F&K Estimatings Construction Estimating & Takeoffs

Block · Screen walls · Tilt panels excluded

Phoenix masonry is the block, the veneer, and the screen wall, not the tilt panel next to them

Valley industrial work mixes tilt-up concrete with masonry screen walls and veneer bands. Planning & Development reviews both under the 2024 building volume in force since 1 August 2025, but they are not one quantity. The tilt panel is concrete. The masonry is the block, brick, or stone the elevations hatch. Heat changes how long mortar stays workable. That is the crew’s day, not an extra unit on the takeoff.

Structural block is units plus grout and bar from the notes. Screen walls at equipment yards are often a different bond and a different height than the building veneer. Count them from their own elevation. Weeps and flashings follow the spacing the detail prints. A detail with no spacing is a gap. Lintels and cast stone sills are pieces. Scaffold is access and stays out unless the mason’s bid owns it.

Brickmasons and Blockmasons, Phoenix-Mesa-Chandler, May 2025 file OEUM003806000000047202103, hourly mean $29.90. The title does not split screen-wall labor from veneer labor. The mean is not a price per block.

Send wall sections and the elevations that show the masonry, not only the tilt panels.

Flashing at each shelf is a linear foot per floor the detail repeats. One building-length number undercounts a multi-story veneer. Weep counts follow the printed spacing. Cavity backup and veneer are separate extensions. A veneer on studs is not a structural pier. Sample panels are counts only when the spec requires a panel. Cleaning of new masonry is an area if that section exists. Joint reinforcement is a linear foot per course when spacing is given. Grout for solid piers can be a volume from the pier schedule when you want material as well as units. Cast sills are pieces from the elevation.

Control joints in long screen walls are lengths from the elevation. If the elevation omits them and the spec says provide joints, the spacing gap is written down rather than filled at an assumed interval. Precast caps on a screen wall are pieces. Embedded bolts for gates are counts when the gate detail shows them and the mason sets them. Gate leaves themselves are a different trade unless the invitation says the mason furnishes the gate. Mortar proportions stay in the spec. They do not change the block count. Hot-weather retarder is a crew means item, not a material extension, unless you ask for that admixture as its own line.

Masonry units before Valley screen walls

Phoenix masonry versus tilt-up

Are tilt-up panels in the masonry total?

No. Panels are concrete. Masonry is what the elevations show as block, brick, stone, or screen wall.

Do hot days add units?

No. Temperature affects production. The unit count is the wall that is drawn.

Is $29.90 a block price?

No. File OEUM003806000000047202103 publishes $29.90 for brickmasons and blockmasons. That is not a unit price for block.

Phoenix masonry references

Send Phoenix masonry elevations

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.