Massachusetts Construction Estimates for Public-Building Retrofits
F&K estimates Massachusetts work from the drawings you send. There is no Massachusetts office, no site walk, and no permit filing.
The Massachusetts State Building Code, 780 CMR, Tenth Edition, effective 11 October 2024, is based on the 2021 I-Codes and is enforced statewide. Many cities have also adopted the stretch energy code or the specialized opt-in code, so two towns can share 780 CMR and still differ on envelope and mechanical requirements. The construction supervisor license, issued through the Board of Building Regulations and Standards, covers specified residential construction; it is not a substitute for reading the trade licenses on a commercial job.
Zone 5 brings snow, freeze-thaw, and, on the shore and Cape Cod, hurricane and coastal-flood design. Moderate frost depth sets footing and wall quantities. Do not import a New Hampshire ground-snow value.
The DOL table of January 1, 2023 lists Massachusetts prevailing wage with no contract-size minimum. Schedules are issued for the project by the Department of Labor Standards. That is not a single Boston rate. F&K prices the documents remotely and has no Massachusetts office.
Procurement and labor notes for Massachusetts
Massachusetts public construction estimates should be checked against the project-specific bid package and the applicable Department of Labor Standards wage schedule. The project location, work classifications, and addenda can change the estimating basis.
Massachusetts public construction follows state public-bidding requirements, and awarding authorities provide project-specific bid information. Use the current solicitation, drawings, specifications, forms, and addenda as the controlling documents.
Massachusetts requires prevailing wage on covered public works, with schedules issued for the project and applicable classifications. Include the current schedule when it is part of the bid package; do not apply one statewide rate to every project.
Estimating services and trade scopes
Choose a measured takeoff if you plan to apply your own rates. For a priced bid estimate, agree on the trade boundaries, labor basis, supplier quotes and allowances with your estimator.
MEP estimating
For an occupied Massachusetts public-building retrofit, identify rooms and systems affected by each phase. Keep equipment replacement, temporary service, distribution changes and commissioning separated so they can be reconciled with the tender’s trade classifications.
Roofing takeoff
For a Massachusetts school reroof, mark work areas, roof transitions and equipment curbs on the bid set. Separate temporary protection and any scheduled deck repair from the measured replacement assembly before applying the project’s labor basis.
What to send and what to request
- Bid drawings and inputs
- MEP schedules, energy notes, roof sections, owner alternates and municipality or permitting basis.
- Estimate deliverable
- Equipment and controls schedule plus roof-layer takeoff and energy-alternate comparison.
Browse estimating services and trades
Find the drawings, quantities and deliverables for your scope. For a Massachusetts project, share your bid documents so we can confirm which items belong in the quote.
Estimating services
- Construction Estimating
- Cost Estimating
- Quantity Takeoff
- Dedicated Estimator
- Commercial Estimating
- Residential Estimating
- Industrial Estimating
- Multi-Family Estimating
- Bid Consultation
- Project Management
- Quantity Surveyor
- Bid Management
- Material Procurement
- Plan Review
- Subcontractor Takeoff
- Institutional Estimating
- Value Engineering
Trade estimating and takeoffs
- Concrete Estimating
- Masonry Estimating
- Structural Steel
- Lumber Takeoffs
- Drywall Estimating
- Painting Estimating
- Flooring Estimating
- Roofing Estimating
- Insulation Estimating
- Doors & Windows Estimating
- Millwork Estimating
- MEP Estimating
- Electrical Estimating
- Plumbing Estimating
- HVAC Estimating
- Sitework Estimating
- Demolition Estimating
- Landscaping Estimating
- Fireproofing Estimating
- Waterproofing Estimating
- Metals Estimating
- Thermal & Moisture Protection
Massachusetts questions before a number is issued
Does the stretch energy code apply in every Massachusetts town?
No. Base 780 CMR is statewide. Stretch and specialized opt-in energy codes are municipal adoptions. Ask which one the permit set used.
Is there a dollar threshold before Massachusetts prevailing wage applies?
The January 2023 DOL chart shows none. Covered public works use the project schedule from the Department of Labor Standards.
Official references for Massachusetts
- Massachusetts prevailing wage
- DOL state prevailing-wage thresholds (January 1, 2023)
- Massachusetts Prevailing Wage Program
- Massachusetts Public Construction
- Massachusetts Prevailing Wage for Workers
Compare a marked-up quantity sheet in the sample library before sending a set.