Demo plans · Selective versus full · Not a laborer rate
Boston demolition quantities are the hatches on the demo plans, and a laborer statistic is not a wrecking price
A Boston demolition number is two different products until the demo plans say which one you bought. Full removal is building volume plus foundation if those notes include it. A gut that keeps the shell is finish area, partition length, and only the slabs the plan marks for removal. 780 CMR Tenth Edition, effective 11 October 2024, is the code context on the log. It does not create debris yardage.
Shoring or needles at a party wall are linear feet only when a shoring sheet draws them. A freestanding building does not inherit a neighbor wall. Chimney removal is a count of flues the elevation marks. Saw-cuts for a new opening are lengths. Street occupancy, if the invitation describes it, is a general-requirement line, not tons of rubble.
Abatement stays off the demolition total unless a report is in the set and you ask for that scope to be listed. No abatement price is invented. Salvage the owner wants returned is a count from the specification, not a credit.
There is no demolition occupation in the Boston-Cambridge-Newton file. Construction Laborers are published at $34.30 on OEUM001446000000047206103. Using that hourly figure as a wrecking crew price would mis-state the bid. Covered public work uses the Department of Labor Standards schedule for that project. The January 2023 chart shows no dollar minimum. A private gut does not pick up that schedule.
Cambridge or a New Hampshire sheet in the same PDF is flagged and left out of the Boston quantity. What you receive is the split between gut and full removal, the shoring lengths that were actually drawn, and the gaps.
A brownstone gut that keeps the brick shell is interior finish area plus only the floors the plan removes. The facade stays. Chimney breasts that remain are excluded from new work and listed. A rear ell demolition is that ell only. Saw-cutting a new opening in a party wall is linear, and the wall itself is not removed.
A Boston selective demolition sheet that keeps the party wall counts only the finishes and the partitions the hatch marks. The party wall itself stays. Shoring called out at an opening cut through that wall is a length of shoring, and the wall is not removed. A rear ell that is fully removed is the volume of that ell, foundation included only when the notes include the foundation. Chimney flues that remain are listed as remain and are excluded from debris. Lead-paint abatement is included only when an environmental report is attached, and the report’s own quantities are used. Flooring removal on a gut is the floor area the demo plan hatches, not the whole building. Ceiling removal is ceiling area where the reflected plan marks it. A slab to remain with a new topping is not a demolition quantity.
Demolition quantities before treating a Boston gut as a cleared lot
Boston demolition bid questions
Do you assume party-wall shoring on every Boston demo?
No. Needles and underpinning are quantities only when a shoring sheet shows them.
Is $34.30 a wrecking rate?
No. OEUM001446000000047206103 is Construction Laborers. Demolition is not its own published line.
Is hazardous material in the demolition total?
Only when a report is attached and you ask for that scope. No price is filled in for it.