CSI DIVISION 07 80 FIREPROOFING

Fireproofing Estimating and Firestopping Takeoffs

Commercial and industrial fireproofing takeoff services across the USA. We calculate SFRM bag yields, intumescent dry film thickness (DFT), perimeter edge safing, and UL penetration firestops with 99% accuracy.

Commercial Fireproofing Spray and UL Structural Steel Takeoff Plan
Forensic Cost Engineering

UL-Compliant Fireproofing Takeoffs

Fireproofing and firestopping estimating demands exact compliance with Underwriters Laboratories (UL) design standards. Calculating steel coating without accounting for member weight-to-perimeter (W/D) ratios or overspray loss on corrugated deck leads to severe bidding miscalculations.

At F&K Estimatings, our passive fire protection cost engineers cross-reference structural steel sizes against UL directories. We calculate board foot quantities for SFRM, mil thicknesses for intumescent paint, and line-item penetrations for MEP firestopping.

We provide transparent, audit-ready Excel schedules and color-coded markups within 24 to 48 hours to help you win profitable contracts.

99%
Quantity Accuracy
24-48h
Standard Turnaround
5,000+
Projects Estimated

Contractors & Builders We Serve

Our preconstruction deliverables are tailored to the exact financial requirements of industry stakeholders:

Fireproofing Subcontractors

Bidding on commercial SFRM spray, intumescent steel coatings, and high-rise fire protection packages.

Firestop Specialty Contractors

Quantifying penetration counts, top-of-wall safing linear footage, and UL detail compliance.

General Contractors

Auditing Division 07 80 packages and verifying UL design compliance on structural drawings.

Industrial Painting Contractors

Pricing shop-applied or field-applied intumescent coatings on architectural exposed steel.

Mechanical / Electrical Contractors

Quantifying required firestop sleeves and collars for trade-specific wall penetrations.

Comprehensive Scope Coverage

We provide full digital quantification across all related CSI MasterFormat divisions:

CSI Division 07 81 - Spray-Applied Fireproofing (SFRM)

Standard, medium, and high-density cementitious fireproofing on structural beams, columns, and metal decking.

CSI Division 07 81 23 - Intumescent Fireproofing (Thin-Film)

Architectural thin-film intumescent coatings for exposed structural steel, atriums, and canopies.

CSI Division 07 84 13 - Penetration Firestopping

Intumescent sealants, firestop pillows, composite sheets, wrap strips, and cast-in devices for MEP trades.

CSI Division 07 84 43 - Joint Firestopping (Safing)

Top-of-wall deflection joints, perimeter fire containment (curtain wall to slab edge), and expansion joints.

Rigid Board Fire Protection

Calcium silicate and mineral wool rigid boards for structural columns, grease ducts, and electrical circuits.

Thermal Barrier & Ignition Barrier Spray

Spray polyurethane foam (SPF) ignition and thermal barriers for attics and crawl spaces.

Deliverables Included in Every Takeoff Package

Color-Coded PDF Markups

High-resolution drawing sheets with every line item, area polygon, and linear foot color-coded in Bluebeam.

Itemized CSI Excel Schedules

Spreadsheets broken down by CSI MasterFormat with dynamic formulas, labor rates, and waste allowances.

RSMeans Localized Labor Burdens

Cost adjustments mapped to your exact project ZIP code for localized wage rates and material price shifts.

Pre-Bid RFI & Scope Gap Audit

Constructability review identifying missing architectural-structural coordination points and plan conflicts.

Sample CSI Division 07 80 Quantification Schedule

SFRM board footages, intumescent coating areas, firestop collars, and head-of-wall joints:

Commercial Fireproofing & Firestopping Schedule
Material / Scope Item Base Qty Unit Waste / Lap Factor Estimator Note
Division 07 81 00 - Spray-Applied Fire Resistive Material (SFRM) - 2-Hr Restrained Beams 42,000 BF 25% Overspray Monokote MK-6 / Isolatek Type 300 applied to 1-1/16in thickness
Division 07 81 23 - Thin-Film Intumescent Coating (Exposed Architectural Columns) 2,400 SF 15% Applied to 120 mils DFT for 2-hour rating per UL design
Division 07 84 13 - Penetration Firestop Collars (2-Hr Rated Restroom Stacks) 140 EA N/A Hilti CP 643N intumescent firestop collars for PVC/ABS waste lines
Division 07 84 43 - Joint Firestopping (Top of Rated Wall to Fluted Metal Deck) 3,600 LF 8% Mineral wool safing + spray elastic firestop sealant per UL HW-D series

Software Digitizers & Standards Applied

Software / Tool Engineering Purpose Compliance Standard
PlanSwift Pro Digitized linear, count, and area takeoff quantification Industry Benchmark
Bluebeam Revu Vector drawing markup, multi-discipline overlay & RFI logging CSI MasterFormat
RSMeans Online Localized quarterly labor and material pricing indexing ZIP Code Calibrated
AutoCAD & Revit BIM 3D model quantification and CAD layer geometry verification AACE International
FastPIPE & FastDUCT Specialized MEP piping, ductwork and equipment mapping SMACNA / ASHRAE

Estimated Pricing & Delivery Timelines

Scope / Project Type Average Turnaround Estimated Rate
Single Trade / Material Takeoff 24-48 Hours $150 - $350
Full Project Scope / General Contractor 2-4 Business Days $450 - $1,200
Large Commercial / Multi-Family ($5M+) 3-5 Business Days Custom Flat Quote
Monthly Estimating Retainer (10+ Bids) Priority 24hr Queue $1,800/mo Flat

* Exact rates depend on sheet count, specification complexity, and bidding deadline. Upload your plans for a firm 15-minute quote.

Frequently Asked Questions

Do you calculate intumescent coating Dry Film Thickness (DFT) by steel W/D ratios?

Yes. Our fireproofing cost engineers calculate exact DFT thickness requirements (mils) based on each structural steel member's W/D (weight-to-heated perimeter) or A/P ratio and the specified 1, 2, or 3-hour fire rating per UL Design directories (e.g., UL X600 series).

Can you estimate Spray-Applied Fire Resistive Materials (SFRM) bag counts and yield?

Absolutely. We quantify both standard-density and medium/high-density cementitious and mineral-fiber SFRM (Monokote, Isolatek). We calculate exact board footage (BF), standard yield per bag, overspray waste allowances (20-30% on metal deck), and pump/rig staging labor.

How do you handle firestopping (Division 07 84 00) for MEP through-penetrations?

We count and categorize every pipe, conduit, busway, and duct penetration through fire-rated gypsum partitions and concrete floor decks, pairing each with certified UL system details (Hilti, 3M, STI) for intumescent sealants, firestop collars, composite sheets, and pillows.

Do your fireproofing takeoffs include steel surface prep, masking, and primer compatibility?

Yes. We evaluate structural notes for primer compatibility (alkyd vs. epoxy vs. bare steel) and quantify poly sheeting masking, overspray containment, scaffolding access, and daily cleanup labor.

What is your typical turnaround for a commercial fireproofing takeoff?

Standard commercial fireproofing packages are delivered in 24 to 48 hours. Large-scale high-rise buildings or industrial manufacturing facilities are completed in 3 to 4 business days.

Complete Guide to Fireproofing Estimating Services & SFRM Takeoffs

What are Fireproofing Estimating Services & SFRM Takeoffs? (Definition & Scope)

Fireproofing Estimating Services & SFRM Takeoffs provide professional preconstruction quantification and cost modeling from architectural and engineering blueprints. Expert estimators calculate precise material piece-counts, labor man-hours indexed to local ZIP-code wage rates, equipment requirements, and general conditions to produce competitive, margin-protected tenders for contractors and developers.

Pros & Cons of Outsourcing

  • Pros: Reduces overhead cost and timeline for bid preparation.
  • Pros: Access to expert estimators and advanced software tools.
  • Cons: Requires clear communication of project-specific variables.

Standard Process & Timeline

  • Review: Analyzing plans and specifications (1-2 days).
  • Takeoff: Measuring quantities using Planswift or Bluebeam.
  • Pricing: Applying RSMeans and local labor rates.

Pre-Bid Checklist

  • Verify all architectural and engineering addendums.
  • Check local prevailing wage requirements .
  • Confirm materials lead times and current supply chain pricing.
  • Review general conditions and project schedule timeline.

In our experience, utilizing industry-standard tools and a rigorous checklist reduces estimating variance by over 15%, ensuring a competitive and profitable bid.

Fireproofing Estimating Estimating Standards & Methodologies

To ensure absolute accuracy, our estimating desk cross-references all Fireproofing Estimating project blueprints with industry-standard benchmarks, specialized material databases, and localized labor indexes. A winning bid requires meticulous attention to these specific structural and operational variables:

  • PlanSwift
  • Bluebeam Revu
  • RSMeans
  • Accubid
  • OST
  • Procore
  • Trimble
  • Revit
  • AutoCAD
  • FasTrak
  • McCormick
Information Gain Note: Bidding in the Fireproofing Estimating sector is extremely competitive. We utilize advanced digital takeoff platforms (including PlanSwift, Bluebeam Revu, RSMeans, Accubid, OST, Procore, Trimble, Revit, AutoCAD, FasTrak, McCormick) to quantify precise measurements, completely insulating your firm against bid-day scope gaps and costly material miscalculations.
15-Min Response

Get an Instant Quote

Send your plans for a guaranteed flat-rate proposal.

Direct Estimator Support

Call Anytime
+1 (317) 751-5969
Turnaround Time
24-48 Hours Guaranteed

Large Blueprint Sets?

Upload multi-gigabyte project zip files via our 256-bit encrypted portal.

Enter Bid Room
Chat with us