2026 NEC · 1 September 2026 · 2015 lighting path
Fort Worth electrical work is on the 2026 National Electrical Code, effective the first of September 2026
Electrical work inside Fort Worth is reviewed by Development Services. The city page says the adopted electrical code is the 2026 National Electrical Code, effective September 1, 2026. A drawing set that still names an older edition is flagged. It is not rewritten onto the 2026 book in the dark. Neighboring Dallas published a different electrical effective date. A Fort Worth parcel uses the Fort Worth page.
The energy path is separate from that electrical edition. The city allows the 2015 energy code or ASHRAE 90.1-2013, and the chosen path has to be used in full. Interior lighting that is added or altered needs an interior lighting compliance report. That report is a submittal. The fixture count still comes from the lighting plan, not from the allowance in the report. Exterior lighting that is added or altered is its own compliance piece and its own fixture count.
Gear, feeders, and branch circuits stay apart. Devices are counts from the power plan. Conduit is extended only where a size and a route are shown. Panel schedules that disagree with the one-line are listed as a clash. Photovoltaic and vehicle-charging equipment are counts from the sheets that include them.
Electricians are recorded at $28.83 on series OEUM001910000000047211103. The series covers Dallas-Fort Worth-Arlington. It is not a Fort Worth conduit price. Private work does not pick up a public wage determination. A covered public contract uses the determination that contract attaches.
Generators, transfer switches, and their feeders are a separate group from the building service. Fire alarm stays out of a power-only bid. Temporary power is a means line only when you ask for it. Lighting control devices are counts from the control diagram. No diagram means the controls stay open.
Forward the one-line, the panel schedules, and the lighting plan. No gear is opened.
A medium-voltage switch and its feeder, when the site electrical plan shows a campus loop, stay out of the building service. Pole bases are counts. Photometrics are not a fixture count. The fixture count is the symbol on the site plan. A temporary generator for construction is omitted unless you ask for means. Surge protective devices at the service are pieces when the one-line tags them. A house meter for a townhouse row is one per unit when the site plan shows separate meters. Common-house panels are measured once. Lighting contactors are pieces. Underground duct banks are linear from the site electrical section, with the conduit count taken from that section rather than from a typical trench. A fire-pump controller is a piece when the one-line shows a pump. The pump itself is not electrical equipment. Lighting in a parking garage is counted from that garage plan, not from the office typical bay.
Electrical quantities before using a Dallas electrical date in Fort Worth
Fort Worth electrical questions the 2026 date creates
Is Fort Worth still on the same electrical edition as Dallas?
The Fort Worth page states the 2026 National Electrical Code, effective September 1, 2026. Dallas publishes its own electrical date. Use the city named on the cover.
Does the lighting energy report replace the fixture count?
No. The count comes from the lighting plan. The compliance report is a separate submittal the city describes for added or altered lighting.
Is $28.83 a Fort Worth crew rate?
No. Series OEUM001910000000047211103 is the metro figure for Electricians.