F&K Estimatings Construction Estimating & Takeoffs

Campus front end · Cooling equipment · Summer calendar

Phoenix campus work is priced from the district front end and the cooling equipment, not from a downtown template

School and care buildings inside Phoenix still go through Planning & Development when the city is the building official, on the book effective 1 August 2025. District front ends add their own general-requirements and product rules. A state-funded campus can add another reviewer. The invitation names the path. Do not assume a private clinic and a public elementary school share a wage basis. Arizona has no state prevailing-wage statute on the January 2023 chart. Federal assistance is a separate question printed in that solicitation.

The quantity that surprises bidders from cooler states is the cooling plant and the insulation around it, already drawn, plus any phasing that keeps classrooms in session. Year-round calendars and summer shut-downs are read from the invitation. A summer shut-down does not by itself create temporary classrooms. Evaporative equipment, where an older campus still shows it, is not automatically replaced with refrigerated tons. Price the scheduled machines.

Cost Estimators in the Phoenix-Mesa-Chandler wage area are at $40.52 hourly mean in May 2025 file OEUM003806000000013105103. That does not price a classroom wing. Shade structures over play yards are counted only when the site plan draws them, and they are not part of the cooling-yard equipment. Temporary barriers are areas when the phasing sheets draw them. Owner-furnished kitchen gear is an exclusion when the sheets say so. Send the front end with the drawings. There is no desk on the campus.

Rooms that stay in use during a renovation are not inside the removal area. Temporary egress and temporary alarms are counts when the phasing plan draws them. Lab casework and hoods need their own sheets. Owner-furnished food-service equipment is an exclusion citing the sheet. Commissioning hours are carried only when the front end states the hours. Testing agencies remain with the owner unless the bid form moves them. Abatement is a licensed price with a survey. The age of a campus building is not that survey. A summer calendar is read from the invitation and does not create temporary classrooms by itself.

Common corridors, toilets, and the cooling yard are measured once, not once per classroom. Unit types, where the architect repeated a plan, are measured once and extended by the count on the unit schedule. Amenity decks and their membranes are separate from the classroom wing. Temporary cooling for an occupied wing is included only when the phasing sheet shows the temporary equipment. A note that says maintain comfortable temperatures, with no machine, is a gap. The original assumption log is what a later change is priced against.

Campus estimating before the Valley cooling schedules

Phoenix campus assumptions that fail

Do Phoenix school bids carry state prevailing wage?

Not from a state statute on the January 2023 chart. Coverage exists only if this solicitation, often federal, attaches a determination.

Do you replace evaporative cooling with refrigerated tons?

No. The equipment schedule is priced. An undrawn replacement is an exclusion or an alternate you asked for.

Will you walk the campus?

No. Measurement is from the documents. You may forward notes from a walk you attended.

Phoenix campus-estimate references

Send the Phoenix campus set and front end

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.