F&K Estimatings Construction Estimating & Takeoffs

Selective removal · Existing plans · Department of Buildings

New York City demolition quantities are the existing drawings, not a building class

Most demolition sets inside the five boroughs are selective, not a wrecking ball on an empty block. The Department of Buildings reviews the alteration under the construction codes that apply to that filing. The 2022 building volume, effective 7 November 2022, is the current book for new applications. An alteration filed earlier stays on the edition of that application. Measure the removal the demolition sheets hatch: partitions, finishes, slabs, and equipment. “Gut to shell” is not a quantity until the drawings show the shell that remains.

Debris volume is calculated from the assemblies removed, with a haul unit you can see. Shoring and temporary protection are included only where details or notes show them. Sidewalk bridges and hoist runs are famous on city streets and still are not automatic line items. If the logistics plan draws them, count them. If it does not, exclude them. Asbestos and lead handling is a licensed abatement scope with its own survey. This takeoff does not replace that survey and does not invent an abatement quantity from the building’s age.

A floor plate in a tower, a brownstone interior, and a one-story taxpayer are different waste streams and different access. Saying so is a description of drawings, not a claim that any of them is our project. Salvage is listed only when the documents call for it. Night work and neighbor protection are bidder means and methods unless a specification section quantifies them.

There is no OEWS occupation titled demolition contractor. The closest published construction occupation in the metro is Construction Laborers. May 2025 series OEUM003562000000047206103 reports a $32.42 mean hourly wage. Using that number as a wrecking-crew rate would be a mistake. It is a laborers statistic for New York-Newark-Jersey City, nothing more. Public prevailing wage, when the contract is covered, replaces it.

Partial slabs and infill at old shafts need both a removal quantity and a “make good” exclusion or a separate new-construction section. Saw-cut lengths are linear feet from the structural demo plan. Equipment to remain gets a protection note, not a disposal load. If the set shows a pedestrian shed only on the logistics sheet and the demo contractor is not assigned that sheet, leave the shed out of the demo total and say where it went. Haul-off that crosses a scale house is still estimated as volume from the assemblies, not as a ticket the city has not issued. Floor finishes removed above a slab that stays are a finish quantity, not a structural demolition quantity.

F&K does not walk the floor to confirm what is still there. Send existing plans, the demolition drawings, the survey if you have one, and the phasing notes. Quantities follow those sheets.

Demolition measurement scope that is not limited to this city

NYC demolition items that are easy to double-count

Do you include a sidewalk shed on every Manhattan alteration?

No. Sheds, hoists, and bridges are counted when the logistics drawings show them. An undrawn shed is an exclusion.

Is abatement inside the demolition quantity?

No. Asbestos and lead removal need a survey and a licensed abatement price. Age of the building is not a substitute for that survey.

Is the laborers wage a demolition price?

No. Construction Laborers is the published occupation used as a reference because demolition is not its own OEWS line. It is not a crew rate.

References used for NYC demolition notes

Upload the NYC demolition and existing plans

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.