Equipment schedule · Tenth Edition · Stretch only if attached
Boston mechanical quantities follow the equipment schedule, and a stretch energy form is used only when the set includes it
Tag counts and duct measures are the Boston mechanical product. Statewide context is the tenth edition of 780 CMR, in force since 11 October 2024. Ventilation or efficiency changes only if a municipal stretch sheet or a specialized energy sheet was bound into this set. City adoption of that sheet is not claimed here. A clash between that sheet and the equipment list is written down. No machine is added to satisfy a sheet that never arrived.
Air handlers, boilers, heat pumps, and fans are each-counts from the tags. Outside air and exhaust are separate from capacity. A Zone 5 winter does not add a boiler the list omitted. Sheet-metal mains are squared or weighed from the issued duct layout. Refrigerant runs are lengths by size. Controls stay blank until a points list arrives.
Series OEUM001446000000049902103 reports $38.41 an hour for Heating, Air Conditioning, and Refrigeration Mechanics and Installers across Boston-Cambridge-Newton, MA-NH. That figure is the mechanic, not a ton of heating. Cambridge sits inside the statistic and remains another city. Sheet-metal workers are a different occupation. Private packages do not pick up a Department of Labor Standards schedule. Covered public work uses the schedule inside that solicitation. January 2023 lists no dollar floor.
Hood exhaust stays on the hood sheets. Makeup air is its own mark. A flue is not comfort heat. Condensate is linear. A curb is flagged so the roof trade is not also buying it. Steam radiators in a rehab are counts of units to remain versus new, taken from the demolition and new-work plans. They are not a new hydronic loop unless the piping plan draws the loop.
Balance work is included only if you ask for it. Laboratory exhaust is its own system when those sheets exist. A Newton equipment list is not extended on a Boston form. The deliverable is the tag counts, the duct measures, the energy-form note, and the gaps.
Steam radiators to remain versus new are counts from the demolition plan and the new-work plan. They do not become a hydronic loop unless the piping drawings show the loop. A rooftop dunnage frame is steel, not the unit sitting on it. Perimeter radiation is linear. A CRAC in a server room is an each from that room’s plan.
Mechanical quantities before assuming a Boston stretch-code adoption
Boston mechanical bid questions
Will you add equipment to meet a stretch code?
Only if this set includes that form and the equipment list already shows the machine. A disagreement is logged. A machine is not invented.
Is $38.41 a price per ton?
No. OEUM001446000000049902103 is the hourly statistic for Heating, Air Conditioning, and Refrigeration Mechanics and Installers.
Does a Cambridge set use Boston forms?
No. Cambridge is another city. The cover is logged as Cambridge when that is what it says.