F&K Estimatings Construction Estimating & Takeoffs

Unpriced · Sheet numbers · City context note

Philadelphia quantities are delivered without prices, and the city amendment is only a context note

The workbook has no dollars unless a later quote adds them. Each line carries a sheet number. For a parcel Licenses and Inspections will review, the cover note says the city applies its own amendments to the statewide 2021-based code that took effect at the start of 2026. That sentence explains why a detail copied from an unamended suburban set was flagged. It does not multiply any quantity. A different Pennsylvania township gets a different note.

You choose the units. Block, brick repair area, and pipe lengths stay in the units you asked for. Party-wall repairs are areas inside the hatches only. Stacked housing plans are measured per distinct plan and extended by the count on the unit matrix if you include that housing scope. Missing matrices are gaps.

Cost Estimators are the nearest published occupation, $41.97 hourly mean, 2025 file OEUM003798000000013105103, for the Philadelphia-Camden-Wilmington area. People who only measure are not broken out. The fee follows how many sheets you include. The wage is not the fee. No one pulls a tape in an alley.

Civil beyond the building face stays out until those sheets are part of the request. Sidewalk vaults are included only when the structural plan shows the vault in your scope.

Send the disciplines and say which PDF is current.

Repair brick is an area of hatch, not a wall area of the whole facade. New block infill is units. Those two are not added into one masonry figure. Pipe lengths stay by system. Fixture counts come from the schedule, and a schedule that says similar to unit A is applied only to the units the matrix actually marks. Stair counts are pieces from the sections. A reflected ceiling plan that shows only part of a floor is measured for that part. The rest is a gap, not a mirrored copy. The workbook cover names the PDF.

Bay windows and rear additions are their own areas when the plan shows them. They are not multiplied with the main room. Cellar slabs and the areaway stair are concrete of their own, not part of the first-floor finish. A reflected ceiling that covers only the front rooms is measured for those rooms. The ell ceiling is a gap until a plan shows it. Fixture schedules that say “typical” are applied only to the units the matrix marks as typical. End houses in a row are checked before any multiplier.

Unpriced quantities before the Philadelphia amendment note

Philadelphia quantities that stay unpriced

Are labor rates on the sheet?

No. The sheet is quantities and gaps. Rates are a separate quote.

Do you treat every Pennsylvania set as a Philadelphia L&I set?

No. The city amendments apply in the city. A township set is labeled as a township set.

Why mention the estimator wage at all?

Because the wage file has no separate occupation for measurement-only work. The $41.97 figure is that nearest line, and it is not the fee.

Philadelphia quantity references

Send the Philadelphia PDFs to count

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.