Pennsylvania Department of Labor and Industry
Pennsylvania Construction Estimates for Earthwork and Masonry Repair
F&K estimates Pennsylvania work from the drawings you send. There is no Pennsylvania office, no site walk, and no permit filing.
Pennsylvania’s Uniform Construction Code moved to the 2021 I-Codes, with state exclusions and modifications, effective 1 January 2026, for both the building and residential volumes. Philadelphia administers its own amended version. A suburban code official and the Philadelphia reviewer are not applying identical pages. Older permits remain on the prior UCC until their vesting rules say otherwise.
Zones 4 through 6, freeze-thaw, lake-effect snow near Erie, and carbonate geology in parts of the center and southeast are the regional facts. Karst changes foundations when the geotech describes it. Moderate frost is the usual footing constraint outside the colder northern tier.
The DOL table of January 1, 2023 lists a $25,000 prevailing-wage threshold. Rates are determined for the project. There is no statewide general-contractor license asserted on this page. F&K reads the drawings remotely.
Procurement and labor notes for Pennsylvania
Pennsylvania public-work estimating should identify public funding, project value, county, construction type, and labor classifications. The applicable wage determination belongs in the solicitation and contract for covered work.
Pennsylvania's Procurement Handbook covers materials, services, and construction under the Procurement Code. Use the current agency solicitation, plans, specifications, forms, and addenda.
Pennsylvania applies prevailing-wage classifications to qualifying public-funded building and heavy-highway work over $25,000. Confirm the current county and trade determination before finalizing labor assumptions.
Estimating services and trade scopes
Choose a measured takeoff if you plan to apply your own rates. For a priced bid estimate, agree on the trade boundaries, labor basis, supplier quotes and allowances with your estimator.
Sitework estimating
For a Pennsylvania site where the geotechnical report identifies carbonate rock or voids, measure excavation to the drawing limits. List the bid’s rock or remediation allowances separately so price revisions are traceable.
Masonry estimating
For a Pennsylvania facade rehabilitation, mark repair areas on the elevations and separate replacement masonry, repointing and anchorage. Carry access and protection by phase when the tender includes those responsibilities.
What to send and what to request
- Bid drawings and inputs
- Masonry survey and elevations, civil plans, geotechnical report, contractor phasing and access notes.
- Estimate deliverable
- Repair quantities by elevation and work type, cut/fill or rock allowances and access notes.
Browse estimating services and trades
Find the drawings, quantities and deliverables for your scope. For a Pennsylvania project, share your bid documents so we can confirm which items belong in the quote.
Estimating services
- Construction Estimating
- Cost Estimating
- Quantity Takeoff
- Dedicated Estimator
- Commercial Estimating
- Residential Estimating
- Industrial Estimating
- Multi-Family Estimating
- Bid Consultation
- Project Management
- Quantity Surveyor
- Bid Management
- Material Procurement
- Plan Review
- Subcontractor Takeoff
- Institutional Estimating
- Value Engineering
Trade estimating and takeoffs
- Concrete Estimating
- Masonry Estimating
- Structural Steel
- Lumber Takeoffs
- Drywall Estimating
- Painting Estimating
- Flooring Estimating
- Roofing Estimating
- Insulation Estimating
- Doors & Windows Estimating
- Millwork Estimating
- MEP Estimating
- Electrical Estimating
- Plumbing Estimating
- HVAC Estimating
- Sitework Estimating
- Demolition Estimating
- Landscaping Estimating
- Fireproofing Estimating
- Waterproofing Estimating
- Metals Estimating
- Thermal & Moisture Protection
Pennsylvania questions before a number is issued
Does the Pennsylvania UCC apply inside Philadelphia without amendments?
Philadelphia administers its own amended code. Do not assume a township UCC page is the city page.
What size contract triggers Pennsylvania prevailing wage?
The January 2023 DOL chart lists $25,000. The rate sheet is separate and project-specific.
Official references for Pennsylvania
- Pennsylvania Department of Labor and Industry
- DOL state prevailing-wage thresholds (January 1, 2023)
- Pennsylvania Prevailing Wage
- Pennsylvania Procurement Handbook
Compare a marked-up quantity sheet in the sample library before sending a set.