our guide to subcontractor bid leveling shows how to compare scope, not just totals. Two quotes with the same bottom line can cover different work, and the gap shows up after award.
Write down who quoted what and when. If a sub backs out after you submit, the record tells you which number you carried and why.
Check labor, material, general conditions, bonds and taxes
Walk the pricing build-up once, top to bottom:
- Labor: hours, rates, and burdens. Confirm the crew size and duration behind the labor number.
- Material: current prices, sales tax treatment, and freight.
- General conditions: supervision, temporary facilities, cleanup, and the duration you priced. Bonds and insurance: the rate, the base it applies to, and whether the owner requires both payment and performance bonds.
Taxes: exempt or not, and which line items carry tax.
These categories hide the quiet losses. A missing bond premium or a general conditions duration that is two months short will not stop you from winning the bid. It will stop you from making money on it.
Fill alternates, unit prices and allowances deliberately
Alternates are not afterthoughts. Price each one as if it will be accepted, because it might be. Read the alternate schedule and match your numbers to the exact scope described.
Unit prices need the same care. They are the prices the owner uses for changes, so a low unit price becomes a gift you gave away. Build each unit price from the same labor and material logic as the base bid.
Allowances are pass-through numbers with a defined scope. State what the allowance covers and what happens when the actual cost exceeds it. If the form lets you note the basis, note it.
Write exclusions and clarifications the form allows
Every bid carries assumptions. The checklist question is whether the form gives you a place to state them. Many do: a clarifications section, a remarks box, or an attached letter.
Use that space. Write short, plain exclusions:
- “Excludes rock excavation.”
- “Pricing based on addenda 1 through 3.”
- “Temporary power by others.”
Keep the list tight. A page of exclusions reads as a warning; five clear lines read as a professional boundary. If the form forbids qualifications, do not add them. A qualified bid can be rejected as nonresponsive.
Submit, save the confirmation, and file the plug list
Submit with time to spare. Aim for an hour of buffer, more for portals.
After you send:
- Save the confirmation page, email receipt, or timestamped screenshot.
- Save the exact file you submitted, plus the bid form and all attachments.
- File your plug list: every number you carried, where it came from, and the assumptions behind it.
The plug list is your defense if the owner questions a number or a sub disputes scope. It also seeds the next bid on similar work.
When a last-day quantity check or addendum re-measure is worth requesting
Sometimes the documents change too close to the deadline to absorb quietly. Request a last-day quantity check or addendum re-measure when:
An addendum changes a quantity you priced, and the change is large enough to move the bid.
The bid form and your takeoff disagree on units for a top item.
A sub’s quote arrives with a scope gap you cannot resolve by phone.
A re-measure is possible only if a written quote can confirm a delivery date that still meets the bid. Our pricing page shows typical ranges: small single-trade takeoffs run $150–$400, mid-size single-trade priced estimates $400–$900, and most single-trade work is delivered in 24–48 hours after approval. Multi-trade packages run $900–$2,500 in 3–5 business days. Industrial and heavy civil takeoffs run $1,000–$5,000+ in 4–7 business days. Ongoing estimating support is typically $1,800 per month. The written quote after document review confirms the exact fee and delivery date. If the schedule cannot be met, the honest answer is no. A rushed number that misses the bid helps nobody.
FAQs
What should I check on bid day?
Run the full list: deadline and time zone, submission method, addendum acknowledgment, the bid form and instructions, the top quantities and units, sub and supplier quotes, labor and material build-up, bonds and taxes, alternates and unit prices, exclusions, and your save file after submission.
What if an addendum arrives the morning of the bid?
Read it, price the changed scope, acknowledge it on the form, and re-check any quantity it touches. If the change is large, request a re-measure only when a written quote can confirm a delivery date that still meets the bid.
Can F&K re-measure a change on bid day?
Sometimes. It depends on the scope, the documents, and the deadline. Send the current set and the addendum, and we will confirm in writing whether a delivery date before the bid is possible. We do not promise rush turnaround.
How is this different from a bid-preparation guide?
A bid preparation guide covers the whole cycle, from go/no-go to pricing. This checklist covers the final pass: what to verify in the last hours before you submit. Use the guide to build the bid and this list to close it.
Should unit prices match the takeoff breakout?
Yes. Unit prices should trace back to the same labor, material, and quantity logic as the base bid. If a unit price cannot be explained from the takeoff, fix it before submission.
What do I save after I submit?
Save the confirmation, the submitted file, the bid form, all addenda, and your plug list. Keep them together. They answer questions after award and support the next bid.
If quantities still need a last-day check or an addendum re-measure, send the current set to info@fandkestimatings.us for a written quote. You can also reach us at +1 (317) 751-5969. We use PlanSwift and Bluebeam Revu, and deliver an Excel quantity sheet plus color-coded marked-up PDFs. For teams that want the final pass handled end to end, start with bid management.