Two plumbing books · 2023 electrical code · Valley equipment
A Phoenix systems takeoff has to record which of the two plumbing books the set used
Phoenix Planning & Development’s current building book, Ordinance G-7397 since 1 August 2025, is awkward for a combined systems bid because plumbing was adopted twice: the 2024 international plumbing model and the 2024 uniform plumbing model, both with amendments. Electrical work in that same ordinance is the 2023 national electrical code. Mechanical work is the 2024 mechanical model. The cover sheet has to pick the plumbing volume. A spec from one book and risers from the other is a conflict, not a blended pipe total.
Keep the three trades in three blocks even though one workbook holds them. Condensate from a rooftop unit is plumbing only if the plumber’s invitation includes it. The curb and the rail are mechanical or structural as the detail assigns them. The disconnect and the feeder are electrical. Cooling tons are the scheduled equipment. The desert afternoon is why the schedule is large. It is not an extra ton written in the margin. Solar-ready or photovoltaic conduit, if the electrical site plan draws it, is a conduit run. It is not assumed on every warehouse.
Do not average these three May 2025 hourly means for Phoenix-Mesa-Chandler. Electricians $30.95, file OEUM003806000000047211103. Plumbers, Pipefitters, and Steamfitters $33.95, file OEUM003806000000047215203. Heating, Air Conditioning, and Refrigeration Mechanics and Installers $29.91, file OEUM003806000000049902103. Duct fabrication is still another occupation. None of the three is a bid number. Private Valley work does not pick up a public wage. The state chart shows no Arizona prevailing-wage law.
Fire alarm, if you want it, has to be named. Otherwise devices stay out. Low-voltage trays are lengths only where the plans draw trays. Send the three disciplines and say whether alarm and fire sprinkler are in or out.
Kitchen hood exhaust is duct from the hood drawings, not from the seating count. Generator and transfer equipment are counts only when the electrical site plan is included. Panel schedules set feeder sizes. A one-line that ends at the service leaves the rest of the feeders off. Lighting is a fixture count from the lighting plan. Watts per square foot is not a fixture list. Domestic heaters stay in plumbing. Electric heat inside an air handler is an accessory on that unit, not a second machine. Alarm devices stay out until the alarm specification is named in the request.
Duct insulation weight is not added into the sheet-metal pounds. It is an area beside them. VAV and fan-coil counts come from the schedule. Balancing valves are counts where the piping diagram shows them. Condensate receivers are included in plumbing only when that trade’s invitation says so. Roof screens around equipment are steel or miscellaneous metal until a note gives them to the mechanical contractor. Photovoltaic conduit on a canopy is a run only if the electrical plan draws the route. An empty note about future solar is an exclusion.
Combined systems method before this city’s paired plumbing books
Phoenix systems questions the double plumbing adoption creates
Which plumbing code should the pipe be extended under?
The one named on the Phoenix set. The city adopted both the 2024 international and the 2024 uniform plumbing models. Guessing is a conflict note, not a conversion.
Can one labor rate cover electricians and pipe trades?
No. The May 2025 metro file publishes different hourly means. Use them only as separate references.
Do you add photovoltaic conduit on every new Phoenix roof?
No. Count conduit that is drawn. An undrawn solar path is an exclusion.