F&K Estimatings Construction Estimating & Takeoffs

Oklahoma City, Oklahoma · Remote estimating support

Sitework Estimating Services in Oklahoma City, OK

Send your civil drawings and F&K will measure the sitework for your Oklahoma City bid — cut and fill from existing and proposed grades, storm, sanitary and water runs by size and depth, paving, curbs and erosion control, each on its own basis so your pricing team can see what is measured and what is assumed. Once the drawings are in, we send a written quote setting out the fee and when the takeoff will be ready.

Send plans for a scope quote

Project context and local references

Permits for the work run through the City of Oklahoma City Development Services Department; its Development Center at 420 W. Main St. takes plan-review questions at (405) 297-2525. Oklahoma City still enforces the 2018 International Building Code and International Existing Building Code, while the Oklahoma Uniform Building Code Commission has set the 2024 IBC as the statewide commercial minimum, effective September 14, 2026 — a rule that expressly passed over the 2021 edition. The city's own move to the 2024 editions is under way: advance notice went out September 22, 2026, hearings run from October through the winter, and adoption may reach spring 2027, though the city warns those dates may shift. The market is new-subdivision work: Census permit data for 2025 records 5,236 homes authorised in the city, 3,896 of them single-family — nearly three in four — at a combined permit valuation of $1,160.6 million. That mix points sitework at greenfield phases rather than tight infill lots. Labour is cheap here: the Bureau of Labor Statistics puts the May 2025 mean wage for construction laborers in the Oklahoma City metro at $20.87 an hour (series OEUM003642000000047206103). Two local facts shape quantities: shrink-swell clay soils, which push over-excavation and select fill into the earthwork, and roofing permits, separate since August 1, 2025 at $94.50 and typically issued the same day, so restoration scope on redevelopment bids carries its own permit line.

measure sitework quantities from your civil drawings

Hypothetical worked example · not a client project or market quotation

Picture a 40-lot single-family phase on fresh ground. Suppose the grading plan shows 150 cubic yards of cut and fill per lot, or 6,000 cubic yards across the phase. At a stated allowance of two laborer-hours per 100 cubic yards, the earthwork handling alone comes to 120 laborer-hours. Priced at the metro mean of $20.87 an hour, that is $2,504.40 before equipment, haul, supervision or any select fill the geotechnical report calls for. The point is the basis: bank, compacted and loose volumes are different numbers, and a bid that prices one total three ways will be wrong twice.

Review before pricing

Three things get settled before pricing. First, the code edition: a set drawn to the 2018 codes prices differently from one drawn to the 2024 state minimum, and the estimate records which one it follows. Second, the ground: the geotechnical report decides whether shrink-swell clay means over-excavation, lime treatment or select fill, and quantities follow its recommendations. Third, the haul: disposal and import assumptions, haul distance and off-site ownership are written down as inputs, not folded into a unit rate. If the job is publicly funded, say so — Oklahoma has no general state prevailing-wage law, but federally funded work can still carry Davis-Bacon rates.

Documents and requested output

Send the grading and utility drawings, the geotechnical report and its boring logs, and the existing survey or topography, plus the project address, the drawing issue being priced and the bid date. Ask for cut and fill in cubic yards, utilities in linear feet by size, structures each, and paving and erosion control on separate lines, with haul and disposal assumptions stated apart from measured quantities.

What to confirm before comparing bids

Check that every bidder prices the same limit of disturbance and the same utility handover points; a low number often means a shorter trench, not a cheaper one. Confirm who owns temporary access, disposal and off-site connections, and whether restoration is inside the bid or with another package. Ask each return to separate removals from new work, and to show unsuitable-material handling as its own line rather than burying it in the earthwork rate.

Scope checklist

  • Grading and utility drawings, current issue, with the limit of disturbance marked
  • Geotechnical report with boring logs and its earthwork recommendations
  • Existing survey or topography for cut and fill
  • Project address, jurisdiction and the code edition shown on the code sheet
  • Bid date plus the breakdown your pricing team needs — CSI, bid form or your cost codes
  • Haul and disposal assumptions, and which contractor carries off-site connections
  • Public or private funding, and any wage determination that applies to the job

Source documents for project review

Local references checked . Confirm the current requirements with the project team and relevant authority.

Questions for this estimating scope

What information helps us measure sitework quantities from your civil drawings?

Send the grading and utility drawings, the geotechnical report and its boring logs, and the existing survey or topography, plus the project address, the drawing issue being priced and the bid date. Ask for cut and fill in cubic yards, utilities in linear feet by size, structures each, and paving and erosion control on separate lines, with haul and disposal assumptions stated apart from measured quantities.

What needs review before this scope is priced?

Three things get settled before pricing. First, the code edition: a set drawn to the 2018 codes prices differently from one drawn to the 2024 state minimum, and the estimate records which one it follows. Second, the ground: the geotechnical report decides whether shrink-swell clay means over-excavation, lime treatment or select fill, and quantities follow its recommendations. Third, the haul: disposal and import assumptions, haul distance and off-site ownership are written down as inputs, not folded into a unit rate. If the job is publicly funded, say so — Oklahoma has no general state prevailing-wage law, but federally funded work can still carry Davis-Bacon rates.

Discuss your Oklahoma City project scope

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.