F&K Estimatings Construction Estimating & Takeoffs

Construction Estimating Services for Australian Builders and Trade Contractors

Send your Australian tender package to F&K for a measured quantity takeoff, a bill of quantities check, or a priced estimate in Australian dollars. F&K is a remote, US-based estimating team that supports builders and trade contractors on industrial, commercial and multi-residential work. We are not a quantity surveying practice registered with the AIQS, so where a client needs a professional QS to certify a bill, that stays with your own surveyor. Turnaround is typically 24-48 hours once the package is complete, and the written quote confirms the trades, the workbook format and the delivery date first.

Bid packages and deliverables

Industrial and warehouse packages

Slabs, tilt-up or precast panels, steel frames, cladding and hardstand are measured as separate packages so supplier quotes compare against the same scope. Site works and external services stay apart from the building.

Commercial estimating

Multi-residential and commercial fit-out

Repeated apartment or tenancy types are measured once and multiplied, with common areas, podium levels and basement structure kept separate. A finish or layout change to one type then reprices cleanly.

Drywall takeoff scope

Bill of quantities cross-check

If a consultant QS has issued a bill, we check quantities against the drawings and report missing, duplicated or superseded items by item number, giving your estimator a clean query list for the tender period.

Quantity takeoff deliverables

Concrete slabs and tilt panels

Slab area, thickness, edge beams and thickenings are measured from the structural drawings, with panels taken net of openings. Concrete is in cubic metres and reinforcement in tonnes, with joints, inserts and lifting items on their own lines.

Concrete estimating

Structural steel and metalwork

Members, bracing, purlins and connections are separated so fabrication, galvanising and erection allowances are visible when supplier quotes are compared. Miscellaneous metals stay on their own lines.

Structural steel estimating

Plasterboard, ceilings and partitions

Walls are split by type, height and rating, with framing, linings, insulation and ceilings counted separately. Bulkheads, shafts and set-downs are listed so they are not hidden inside a rate per square metre.

Drywall estimating

The written quote confirms the included trades, output, fee and delivery date. For multi-package tenders, tell us whether you need one consolidated workbook or separate returns by trade, building or tender lot.

Warehouse tender scope check

Before pricing an Australian warehouse, confirm the structural and architectural drawing issues, the geotechnical report, and what is included in the head contractor's preliminaries. Check slab thickness and finish, panel openings, hardstand extent, and who supplies services and fire systems. Confirm the contract form, security-of-payment obligations in the state, and the tender close time with its time zone.

Illustrative warehouse slab and tilt-panel rollup
ScopeExample inputWorkbook entry
Ground slab60 m × 40 m × 0.2 m480 m³ of slab concrete before waste.
Edge thickenings200 m perimeter × 0.4 m × 0.3 m24 m³ of additional concrete in the thickenings.
Tilt panels200 m perimeter × 9 m high = 1,800 m² less 150 m² of door openings1,650 m² of net panel area, with panel marks and openings listed separately.

The quantities are illustrative. Use the current tender documents and agreed scope to prepare your bid.

Return quantities by element, with drawing issue, thickness, panel schedule and measurement basis identified on every sheet.

The code behind the quantities: the NCC and state variations

Australia's technical building requirements sit in the National Construction Code, produced and maintained by the Australian Building Codes Board on behalf of the federal, state and territory governments. The Building Code of Australia is Volumes One and Two, covering Class 2 to 9 buildings and Class 1 and 10 buildings respectively, and the Plumbing Code of Australia is Volume Three.

NCC 2022 was adopted by the states and territories on 1 May 2023, and the ABCB's edition page notes that Amendment 2 superseded Amendment 1 from 29 July 2025. States and territories can add variations, so the edition and variations that bind a tender are the ones in force where the site is. We measure to what the tender documents and permit cite and flag items that appear to depend on a code change.

Measurement rules: ANZSMM and consultant bills

Australian bills of quantities are commonly prepared to the Australian and New Zealand Standard Method of Measurement of Building Works, published by the Australian Institute of Quantity Surveyors. It gives a uniform basis for measuring building works so that tenderers price the same thing.

If your tender bill cites the ANZSMM or a bespoke method, tell us when you send the package and the workbook follows it. Where there is no stated method, we list the assumptions used so your estimator can adjust them before pricing.

GST, contracts and security of payment

Tender pricing in Australia is usually stated either including or excluding GST, so the workbook keeps GST on a separate line and the quote confirms which basis it uses. Whether and how GST applies to your supply is a tax matter for your accountant.

Many projects use the AS 4000 family of contracts or a bespoke head contract, and each state has its own security-of-payment regime. We measure to the documents in the pack and flag exclusions, provisional sums or clauses that appear to move quantity risk onto the bidder.

Send your Australia tender package

Include the following in your request.

  • Site address, state, project type, contract form and tender close time with time zone
  • Drawings, specification, geotechnical information and any bill of quantities issued
  • Trades to price, preliminaries position, and the pricing basis in Australian dollars

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.

    Tender reference

    The ABCB publishes the National Construction Code editions and amendments, so confirm the edition your permit cites before the tender is priced. Australian Building Codes Board: NCC 2022

    Frequently asked questions

    Do you measure to the ANZSMM?

    Yes, when your tender bill or client specifies it. Tell us at the start and the workbook follows the stated method. If none is stated we list our measurement assumptions.

    Are you a registered quantity surveying practice?

    No. F&K is a remote US-based estimating team. We produce measured quantities and priced estimates for your bid, but if a client or contract needs a professional QS to certify a bill, that stays with your own surveyor.

    Which NCC edition do you work to?

    The edition your tender documents and permit cite, with any state or territory variations they reference. We do not assume a code edition silently; we state it in the workbook.

    Can you price in Australian dollars, with GST shown separately?

    Yes. The workbook carries AUD pricing inputs for the agreed scope and shows GST on its own line. Rates come from your supplier quotations or the pricing basis agreed in the written quote.

    What do you need from me, and how fast is the return?

    Send the drawings, specification, any issued bill, the state, the trades to price and the tender close time. Typical turnaround is 24-48 hours once the package is complete, confirmed in the written quote.

    Browse estimating services and trades

    Find the drawings, quantities and deliverables for your scope. For a Australia project, share your bid documents so we can confirm which items belong in the quote.