Specified products · Lead times you supply · No invented buyer wage
Boston material lists are the products the specifications name, not a purchasing desk and not a wage
Material procurement support for a Boston bid is a list of the products the specifications and schedules name, with the quantities measured from the drawings, prepared remotely. It is not a purchase order and not a supplier relationship. 780 CMR Tenth Edition, effective 11 October 2024, is the statewide code context. An energy stretch form changes a product only when that form is in the set and names a different product. This page does not assert that Boston has adopted the stretch code.
Each line carries the spec section, the product or the basis-of-design name, and the quantity. An “or equal” is copied as an or-equal. It is not replaced with a favorite brand. Long-lead items are flagged only when you tell us the lead time or the spec names one. A blank lead time stays blank.
No purchasing occupation is cited. A cost-estimator statistic would pretend this list is a priced estimate. The gap is left open. Prevailing wage, when the job is covered, is a labor schedule from the Department of Labor Standards. It is not a material price. The January 2023 chart shows no contract-size minimum. A private job does not receive a public schedule.
Alternates that swap a product are listed on the alternate, not silently merged into the base. Owner-furnished items are excluded and listed so they are not bought twice. Attic stock is a quantity only when the spec states one. Tax treatment of materials is left for your accountant. This list does not choose lump-sum versus separated contracting.
Cambridge and Newton product lists are not mixed into a Boston list without a note. A New Hampshire spec section is a different code environment. Submittal counts are not quantities of material. They are closeout items left off unless you ask for them.
Weather protection and storage are means notes only if you ask for means. A basis-of-design light fixture is a count from the lighting plan plus the spec section. It is not a wattage.
Upload the specifications and the schedules, and mark anything you already hold a quote for so it is not listed as open. No supplier is called.
A basis-of-design window is a count of marks plus the performance the spec prints. Hardware sets are counts by set number. Appliance packages are counts of symbols, and a color option is not a second appliance.
Material lists before treating a Boston or-equal as a brand choice
Boston material-list questions the spec has to answer
Will you pick an or-equal?
No. The specification’s or-equal stays an or-equal. A substitution is your decision, not a line this list silently changes.
Do you call suppliers?
No. The work is a reading of the documents. Lead times are written only when you or the spec provide them.
Is there a buyer wage on this page?
No. No honest purchasing occupation is cited. The list is quantities and product names, not a labor rate.