Grading plan · Borings · Landscape article is not the takeoff
Fort Worth cut and fill come from the grading plan, and the zoning landscape article is not an earthwork quantity
Earthwork on a Fort Worth site is measured from the civil grading plan and the geotechnical report. Development Services publishes the building and energy codes. Those books are not an earthwork manual. The same city page points landscaping to Appendix A, Chapter 6, Article 3 of the zoning ordinance. That citation is a land-use article. It does not become plant counts or cubic yards unless a landscape or grading sheet actually draws the work.
Stripping, excavation, and embankment are separate volumes taken from the existing and proposed surfaces. If the existing surface never arrived, that volume stays blank. A lime-treated or cement-treated subgrade appears only where the paving specification calls for the treatment. Shrink-swell soil turns into extra dig or a foundation system only when this boring log says so. A silent log leaves the question open.
Ponds, inlet structures, and storm lines come from the drainage PDF and are skipped when that PDF is missing. Curb, sidewalk, and paving sections are not the building’s concrete. Trench lengths follow the utility plan by pipe diameter. Silt fence and inlet protection follow the erosion sheet as lengths or counts. Classified rock is included only when the borings name it.
Series OEUM001910000000047207303 records Operating Engineers and Other Construction Equipment Operators at $26.51. BLS geography for that series is Dallas-Fort Worth-Arlington. People classified as laborers are a separate line and are not blended here. The operator statistic is not a price for a cubic yard. How many trips a truck makes is your production guess.
Old pavement removal is the area the demolition sheet hatches, and the new paving thickness is a different measurement. Wall concrete stays on the wall sections. Trees to be removed are a count from a survey. How far spoil is hauled stays blank until you name a pit.
Upload the grading surfaces, the boring log, and the drainage PDF when ponds are part of the request. The rock line is not guessed from a walk that does not happen.
A fire lane shown only as a note, with no paving section, is not given a thickness. Wheel stops are pieces when the paving plan shows them. A retaining wall that is segmental block rather than concrete is a face area from the wall profile, and the geogrid length is taken from that profile only. Import and export volumes are not netted into one number unless you ask for a single haul figure.
Earthwork quantities before turning Fort Worth’s landscape article into yards
Fort Worth earthwork questions the civil set has to answer
Does the zoning landscape article add plants to the earthwork?
No. The city page cites that article as a zoning reference. Plants are counted only from a landscape sheet that was actually sent.
Do you add piers or extra excavation because the region has expansive soil?
Only when this geotechnical report calls for that treatment. A missing report leaves the condition open.
Is $26.51 a yard price?
No. Series OEUM001910000000047207303 is the published hourly statistic for Operating Engineers and Other Construction Equipment Operators across the combined metro.