F&K Estimatings Construction Estimating & Takeoffs

Missouri cities and counties; Department of Labor for prevailing wage

Missouri Construction Estimating for Excavation and Steel

F&K estimates Missouri work from the drawings you send. There is no Missouri office, no site walk, and no permit filing.

Missouri has no statewide building code for private construction. St. Louis, Kansas City, and other cities adopt International Codes with their own amendments. A metro-east comparison with Illinois is a different state’s law. Record the city or county that will review the permit.

Zones 4 and 5, cold winters, humid summers, and severe storms are the climate. Karst limestone in the south and New Madrid seismic influence in the southeast change foundations and anchorage when the structural and geotech documents say so. Moderate frost is the usual footing constraint.

The DOL table dated January 1, 2023 lists a $75,000 prevailing-wage rule: projects of $75,000 or less are exempt. Above that, rates depend on the county survey. Do not apply a St. Louis rate in a rural county. F&K has no Missouri storefront.

Procurement and labor notes for Missouri

Missouri public-work estimating should identify the locality or county, public-body status, and adopted jurisdictional code information. State sources caution that listed building-code data may not include local amendments or every trade code.

Use the public body's current solicitation, plans, specifications, bid forms, addenda, and any incorporated wage order as the controlling procurement package. Missouri public-work requirements differ from private work and must not be generalized across every project.

Missouri law ties public-works wage requirements to the locality where work is performed and distinguishes prevailing rates from the public-works contracting minimum wage. Confirm the current occupational determination and locality before pricing labor.

Estimating services and trade scopes

Choose a measured takeoff if you plan to apply your own rates. For a priced bid estimate, agree on the trade boundaries, labor basis, supplier quotes and allowances with your estimator.

Sitework estimating

For a southern Missouri project with karst noted in the geotechnical report, record excavation classes and export limits from the documents. Separate measured earthwork from any provisional rock, void treatment or disposal allowances.

Structural steel estimating

For a southeast Missouri steel package with seismic detailing, send structural connection notes and equipment restraint drawings. Separate fabricated members, field connections and specified anchorage so those responsibilities can be assigned to the right bidder.

What to send and what to request

Bid drawings and inputs
Grading and utilities, geotechnical borings, structural framing and connection responsibility matrix.
Estimate deliverable
Earthwork balance by material class and steel tonnage with connection and erection assumptions.
Request an estimate for a Missouri project

Browse estimating services and trades

Find the drawings, quantities and deliverables for your scope. For a Missouri project, share your bid documents so we can confirm which items belong in the quote.

Missouri questions before a number is issued

Does the St. Louis building code apply in St. Louis County?

No. The City of St. Louis and St. Louis County are different governments with different adoptions. Read the authority on the title sheet.

Are small Missouri public projects prevailing-wage projects?

The January 2023 DOL chart exempts projects of $75,000 or less. Larger covered projects use the county determination, not a statewide average.

Official references for Missouri

Compare a marked-up quantity sheet in the sample library before sending a set.