CMU · Brick repair · Department of Buildings
New York City masonry splits into new walls and repair drawings, and they do not share a unit price
Masonry inside the five boroughs is either new wall or work on a wall that is already standing, and the Department of Buildings reviews both under the building code of that filing. Current applications use the 2022 New York City Building Code, effective 7 November 2022. Repair drawings are often an elevation with hatches for repointing, brick replacement, pin quantities, and shelf-angle work. New CMU is a wall-type schedule with grout, rebar, and control joints. Putting both on one square-foot price erases the labor difference. Measure them as different sections.
For new walls, count units from area and the specified bond, then grout and reinforcing from the structural notes. Lintels, flashing, and weeps come from the details. For repair, measure the hatched area, the replacement brick count if it is scheduled, and the linear feet of joint the elevation dimensions. Do not turn a facade-inspection cycle into a percentage of the whole elevation. If the elevation does not hatch the repair, there is nothing to quantify. Scaffold and hanging rigs are access. Include them only when the bid form makes access the mason’s scope rather than a general-contractor logistics item.
Backup CMU on a tower, a brick mid-rise, and a parapet rebuild are the drawing types this page is describing. They are not a portfolio. Stone patching, where it appears, is yet another material. Cold-weather protection for winter mortar is a means-and-methods cost you add when the schedule says the work will be laid in freezing weather. It is not a permanent material quantity.
Brickmasons and Blockmasons in the New York-Newark-Jersey City metro are published at a $45.58 mean hourly wage on May 2025 OEWS series OEUM003562000000047202103. Restoration mechanics and pointers are not broken out of that title. Do not treat the average as the installed price of a pin or a square foot of repointing. Public work uses the wage schedule in the specifications.
Cavity walls need the backup, the veneer, the insulation thickness if the mason holds it, and the anchor schedule as separate extensions. A brick veneer on steel stud backup is not the same labor as a structural CMU pier. Through-wall flashing at shelf angles is a linear foot measured at each floor the detail repeats, not once for the building. Weep counts follow the spacing note. If the detail says “weep as required” and gives no spacing, flag it. Do not invent a weep every 24 inches because that spacing is familiar. Loose-laid brick at a parapet rebuild is a count of salvaged versus new units only when the note distinguishes them.
F&K does not sound the facade or rent a hanging scaffold. Send wall sections for new work, or the repair elevations and probe notes for existing work, plus the specification. The count follows the ink.
Masonry takeoff scope before any city amendment
NYC masonry splits that belong in the estimate
Should a facade repair use the same unit price as new brick?
No. Repointing, brick replacement, and new CMU are different operations. Price the operation the elevation or the wall type actually shows.
Do you assume a full-elevation rebuild because a facade inspection is due?
No. Only hatched or scheduled repairs are quantities. An inspection cycle is not a scope of work.
Is scaffold in the masonry number?
Only if the bid form assigns access to the mason. Otherwise it stays with the logistics scope so it is not counted twice.