F&K Estimatings Construction Estimating & Takeoffs

CSI DIVISION 07 WATERPROOFING & SEALANTS

Waterproofing Estimating Services & Material Takeoffs for Contractors

Price your waterproofing bid from a measured scope: below-grade membranes, deck coatings, waterstops, joint sealants, protection boards and drainage layers. Receive editable Excel quantities and PDF markups organized by system and location. Send plans for a quantities-only takeoff or a priced estimate with agreed cost inputs.

Single-trade material takeoff
$150–$1,000 typical
Typical delivery
Typically 24–48 hours after approval
Deliverables
Excel + marked-up PDFs

We confirm the fee and delivery date in writing after reviewing your drawings. See scope-specific fees and timing.

Last reviewed · Prepared with

Your next contractor bid

Request a waterproofing estimating quote

Send the below-grade or deck plans, sections, specifications and transition details. Identify drainage, protection and penetrations that belong in the requested waterproofing scope. We confirm the deliverables, fee and delivery date in writing after document review.

Useful documents for this scope

  • Foundation and below-grade details
  • Waterproofing specification
  • Geotechnical groundwater information

Separate field membrane from termination work

Track membrane area, termination lengths and penetration counts separately. Check who carries drainage and protection board, and flag missing transition details before pricing overlaps or accessory quantities. Inspect the sample deliverable formats and tell us which outputs you need.

Remote support across the United States. View service areas.

Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.

Scope and deliverables

Documented CSI Division 07 Waterproofing Takeoffs

Request a waterproofing takeoff for a contractor bid, supplier comparison or agreed priced estimate. Separate below-grade membranes, fluid-applied systems, traffic coatings and joint work by the specified assembly and location so each bid covers the same work.

At F&K Estimatings, our moisture protection estimators audit foundation structural details, architectural wall sections, civil site connections, and waterproofing manufacturer specifications. We quantify membrane square footages, drainage boards, termination bars, waterstops, and perimeter joint sealants.

The proposal identifies the specified waterproofing systems, measurement basis, pricing inputs and unresolved details. Scope, fee and delivery date are confirmed after reviewing the project documents.

Scope, price, and delivery are confirmed after reviewing the project documents and requested deliverables.

Quantity takeoff worksheet with a CSI division summary beside a marked-up floor plan

Deliverables for your agreed scope

Color-Coded PDF Markups

High-resolution drawing sheets with every line item, area polygon, and linear foot color-coded in Bluebeam.

Itemized CSI Excel Schedules

Measured quantities organized by CSI MasterFormat, with units and separately stated waste allowances. Labor, material and equipment rates are included only in an agreed priced estimate.

Project-Specific Pricing Basis

Cost assumptions are stated in the written proposal and can use client rates, supplier quotes, or another identified basis.

Pre-Bid RFI & Scope Gap Audit

Scope-gap notes and drawing clarifications for the agreed trades. A separate constructability review is included only when specified in the written quote.

Who this service supports

  • Waterproofing Subcontractors
  • General Contractors
  • Caulking & Sealant Contractors
  • Parking Structure Builders
  • Restoration Specialists

Waterproofing: quantities, checks and quote requirements

Waterproofing takeoffs measure below-grade and plaza membranes, dampproofing, drainage boards, joint sealants and traffic coatings by area and length.

Measurement and reporting basis

  • Below-grade membranes and dampproofing (SF)
  • Drainage board and protection (SF)
  • Plaza and deck waterproofing (SF)
  • Joint sealants (LF)
  • Traffic coatings (SF)

Documents to include

  • Foundation and below-grade details
  • Waterproofing specification
  • Geotechnical groundwater information

Also identify the current revision, addenda, project ZIP code, requested trades and bid deadline.

A scope check before pricing

Separate below-grade wall and horizontal deck SF from joint and termination LF. Identify lap, upstand, corner, drainage-board and protection-course quantities from the assembly details.

Scope limits: Waterproofing-system design, substrate inspection and leak testing are excluded; concealed conditions need client evidence.

Worked estimating example

Separate membrane area from terminations

A 100-foot wall at 8 feet high provides 800 SF of vertical field area. Its top termination is 100 LF; corners, laps and penetrations need their own measured or stated basis.

What the estimate should record
Identify the field membrane, protection course, drainage layer and transition details separately. Avoid hiding every accessory inside a single area allowance.
Resolve before pricing
Which assembly details define laps, upstands and responsibility at adjoining systems?

Waterproofing estimating services for defined membrane and joint packages

Waterproofing takeoff services separate membrane areas from joint, termination and transition lengths. Request a below-grade waterproofing takeoff with wall and slab boundaries identified so protection, drainage and interface work are not omitted from the supplier or installation bid.

Membrane area takeoff

Requested output: Net areas by location and specified system, with laps or upstands separately stated.

Confirm in your quote: Assembly details, opening deductions and horizontal versus vertical work.

Joints and transitions

Requested output: Lengths or counts for joints, terminations, corners and penetrations.

Confirm in your quote: Specified accessories, tie-ins and trade responsibility at each interface.

Protection and drainage scope

Requested output: Quantities for shown protection board, drainage layers and agreed accessories.

Confirm in your quote: Excavation boundaries, backfill ownership, substrate preparation and access assumptions.

The takeoff follows the supplied details. Substrate inspection, system design, manufacturer approval, leak testing and warranties are separate responsibilities that must be confirmed before installation.

Request this estimating scope

US project coverage for waterproofing

For US projects, include the ZIP code and the location-sensitive inputs below.

  • Include project-specific waterproofing assemblies, substrate details and supplier delivery quotations.
  • Identify excavation access, groundwater information where documented and protection requirements separately from membrane area and joint lengths.

The proposal records the pricing date, cost sources and unconfirmed allowances. Explore US service area information or send your project details for a scope quote.

Use the document checklist above to request quantities only, a priced estimate or a review of an existing bid.

Request a waterproofing scope quote

Scope coverage for your bid package

CSI Division 07 13 - Sheet Waterproofing

Self-adhered bituminous sheets, bentonite geotextiles, pre-applied HDPE blindside sheets (Preprufe).

CSI Division 07 14 - Fluid-Applied Membranes

Hot-applied rubberized asphalt, cold fluid polyurethanes, air/vapor barriers, and spray elastomeric coatings.

CSI Division 07 18 - Traffic Coatings

Pedestrian balcony coatings, multi-coat vehicular parking deck systems, and mechanical room flooring.

CSI Division 07 11 - Dampproofing

Bituminous foundation coatings, asphalt emulsions, parging, and vapor retarders on CMU/CIP.

Subsurface Drainage & Protection Boards

Dimpled HDPE drainage composites, filter fabrics, XPS protection boards, and perforated drain tile.

Joint Sealants & Expansion Joint Systems

Architectural silicone, urethane joint sealants, backer rods, preformed silicone extrusions, and waterstops.

What to include in your waterproofing bid package

Tell us whether you need a purchase-quantity list, a subcontractor bid takeoff or an estimate with installation costs. Measure each specified system by location so a below-grade wall, plaza deck and traffic-coating area remain separate in the workbook.

  • Quantity schedule: net membrane SF, separately stated laps and upstands, termination and waterstop LF, penetration counts and protection or drainage layers.
  • Pricing scope: identify product quotations, specified coverage, coats, substrate preparation and access inputs when a priced estimate is requested.
  • Bid clarifications: record missing joint details, tie-ins to adjacent systems, work supplied by others and existing conditions that the drawings do not establish.

Start with the current plans, foundation sections, waterproofing details, specification and addenda. Review the worked waterproofing schedule or request a quote for your package. The quote confirms the fee, included systems and delivery date after document review.

From waterproofing details to a measurable bid scope

System, quantity output and information to confirm
SystemQuantity outputConfirm before pricing
Sheet membraneNet SF by location; laps and detail strips separatelySections, returns, upstands, roll size and specified lap rules
Fluid-applied or traffic coatingSF by substrate and specified systemCoats, specified thickness, product coverage, primer and aggregate
Waterstops and joint sealantsLF by joint type; intersections and accessories separatelyJoint details, dimensions, preparation and trade responsibility
Protection and drainage layersSF or LF by specified layer and connectionTermination details, outlet connections and items supplied by others

Keep waterproofing separate from the roofing takeoff and reconcile shared interfaces through the thermal and moisture protection scope. For measured quantities across several trades, use our quantity takeoff services.

Keep membrane areas and waterproofing details separate

The main membrane area is only one part of a waterproofing bid. Identify systems and interfaces from the issued details before attaching rates.

Documents, workbook fields and bid checks to agree in your quote
Document inputWorkbook fields to agreeBid comparison check
Foundation elevations + waterproofing detailsBelow-grade wall/slab SF by membrane system and locationState net measurement, laps and upstands separately; do not infer concealed conditions.
Penetration and joint detailsWaterstops, terminations, transitions and sealants in LF or EAAgree who owns interfaces at concrete joints, openings and services.
Protection and drainage specificationsProtection boards, drainage layers and accessories by unitIdentify layers included with the membrane quote and separately supplied work.
Wet-area finish details + phasingShower/plaza/deck zones, testing requirements and access allowancesSeparate waterproofing from tile setting, roofing, structural repair and field testing.

For a priced estimate, confirm the specified product, coverage/thickness, substrate preparation, application method and access. Product approval, water-tightness certification and testing remain separate responsibilities.

Tile and flooring package boundariesConcrete substrate and joint scope

Worked Example: CSI Division 07 Quantification Schedule

Illustrative below-grade membrane, traffic coating, drainage and waterstop entries. Quantities and percentages show the format; they are not client work, a complete project total or product-specific ordering recommendations.

Commercial Waterproofing & Traffic Coating Schedule

Worked estimating example. Quantities show the stated scope and format; this is not a client project or a project-specific price quote.

CSI Scope Description Quantity Unit Waste Allowance Estimator Code Note
Division 07 13 26 - Self-Adhering Sheet Waterproofing (60-mil Below-Grade) 24,500 SF 10% Lap/Cut Applied to CIP basement walls with primer and termination bar
Division 07 18 13 - Vehicular Traffic Coating (Heavy-Duty Urethane System) 36,000 SF 8% Primer + Base Coat + Aggregate Broadcast + Wear Topcoat
Division 33 46 16 - Prefabricated Dimple Drainage Composite Board 24,500 SF 5% Includes filter fabric and connection to base footing drain pipe
Division 07 92 00 - Continuous Hydrophilic Bentonite Waterstop Strip 2,850 LF 5% Fastened at cold joint between concrete footing and foundation wall

Before converting membrane SF into rolls, record the specified roll dimensions, side and end laps, upstands, returns and detail strips. For liquid systems, record coverage at the specified thickness and each required coat. The GCP BITUTHENE product data illustrates why laps, terminations and protection need their own review; it is not a product selection for your project. Confirm the current specified manufacturer's instructions rather than applying the example percentages to every system.

How your estimate is prepared

Send the current drawings and deadline. We confirm scope, fee and delivery before measuring the agreed work and recording assumptions. Your package identifies the document issue, quantities and any agreed pricing inputs. Review our measurement and quality review method for software, version control and checking procedures.

Estimating fees and delivery

Most single-trade estimates are delivered in 24–48 hours; larger packages take longer and the written quote confirms the date Exact fee and date are confirmed in the written quote.

Scope / project typeTypical deliveryTypical fee
Single-trade material takeoffTypically 24–48 hours after approval$150–$1,000 typical
Residential construction estimateTypically 2–4 business days after approval$400–$1,000 typical
Commercial preconstruction packageTypically 3–5 business days after approval$150–$1,000 typical
Industrial & heavy civil takeoffTypically 4–7 business days after approval$1,000–$5,000+ typical
Ongoing estimating supportPriority queue agreed in writing$1,800/mo typical

These are estimating-service fees. Drawings, scope and requested delivery determine the written proposal.

Frequently asked questions

How much does a waterproofing takeoff cost?

Typical single-trade takeoff fees are $150–$1,000 typical. The number of waterproofing systems, detail sheets, measurement zones and requested pricing determine the exact scope. Send the current plans and bid deadline for a written proposal confirming fee, deliverables and delivery date.

What is included in waterproofing estimating services?

The agreed scope identifies membrane areas by system and location, laps and detail strips, terminations, waterstops, sealants and protection or drainage layers shown in the documents. Quantities-only takeoffs and priced estimates have different outputs. A priced package also records material quotations, installation rates and unresolved access or substrate assumptions.

What documents do you need for a waterproofing estimate?

Send plans, foundation and wall sections, joint and termination details, the waterproofing specification, issued addenda and project location. Include the specified system and product data, substrate information and requested bid breakdown. Missing dimensions, system selections or existing conditions need clarification; measurement does not replace waterproofing design or field testing.

Do you calculate measured square footage for below-grade foundation membranes?

The agreed takeoff can separate below-grade wall and slab areas by the specified membrane system. Details identify upstands, laps, corners and terminations; keep these separate from net areas and accessory lengths. Missing dimensions or unresolved details are recorded for clarification rather than assumed to be included.

Can you estimate hydrophilic waterstops, bentonite sheets, and injection tubes?

Waterstops, bentonite sheets and injection tubes can be listed by system, location and unit from the issued joint details and specifications. Confirm responsibility for interfaces and any supplier package before pricing. Quantifying these items does not certify structural water-tightness or replace system design and site testing.

How do you handle dimple drainage mats, protection boards, and root barriers?

Our waterproofing estimators calculate square footage for dimpled HDPE drainage boards with geotextile filter fabric, extruded polystyrene protection boards, and root barrier membranes for green roofs and split-slab plaza decks.

Do your takeoffs include vehicular and pedestrian traffic coatings?

Yes. We provide comprehensive takeoffs for multi-layer polyurethane/epoxy vehicular traffic coatings on parking garages, pedestrian balcony coatings, and mechanical equipment room waterproof flooring including primers and aggregate broadcasts.

What is your typical turnaround for a commercial waterproofing takeoff?

Delivery depends on the drawing set, requested trade scope, pricing requirements and bid deadline. The delivery date, scope and revision coverage are confirmed in the written quote after document review.

Share Service: