New York City floor quantities come off the finish schedule and the slab note

A flooring bid that says only “New York” has not named an authority. Inside the five boroughs the Department of Buildings reviews the building under the 2022 Construction Codes, effective 7 November 2022 and written on a 2015 IBC base with city amendments. A Westchester or Nassau address that a broker still calls New York is outside that book and outside that counter. The cover sheet has to say which one this set is. Flame-spread and smoke limits for interior finishes follow the occupancy chapter the code analysis cites. Price the product the finish schedule names. Do not swap in a catalog floor because it is common in Manhattan rentals.

Alterations are the usual sheet, not a new slab on grade. Measure each finish by room from the schedule: resilient, carpet, wood, stone, and tile stay on separate lines, with waste for pattern and seams called out instead of buried. Base, reducers, and stair finishes are counts and lengths, not a percent of area. Where the existing slab is staying, moisture criteria and patching are their own items if the specification or a note requires them. If the note is missing, the line is an exclusion. Elevator protection and after-hours access are means and methods the bidder owns unless the documents assign a quantity.

High-rise cores, school corridors, and retail ground floors do not share a prep detail. A core might be a few hundred square feet of tile at the elevators and carpet in the offices. A school might be sheet goods with welded seams. A store might be a polished concrete alternate plus a stone entry. Those are drawing types, not clients and not a count of jobs. Landmark review, when it applies, is an exterior or interior-landmark question the drawings either reflect or do not. This takeoff does not file with Landmarks.

Two published wages sit near this trade and must not be averaged. May 2025 OEWS series OEUM003562000000047204203 puts Floor Layers, Except Carpet, Wood, and Hard Tiles in the New York-Newark-Jersey City metro at a $36.29 mean hourly wage. Tile and stone are a different line: series OEUM003562000000047204403, Tile and Stone Setters, $32.83 mean hourly. Carpet and wood installers are neither series. None of those figures is a crew rate, a prevailing-wage sheet, or a price for this takeoff. On public work, New York’s prevailing-wage law has no dollar minimum on the January 2023 federal chart; the determination in the specifications is the one that matters, and a private interior fit-out does not inherit it.

F&K reads the uploaded finish plans from elsewhere. There is no Manhattan desk, no site moisture test, and no walk-through of the existing floor. Send the current finish schedule, the specification section, any moisture or leveling notes, and the bid form. Quantities are what those sheets show.

Flooring measurement rules that are not city-specific

Flooring questions that change a New York City count

Does a “New York” mailing address put the floor under the Department of Buildings?

Only when the parcel is inside the five boroughs. Suburban addresses that use New York in the marketing name are different building officials and different codes.

Should every NYC slab get a moisture-mitigation allowance?

No. Mitigation, patching, and leveling are measured when the specification or a finish note requires them. A silent note is an exclusion, not a typical square-foot adder.

Is the floor-layer wage the rate for tile?

No. Floor Layers, Except Carpet, Wood, and Hard Tiles and Tile and Stone Setters are separate May 2025 OEWS occupations. Wood and carpet are separate again. None of them is the bid rate.

Where the NYC flooring facts were checked

Upload the New York City finish set

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.