F&K Estimatings Construction Estimating & Takeoffs

Schedules · Wind pressure · Department of Buildings

New York City openings are a schedule, a rating, and a wind pressure, counted separately

Door and window counts for a parcel inside the five boroughs follow the 2022 New York City Building Code, the building volume of the Construction Codes that took effect on 7 November 2022. The Department of Buildings is the reviewer. The state uniform code stops at the city line, so a Long Island specification is not a backup book. Exterior openings have to meet the wind pressure and energy performance the documents print. Those values are not guessed from the borough. Fire-rated openings follow the rating on the life-safety sheets. Hardware sets are a count from the hardware schedule or the specification, not one closer per leaf.

Build the takeoff from the door schedule and the window schedule as two registers. Frames, leaves, sidelights, borrowed lites, storefront bays, and curtain-wall panels do not collapse into a single “opening” unit. Glazing type stays with the unit that carries it. Flashings and receivers are lengths when the details draw them. Where housing rules call for window guards, count the guards the schedule or the note actually requires. Do not hang a guard on every punched window because the building has apartments. Interior office fronts are a different product and a different labor crew from a tower’s curtain wall.

The sheets that show up are lobby replacements, school window packages, tower curtain wall, and storefront on the ground floor of a mixed-use building. Naming those drawing types is not a client list. A curtain-wall bid that also asks for interior wood doors needs two scope breaks, because the installers and the hardware are not the same package. Alternates for a glass type stay alternates until the bid form awards them.

Glazing labor in the published metro table is not the door-hardware trade. Series OEUM003562000000047212103, May 2025 OEWS, reports Glaziers in New York-Newark-Jersey City at $35.43 an hour on average. That occupation does not install every hollow-metal frame. Treat the figure as a labor-market reference only. Public projects still take the wage determination written into the contract. Private landlord work does not grow a prevailing-wage column by being inside the city.

Replacement packages need an existing-to-remain column. A window that stays is not a new unit, and a frame that stays with a new leaf is not a full opening. Borrowed lites inside rated corridors pick up the rating of the wall they sit in, which is a life-safety note rather than a window-type mark. Storefront at the sidewalk also picks up sill flashing and often a different glass makeup from the floors above. Write those breaks into the register before anyone multiplies a single installed price across the elevation.

Nobody from F&K stands at the hoist or measures a rough opening on site. The work is a document count. Upload the schedules, the elevations that show what the schedules missed, the hardware specification, and the addenda.

National door and window takeoff scope, without the city amendments

What to separate before an NYC opening number is useful

Can one unit price cover curtain wall and apartment entry doors?

Not usefully. They are different products, different hardware, and usually different subcontractors. Keep the registers separate and let the bid form say if a single contractor holds both.

Do you add window guards to every residential opening in the city?

No. Guards are counted where the schedule or a code note on the set requires them. A silent schedule does not get a citywide guard allowance.

Will you field-measure existing windows in a walk-up?

No. Existing sizes are taken from the survey or the demolition drawings you provide. A missing survey is an exclusion.

Authorities checked for NYC openings

Send the NYC door and window schedules

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.