F&K Estimatings Construction Estimating & Takeoffs

2022 NYC Plumbing Code · Risers · Five boroughs

New York City plumbing stays on the 2022 city code and the riser diagrams

Interior plumbing for a site in the five boroughs is reviewed by the Department of Buildings under the 2022 New York City Plumbing Code, one volume of the Construction Codes effective 7 November 2022. That volume is a city amendment of the model plumbing code, not the International Plumbing Code as a suburb would adopt it, and not the state uniform code. Fixture units, materials, and venting follow the city amendments the designer used. If the cover sheet is silent, ask. Do not import a New Jersey or Westchester pipe specification because the metro wage table lumps those places together.

Quantities start at the riser diagrams and the fixture schedule. Waste, vent, storm, and domestic water are separate materials and sizes. Valves, cleanouts, carriers, and interceptors are counts. A roof tank or a house pump is equipment only when the drawings show it. Older walk-ups sometimes still have a tank and sometimes do not; the set decides. Water-service and sewer work that crosses the property line is a different approval from the interior stack. Keep that scope on its own line or exclude it. Insulation on horizontal mains and hangers are lengths and counts from the spec, not a percentage of pipe.

Tall residential risers, commercial kitchens, and medical gas where the specification calls for it are different drawings. A kitchen interceptor is not a bathroom group. Medical gas is not domestic water. Name the system. Frost depth is a moderate, site-specific bury question on the civil sheet. There is no single borough frost depth to drop into a trench volume.

Plumbers, Pipefitters, and Steamfitters in the New York-Newark-Jersey City area show a $43.66 mean hourly wage on May 2025 OEWS series OEUM003562000000047215203. Pipefitters and sprinkler fitters sit inside that same published title, so the number is broader than a residential service plumber. It is not the installed price and not the prevailing-wage rate. Covered public work uses the determination in the bid book. A private gut renovation does not.

Storm leaders and sanitary stacks should not share a pipe total even when they run in the same shaft. Roof drains, overflow scuppers, and area drains are fixture-like counts with their own pipe. A commercial kitchen adds grease waste that a residential riser does not have. If the food-service drawings are “issued later,” exclude that waste system instead of planting an allowance sized from the dining-room area. Carriers and chair carriers behind wall-hung fixtures are easy to miss when the plan only shows a symbol; take them from the specification or the mounting detail.

The estimate is prepared from files. F&K does not pull a plumbing permit, does not camera a stack, and does not keep a shop in any borough. Send risers, plans, the fixture schedule, the specification, and a note saying whether the street connection is in or out.

Plumbing takeoff method used outside New York City

NYC plumbing scope questions worth answering first

Is the NYC plumbing code the same IPC a New Jersey town adopted?

No. The 2022 New York City Plumbing Code is a city volume with its own amendments. A metro wage table that includes New Jersey does not make the codes the same.

Do you include the water-service tap in the interior plumbing price?

Only when the drawings and the bid form put that work in the contract. Street connections are a separate approval. If they are undrawn, they are excluded.

Does every old building still get a roof-tank allowance?

No. Tanks and house pumps are quantified when the plumbing drawings show them. A missing domestic-water diagram is a question, not a typical tank.

Plumbing sources for the five boroughs

Upload NYC plumbing risers and the fixture schedule

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.