Phoenix earthwork volumes come from the grading table, and caliche only from the borings
Earthwork on a Phoenix site is not a percentage of the building the Planning & Development reviewers see. Cut and fill are the cubic yards in the civil grading table. Contours are not converted by eye. Retention basins, common because drainage is detained on site, are the volumes the civil design states. They are excluded when the building bid does not include the civil set. The August 2025 building book does not replace that table.
Caliche and cemented layers show up in many basin borings and in many that do not. Ripping, over-excavation, and select fill are extended only when this report calls for them. A missing report is a gap, not a citywide rock allowance. Pavement sections are areas by type. Curbs are lengths by profile. Trenches get excavation volume only when the profile gives width and depth. Dust control and construction water are separate lines if you want them carried. They are not hidden inside the yard price.
Operating Engineers and Other Construction Equipment Operators, Phoenix-Mesa-Chandler, May 2025 file OEUM003806000000047207303, hourly mean $30.46. Laborers are a different occupation. The operator mean is not a price per yard. No state prevailing-wage law appears on the January 2023 Arizona line of the federal chart.
Send the grading plan, the borings, and the pavement sections. The pad is not walked.
Manholes, inlets, and area drains are counts. Silt fence and inlet protection are lengths and counts from the erosion sheet. An undrawn control device is not added because the site is dusty. Retaining walls are face area plus footing volume when the site structural sheets dimension them. Walls noted as by others stay out. Fire-lane striping is a length only when the sheet draws it and this bid owns paint. Stabilized entrances are counts. Utility concrete encasement is a volume only when the detail shows the encasement section. Otherwise the pipe is a length and the encasement is a gap.
Subgrade preparation under a building pad is an area when the soils report specifies moisture conditioning or recompaction. The depth of that conditioning comes from the report. Without a depth the area is named and the thickness is a gap. Import of aggregate base is a volume from the pavement section times the area. A section that says base as required is a gap. Concrete valley gutters are lengths by width. Truncated domes at curb ramps are counts of ramp locations. Survey staking is not a quantity in this takeoff. It stays with the contractor’s general requirements unless you move it.
Earthwork volumes before Valley caliche notes
Phoenix earthwork that the borings have to earn
Is caliche included on every Phoenix site?
No. Cemented material is quantified when the borings describe it. Without a report the rock is a gap.
Are retention basins in the building estimate?
Only when the civil package is part of the invitation. Otherwise they stay out.
Is the operator wage a yard price?
No. File OEUM003806000000047207303 is an hourly mean for equipment operators.