F&K Estimatings Construction Estimating & Takeoffs

Rated separations · Ordinary partitions · L&I

Philadelphia partitions follow the rated types between neighbors, not a single board on every stud

Stud-and-board walls in a Philadelphia filing are taken from the type marks. Licenses and Inspections applies the city amendments to the 2021-based code for applications opened in 2026. A wall between two dwellings is whatever tested build the schedule names: layer count, stud gauge, and the insulation that build includes. A closet partition is not that build. Skim versus a paint-ready surface is called out by room because the labor is not the same.

Track and studs are linear feet by height. Board is separated by type. Stair and shaft builds in a stacked house are listed on their own so they are not lost in a floor-area shortcut. Ceilings are not added into the wall total. Boxing of old beams and a chase around a soil stack are taken from the sections that draw them.

Drywall and Ceiling Tile Installers, Philadelphia-Camden-Wilmington, sit at $29.64 on 2025 file OEUM003798000000047208103. One published title covers both board hangers and ceiling-tile crews, which is why a ceiling package and a wall package should not share one production rate. The figure is not a sheet price. A covered public job uses the wage schedule in that contract.

Resilient channel on a party-wall furred face is a length when the type includes it. Insulation inside the studs stays with the insulation trade unless you assign it here.

Send the wall types and the reflected ceiling plan. No wall is opened.

Corner bead and control joints are lengths. Access panels are counts. A plaster patch at a removed stack is an area of patch, not a full new wall, when the demo plan limits the opening. Shaft liner at an existing stair that is being reused is measured only for the portion the wall types say is new. Deflection track under old joists is a length per the head detail. If the detail is missing, the head condition is a gap. Finish level on an existing plaster ceiling that is being skimmed belongs in the coating package unless the drywall spec takes the skim.

Bead at arched openings in an old plaster wall is a length along the arch, not a standard corner. A patch around a new stack is the area of the patch the removal plan outlines. Shaft board on a stair that is staying is limited to the bays the type mark calls new. Head track under irregular old joists is a length only when a detail gives the condition. Skim coat on a plaster ceiling stays in the coating scope unless the board spec explicitly takes that skim. Access panels in a chase are counts.

Partition quantities before city rated separations

Philadelphia partition types a single factor erases

Is every wall between units a one-hour assembly?

Only if the wall schedule says so. The fact of a neighbor is not an assembly mark.

Does the wage title separate ceilings from walls?

No. File OEUM003798000000047208103 uses one title for board and for ceiling tile. The quantities on the sheet still stay apart.

Which code are the assemblies checked against?

For a 2026 city filing, the amended books based on the 2021 models. An older vested permit keeps the edition named on its drawings.

Philadelphia partition references

Send Philadelphia wall types

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.