Ongoing New York City estimates still start as a remote reading of each set
An arrangement to price a run of New York City bids is not a person sitting in a borough office. Each set is still read on its own. Inside the city limits the Department of Buildings enforces the 2022 Construction Codes, in force since 7 November 2022, including the building and plumbing volumes on a 2015 model-code base with city edits. The state uniform code is the rule outside the city, not inside it. Write the code year from the title sheet into the assumption log for that bid. The next bid on the list may be a different occupancy and a different edition note if the permit was vested earlier.
Labor is the line that gets estimators in trouble. Cost Estimators in the New York-Newark-Jersey City metro show a $44.54 mean hourly wage under May 2025 OEWS series OEUM003562000000013105103. That is the estimating occupation, not the electrician and not the carpenter. Trade wages, when you want them in the estimate, come from the determination the public contract attaches or from the rates you supply. The January 2023 federal chart shows no dollar minimum for New York prevailing wage. Coverage is still a project question. A private landlord bid does not pick up a public schedule because the last job on the list was public.
What you get, bid by bid, is a division breakdown, quantities tied to sheets, and a list of exclusions. Your spreadsheet and your cost codes are the format when you send them. Alternates stay alternates. A facade repair and a ground-up school do not share a general-conditions template just because both say New York. General conditions are built from the duration and the requirements in that bid form.
Keep a drawing log per bid: issue date, addendum numbers, and which consultant set is missing. A structural addendum that changes slab edges does not belong in the narrative of an interior fit-out received the same week. When two bids share a contractor but not an owner, their general-requirements sheets still differ. Insurance exhibits and allowance schedules are transcribed, not reinterpreted. If the allowance says “façade repairs, $X,” the estimate carries that allowance and does not invent a repair quantity behind it. Unit prices requested on a bid form are filled only for the lines you ask us to price; blank unit-price rows stay blank with a note, rather than receiving a citywide placeholder.
F&K does not staff a trailer at the site and does not become the expediter. Permit filing, sidewalk-shed design, and special inspections stay with the people the contract names. Send the bid list, the due dates, and the current issue of each set. The written quote for the support itself states the fee and which bids are in it.
How ongoing estimating support works outside this city
Before treating NYC bids as one ongoing assignment
Is the estimator an employee in the city?
No. The work is remote and limited to the drawings and the scope in the quote. There is no local hire and no desk at the Department of Buildings.
Will every bid on the list carry prevailing wage?
No. Public coverage follows the solicitation. Private work does not inherit a wage decision from a different project on the same list.
Can one assumption log cover the whole bid list?
Code year, wage decision, and owner should be recorded per bid. A vested permit on an older edition is not the 2022 book.