F&K Estimatings Construction Estimating & Takeoffs

Member plans · Joists · Embeds at tilt panels

Phoenix steel lists are the beams, the joists, and the embeds, not a tonnage guessed from warehouse area

Phoenix industrial buildings often look like tilt-up boxes with a modest steel package: joists, beams at openings, embeds in the panels, and a canopy. Planning & Development reviews the 2024 building volume effective 1 August 2025. The steel quantity is still the member list, not a pounds-per-square-foot factor that pretends the panels are steel. Conventional frames, when that is the system, are listed shape by shape. The two systems are not averaged.

Joists and deck are separate from the beam tonnage. Embed plates and anchor rods are counts from the panel schedule and are the items most often missing when someone prices “the steel” as one tonnage. Canopies and screen-wall steel are their own groups. Stairs and rails are miscellaneous metals if those sheets are in the request. Connections that are deferred are flagged. The main members that are drawn can still be listed. Primer and galvanizing follow the spec by member group, not as a coat on every ton because the yard is hot.

Structural Iron and Steel Workers in the Phoenix-Mesa-Chandler wage area, May 2025 file OEUM003806000000047222103, hourly mean $30.21. Shop fabrication and field erection are often different contracts. The hourly mean is neither a fabricated ton price nor an erected ton price.

Send the framing plans and, on tilt-up jobs, the embed schedule. Nothing is field-measured.

Deck is an area by profile, not a percent of beam tonnage. Joist marks and lengths come from the joist plan. Shear studs are counts from the spacing note. A note without spacing is a gap. Base plates are listed from the schedule so they are not lost inside the beam weight. Canopy framing is its own group. Screen-wall steel at equipment is its own group. Stairs, rails, and ladders stay in miscellaneous metals when those sheets exist. Field touch-up is an area only if the spec defines the touch-up. A galvanize note that applies to exterior steel is not extended to interior beams.

Moment connections that are fully shown are counted as connection types. A typical detail that covers a mark is applied to every beam of that mark. A typical detail that says similar is not applied to marks the detail never names. Sag rods and bridging are lengths or counts from the joist note. Deck support angles at openings are lengths around each opening the framing plan dimensions. Pour stops are lengths. Bent plate is listed by mark. A miscellaneous metals allowance is not substituted for a stair that has no drawing. The stair is a gap until the sheet exists.

Steel lists before Valley tilt-up embeds

Phoenix steel that a warehouse factor misses

Are tilt-up panels part of the steel tonnage?

No. Panels are concrete. Steel is the framed members, joists, deck, and the embeds the panel schedule lists.

Do you guess deferred connections?

No. Drawn members are listed. Undesigned connections are gaps.

Is $30.21 per ton?

No. Structural iron and steel workers are published at $30.21 on file OEUM003806000000047222103. A ton price is a different calculation.

Phoenix steel references

Send Phoenix framing plans and embed schedules

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.