Measured sheet · No prices · Phoenix or neighbor
A Phoenix measured sheet records quantities and leaves the Valley prices off
This product is a workbook of counts, lengths, areas, and volumes with the sheet number beside each line, plus a marked PDF. Prices are a different engagement. If the parcel is inside Phoenix, the context note says Planning & Development and the book in force since 1 August 2025. That note is how a reviewer sees why a plumbing spec with no named volume was flagged. It does not scale any quantity. If the parcel is in another Valley city, the note names that city instead of borrowing Phoenix.
Tell us the units before the files are opened. Yards of concrete, squares of roof by system, and fixture counts should not be rebuilt later into a private code of accounts unless you attached the map. Missing schedules are gaps. They are not filled with a typical Valley allowance. Retention, paving, and off-site pipe stay out unless those civil sheets are in the invitation.
There is no separate wage-file occupation for people who only measure. The closest published line is Cost Estimators, $40.52 hourly mean, May 2025 file OEUM003806000000013105103, Phoenix-Mesa-Chandler. The fee for the workbook is quoted from the sheet count. The wage figure is not that fee.
No pad is walked and the city portal stays closed. Name the disciplines in the upload note.
Bar schedules in the Valley sets are extended mark by mark. Laps are included only when the general note prints the lap length. Depressed slabs at restroom groups are separate volumes so a single thickness does not swallow them. Roofing stays in system groups on the unpriced sheet so a later price has somewhere honest to land. Opening leaves are not merged with their frames. Retention-basin volumes are copied from the civil table when that table is part of the upload, and they are absent when it is not. A bubbled change is compared with the prior PDF only when you actually attach the prior PDF.
Footing concrete and the contact area of the forms can both appear, because a yard of mud is not a square foot of form. Finish areas can show the opening deduction beside the gross wall so you choose which one to price. Two consultants who reused a sheet number are logged as a clash. Insulation taper is a board-foot figure only after the diagram prints inches. A cover note records which PDF name was measured.
Measured-quantity output without a Phoenix price
Phoenix measurement limits
Will the workbook include labor rates?
No. You get quantities and gaps. Labor pricing is quoted separately and needs your rates.
Do you invent a drainage allowance because Phoenix uses retention basins?
No. Basins and pipes are measured from the civil sheets when those sheets are in the bid. Otherwise they are excluded.
Does the estimator wage change the fee?
No. It is a metro statistic. The fee follows how many sheets and trades you include.