F&K Estimatings Construction Estimating & Takeoffs

CSI DIVISIONS 31, 32 & 33 SITEWORK

Sitework Estimating Services and Earthwork Takeoffs

Commercial and civil sitework estimating services across the USA. We measure agreed earthwork, storm/sanitary pipe runs, paving areas and erosion-control quantities from the supplied civil documents. Engineering and environmental compliance certification are outside the takeoff scope.

Single-trade material takeoff
$150–$1,000 typical
Typical delivery
Typically 24–48 hours after approval
Deliverables
Excel + marked-up PDFs

We confirm the fee and delivery date in writing after reviewing your drawings. See scope-specific fees and timing.

Last reviewed · Prepared with

Your next contractor bid

Request a sitework estimating quote

Send existing and proposed grades, civil plans and geotechnical information if available. Identify where cut, fill, borrow or haul quantities are needed and share any specified disposal assumptions. We confirm the deliverables, fee and delivery date in writing after document review.

Useful documents for this scope

  • Civil grading and utility plans
  • Geotechnical report with boring logs
  • Existing survey or topography

Check cut, fill and haul assumptions

Keep bank excavation, compacted fill and loose haul quantities on their stated bases. If unsuitable material is identified, separate its removal and replacement and confirm the disposal or import assumptions before using a haul rate. Inspect the sample deliverable formats and tell us which outputs you need.

Remote support across the United States. View service areas.

Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.

Inspect the deliverable

Inspect the source quantities before requesting your quote

Sitework quantities come from the civil set. Browse the published samples to see selected quantity rows with their original units and the drawing excerpts behind them. They illustrate format only: excerpts, not a complete priced bid or proof of a client outcome.

Concrete plan excerpt from the published estimating sample library

Concrete & site quantities

Concrete, reinforcement, formwork and site-improvement quantities with separate source units.

48 selected line items · drawing and workbook references where available

Inspect quantities and source excerpts →

Scope and deliverables

Grading Inputs & Civil Sitework Takeoffs

Earthwork estimating carries some of the highest financial risks in construction. An inaccurate cut/fill calculation can result in hundreds of thousands of dollars in unexpected off-site dirt export fees or imported select fill hauling costs.

At F&K Estimatings, sitework scope is reviewed against existing and proposed grading information, stripping depths, subgrade requirements, utility profiles and paving sections. The written scope identifies the available inputs, measurement method, volume basis and geotechnical assumptions.

We provide complete line-item takeoffs for earthwork, underground utilities (storm, sanitary, water), paving, curbs, and erosion control with assumptions and exclusions for contractor review.

Scope, price, and delivery are confirmed after reviewing the project documents and requested deliverables.

Civil sitework drawing context

Deliverables for your agreed scope

Earthwork and grading takeoff

Cut and fill from the agreed grading inputs, topsoil stripping and building-pad preparation, with haul-off and import shown separately.

Paving and hardscape schedule

Asphalt, aggregate base, curbs, gutters and sidewalks measured from the civil plans, with parking-lot areas split by section.

Utility takeoff by system

Storm, sanitary, water and fire lines itemized with pipe materials, structures and depths from the utility plans.

Erosion-control and clearing quantities

Silt fence, stabilized entrances, inlet protection and clearing acreage measured from the erosion-control and demolition plans.

Who this service supports

  • Sitework & Earthwork Contractors
  • Site Utility Contractors
  • Paving Subcontractors
  • General Contractors
  • Land Developers

Sitework and Earthwork: quantities, checks and quote requirements

Sitework takeoffs calculate cut and fill volumes from existing and proposed grades, measure utilities by size and depth, and quantify paving, curbs and erosion control.

Measurement and reporting basis

  • Cut and fill volumes (CY)
  • Storm, sanitary and water utilities (LF)
  • Structures such as manholes and inlets (EA)
  • Paving, base course and curbs
  • Erosion and sediment control

Documents to include

  • Civil grading and utility plans
  • Geotechnical report with boring logs
  • Existing survey or topography

Also identify the current revision, addenda, project ZIP code, requested trades and bid deadline.

A scope check before pricing

Keep excavation, compacted fill and hauled material volume bases distinct. Separate trench bedding, pipe LF, structures EA, paving SF and mobilization; identify haul distances and soil assumptions.

Scope limits: Surveying, geotechnical investigation and unshown underground conditions cannot be verified by a drawing takeoff.

Worked estimating example

Name the volume basis before using a haul rate

A 100-foot trench, 2 feet wide and 3 feet deep, has 22.22 CY of geometric excavation before overbreak or material movement assumptions.

What the estimate should record
Separate bank excavation, compacted backfill and loose hauled volume. Record bedding, unsuitable material and haul assumptions rather than reusing one CY total for every operation.
Resolve before pricing
What geotechnical information, trench details and disposal or haul instructions are available?

Sitework takeoff services for excavation and civil utility contractors

Civil quantity takeoff services depend on the surfaces, utility details and boundaries available in the site drawings. Request separate earthwork, paving and utility quantities rather than one unexplained site allowance. For grading takeoff services, identify the existing and proposed surfaces, stripping limits and the agreed treatment of shrink, swell and export quantities.

Earthwork takeoff services

Requested output: Cut, fill and agreed stripping or trench quantities from supplied data.

Confirm in your quote: Survey basis, existing/proposed surfaces, shrink/swell assumptions and export ownership.

Underground utility takeoff

Requested output: Pipe lengths by size and system, structures and shown fittings.

Confirm in your quote: Depths, bedding, trench restoration, service connections and testing.

Paving and site concrete

Requested output: Surface areas, layer volumes, curbs and other shown site improvements.

Confirm in your quote: Thicknesses, limits of work, compaction assumptions and access phasing.

Identify the survey and geotechnical inputs used. Undocumented ground conditions, unsuitable material and dewatering should be clarified or carried as explicit allowances, not hidden within measured quantities.

Request this estimating scope

US project coverage for sitework and earthwork

For US projects, include the ZIP code and the location-sensitive inputs below.

  • Supply the project survey, geotechnical information where available and proposed disposal or borrow locations.
  • Identify haul distance, disposal fees, utility constraints and local crew or equipment rates separately from measured excavation and fill volumes.

The proposal records the pricing date, cost sources and unconfirmed allowances. Explore US service area information or send your project details for a scope quote.

Use the document checklist above to request quantities only, a priced estimate or a review of an existing bid.

Request a sitework and earthwork scope quote

Scope coverage for your bid package

CSI Division 31 - Earthwork & Grading

Cut/fill quantities from agreed grading inputs, topsoil stripping, building pad prep, soil stabilization, and compaction.

CSI Division 32 - Exterior Paving & Hardscape

Asphalt pavement, aggregate base stone, concrete curbs/gutters, sidewalks, and parking lot striping.

CSI Division 33 - Storm & Sanitary Utilities

Storm drainage RCP/HDPE, sanitary sewer SDR-35, manholes, catch basins, and headwalls.

Site Water Distribution & Fire Lines

Ductile iron / C900 water mains, fire hydrants, backflow vaults, service taps, and gate valves.

Erosion-Control Quantities

Silt fencing, stabilized construction entrances, rock check dams, inlet filters, and hydroseeding.

Site Clearing & Demolition

Acreage tree clearing, root grubbing, existing asphalt sawcutting, concrete pavement demolition, and hauling.

Sitework estimating services for contractor bids

Sitework estimating services help civil and excavation contractors separate earthwork, paving and underground utility quantities before pricing a site package. An earthwork takeoff should identify the volume basis and the limits of measurement.

Define your bid package

  • Keep topsoil stripping, unsuitable material, excavation, reuse, import and export as distinct items. State whether each volume is bank, loose or compacted.
  • Measure utility pipe by size, material and run; distinguish structures, trench excavation, bedding and restoration to avoid missing installation scope.
  • Separate pavement areas from base thicknesses, curb lengths and erosion-control quantities. Identify phased work and demolition limits.

Documents to send for a scope quote

Send existing and proposed grading plans, utility plans and profiles, site details, pavement sections, geotechnical information and addenda. Include agreed stripping depths and haul assumptions.

Shrink and swell factors must come from the stated project basis rather than a universal percentage. Quantity support does not include civil design, survey certification or an engineered grading model unless separately agreed.

Related estimating scope

Sample CSI Division 31 & 33 Quantification Schedule

Net cut/fill quantities, utility pipe footages, asphalt paving areas, and SWPPP controls:

Commercial Civil Sitework & Utility Schedule

Worked estimating example. Quantities show the stated scope and format; this is not a client project or a project-specific price quote.

CSI Scope Description Quantity Unit Soil / Waste Factor Civil Estimator Note
Division 31 23 00 - Mass Earthwork (Net Cut to Fill Balance) 48,500 CY 15% Swell Factor Calculated via 3D civil contour modeling; includes 6-inch topsoil strip
Division 33 41 00 - 24in. Reinforced Concrete Pipe (RCP Storm Drain) 1,850 LF 5% Includes trench excavation, #57 stone bedding, and backfill compaction
Division 32 12 16 - Heavy-Duty Asphalt Paving (3in. Surface + 8in. Crushed Base) 14,200 SY 5% Prime coat and tack coat included per DOT commercial specs
Division 31 25 00 - Wire-Backed Silt Fence (SWPPP Erosion Control) 4,600 LF 8% Positioned along site perimeter and downhill drainage boundaries

State requirements that affect this scope

  • New York — excavation support and street restoration on dense New York City sites.

How your estimate is prepared

We start from the civil plans, the grading inputs and the bid date. We measure earthwork, paving, utilities and erosion control from the civil set, check the utility depths against the profiles, and record the assumptions where the survey is incomplete. The sitework method, from grading inputs to utility schedule, sets out the software, review steps and version control behind each takeoff.

Estimating fees and delivery

Sitework fees depend on the site area and the utility scope — a small pad with one utility tie-in costs less to estimate than a multi-acre site with deep storm and sanitary runs, retaining structures and phased grading. Fee and timing for the agreed sitework scope are set out in the written proposal before work starts.

Scope / project typeTypical deliveryTypical fee
Single-trade material takeoffTypically 24–48 hours after approval$150–$1,000 typical
Residential construction estimateTypically 2–4 business days after approval$400–$1,000 typical
Commercial preconstruction packageTypically 3–5 business days after approval$150–$1,000 typical
Industrial & heavy civil takeoffTypically 4–7 business days after approval$1,000–$5,000+ typical
Ongoing estimating supportPriority queue agreed in writing$1,800/mo typical

Sitework fees cover the takeoff work above. Site area, utility scope and deadline are what the written proposal reflects.

Frequently asked questions

What information is needed for cut and fill quantities?

Provide existing and proposed grading information, boundaries, sections and the geotechnical report. Confirm the required measurement method before acceptance. Report bank, loose and compacted volumes separately; shrink, swell, unsuitable material and haul assumptions must be identified rather than inferred.

Can you estimate site utility pipe runs and underground structures?

Absolutely. We quantify all storm drainage, sanitary sewer, and domestic water distribution piping, along with precast manholes, catch basins, curb inlets, gate valves, and utility trench excavation/bedding volumes.

How do you handle site clearing, grubbing, and asphalt demolition?

Our sitework estimators calculate measured acreage for heavy tree clearing and grubbing, stripped topsoil volumes, and provide detailed square yardage and tonnage for existing asphalt, concrete curbs, and building demolition.

Do your sitework takeoffs include SWPPP erosion control?

Yes. We quantify silt fencing, construction exits, inlet protection bags, sediment basins, temporary hydroseeding, and straw wattles shown in the supplied erosion-control documents; this is measurement support, not a SWPPP design or compliance certification.

What is your typical turnaround for a sitework estimate?

Delivery depends on the drawing set, requested trade scope, pricing requirements and bid deadline. The delivery date, scope and revision coverage are confirmed in the written quote after document review.