F&K estimates Minnesota work from the drawings you send. There is no Minnesota office, no site walk, and no permit filing.

The 2020 Minnesota State Building Code, effective 31 March 2020, is the statewide code, based on the International Codes with Minnesota amendments. It is not optional in the communities the statute covers. Frost-protection footing depth is itself zoned inside the state, deeper in the north than in the south, which is why a Minneapolis detail can be wrong for a project on the Iron Range.

Zones 6 and 7 and heavy snow are the energy and structural climate. A compressed exterior season changes winter protection and temporary heat when the schedule says the shell will be open in January. Those are assumptions to write down, not silent factors.

DOL’s January 1, 2023 chart lists $25,000 where more than one trade is involved and $2,500 where a single trade is involved. Highway and heavy work has its own DLI rate schedule. Rates are county-specific. F&K does not operate a Minnesota office; send the drawings and the county.

A construction takeoff for a Minnesota project starts with the drawing set and the county, not with a statewide rate. Concrete, rebar, formwork, framing, insulation, roofing, and MEP quantities are measured from the sheets and returned as a schedule with a sheet reference beside every line, so the bidder can apply their own crew rates and supplier prices. The county matters twice: it sets the frost zone for the footings and the wage schedule for covered public work. One statewide building code (Minnesota Statutes, section 326B.121) means the code edition does not change at a city line, but the footing depth and the labor basis still do. Send the full issue, the geotechnical report where foundations are in scope, and the project county, and the takeoff is scoped from those documents.

Minnesota writes its frost depths into the rules, county by county. Minnesota Rules, part 1303.1600, sets the minimum footing depth for frost protection at five feet in Zone I and three and one-half feet in Zone II, in the absence of a determination by an engineer competent in soil mechanics. Zone I covers 34 northern counties, including St. Louis, Beltrami, Itasca, Cass, and Crow Wing; Zone II covers the other 53, including Hennepin, Ramsey, Olmsted, and Stearns. The eighteen-inch gap between the zones is excavation, wall height, backfill, and concrete on every footing, so a takeoff that prices a Duluth footing at a Minneapolis depth is wrong before the first yard is poured. The zone comes from the project county and the structural detail, never from a statewide default.

Winter work is a set of measurable lines, not a contingency allowance. Where the schedule leaves the shell open in January, the takeoff carries temporary enclosures by area, concrete protection by area, and temporary heat as a schedule-derived line with the duration stated, so a later schedule change reprices cleanly instead of hiding inside a lump sum. Blankets and heated enclosures follow the sections and the winter-work notes; nothing is added because the calendar says January. Winter staging is measured only where the civil sheets draw it. Envelope quantities follow the same discipline: the 2024 Minnesota Commercial Energy Code, built on ASHRAE Standard 90.1-2019 and effective January 5, 2024, governs commercial buildings and residential buildings four stories and taller, so insulation, glazing, and air-barrier quantities on a current set come from the energy forms for that code, not from a detail drawn under the edition it replaced.

Prevailing wage in Minnesota turns on contract size first and on the rate schedule second. The U.S. Department of Labor's January 1, 2023 table lists a $2,500 threshold where a single trade is involved and $25,000 where more than one trade is involved; below the threshold, the state prevailing-wage law does not cover the contract, and above it the rate comes from the Department of Labor and Industry's schedules for the project county and construction type — commercial, highway and heavy, and residential are separate schedules, and the contracting agency names the applicable rates in the bid documents. Private work takes no determination at all. For scale, the May 2025 statewide averages from the Bureau of Labor Statistics are $41.00 an hour for cost estimators (series OEUS270000000000013105103) and $31.12 an hour for construction laborers (series OEUS270000000000047206103); those are labor-market figures, not bid rates and not prevailing-wage rates.

Procurement and labor notes for Minnesota

Minnesota state-funded construction and public works estimates should identify the project county, construction type, and state funding before labor assumptions are finalized. Commercial, highway, and heavy classifications can use different wage schedules.

Minnesota contracting agencies must identify prevailing-wage applicability and include the applicable rates and labor conditions in the bid and contract documents. Use the current agency package, drawings, specifications, forms, and addenda.

Minnesota DLI sets certified rates by county and construction type for covered state-funded work. The estimate should use the project-specific commercial or highway/heavy basis and the stated classifications; do not apply a single statewide labor rate.

Estimating services and trade scopes

Choose a measured takeoff if you plan to apply your own rates. For a priced bid estimate, agree on the trade boundaries, labor basis, supplier quotes and allowances with your estimator.

Concrete takeoff

For a Minnesota bid with winter foundation work, use the structural sections for frost-protection dimensions and the schedule for temporary heat and protection. Keep quantities and schedule-dependent allowances in separate lines so a timing change can be priced cleanly.

Insulation takeoff

For a Minnesota envelope bid, track insulation by roof, wall and foundation assembly. Mark transitions at parapets, rim joists and slab edges where the details assign continuity work to a specific package.

What to send and what to request

Bid drawings and inputs
Footing sections, geotechnical report, wall and slab-edge sections, project winter work notes.
Estimate deliverable
Concrete and formwork schedule, perimeter insulation areas and linear thermal transitions.
Request an estimate for a Minnesota project

Browse estimating services and trades

Find the drawings, quantities and deliverables for your scope. For a Minnesota project, share your bid documents so we can confirm which items belong in the quote.

Minnesota questions before a number is issued

Is frost depth the same in Minneapolis and Duluth?

No. Minnesota sets frost-protection depth by zone, and the north is deeper. Use the zone for the project county and the detail on the structural sheets.

What contract size triggers Minnesota prevailing wage?

The January 2023 DOL table lists $2,500 for a single trade and $25,000 where more than one trade is involved, for the state-funded projects those sections cover.

What does a Minnesota construction takeoff include?

Measured quantities from your drawings — concrete, rebar, formwork, framing, insulation, roofing, and MEP counts, lengths, and areas — returned as a schedule with a sheet reference beside every line. You apply your own rates, or ask for a priced estimate as a separate scope.

Which frost zone is my Minnesota county in?

Minnesota Rules, part 1303.1600, lists every county: Zone I is 34 northern counties at a five-foot minimum footing depth, and Zone II is the other 53 counties at three and one-half feet. Duluth sits in Zone I; Minneapolis, St. Paul, Rochester, and St. Cloud sit in Zone II. Name the project county when you send the drawings.

What winter quantities belong on a Minnesota takeoff?

Temporary enclosures and concrete protection by area, and temporary heat as a line with its duration stated — all taken from the sections, the schedule, and the winter-work notes. A duration change then reprices cleanly. Winter quantities are never a silent percentage added to the total.

Does prevailing wage apply to my Minnesota project?

It depends on funding and contract size. On state-funded work, the January 2023 federal table sets the coverage thresholds at $2,500 for a single trade and $25,000 where more than one trade is involved. Above the threshold, the rate comes from the Department of Labor and Industry's schedule for the project county and construction type, named in the bid documents. Private work is not covered.

Official references for Minnesota

Compare a marked-up quantity sheet in the sample library before sending a set.