F&K Estimatings Construction Estimating & Takeoffs

Partition types · Finish level from the spec · 2015 energy book

Fort Worth board quantities come from the partition types, and the 2015 energy book does not set the finish level

Gypsum board and metal studs in Fort Worth are areas and lengths from the partition schedule. Development Services reviews the building. The adopted building book is the 2021 edition with local amendments. The energy book on that same page is the 2015 International Energy Conservation Code, or ASHRAE 90.1-2013 if that is the path the energy forms chose. Neither energy path tells you whether a wall is a Level 4 finish or a fire-taped shaft. Finish level is whatever the specification section prints.

Metal studs are linear by size and spacing. Track is separate. Board is area by type and by layer. A shaft wall, a chase, and a furred column are not the same assembly as a typical office partition, so they are not extended with the typical area. Ceilings are area from the reflected ceiling plan. Soffits are their own surface. Corner bead and control joints are linear when the spec gives them to this trade.

Acoustical ceilings are a different material from gypsum, even though one published occupation name covers both installers. A walls-only invitation should not be read as if it included ceiling tile. Insulation in a stud cavity is included only when this bid holds the thermal scope. It is not added because the energy book exists.

Drywall and Ceiling Tile Installers are recorded at $24.47 on series OEUM001910000000047208103. The series geography is Dallas-Fort Worth-Arlington. The title joins board hanging with ceiling tile, so it is a weak stand-in for either crew alone. It is not a price per sheet, and it is not limited to the Fort Worth city limit.

Rated assemblies are the UL or GA designs the partition schedule names. A design that is cited and not attached is an open item. Access panels are counts. Blocking for accessories is a count where the notes locate it. Existing board to remain is excluded and listed so it is not ordered again.

Forward the partition schedule, the reflected ceiling plan, and the finish spec. No wall is scanned.

A resilient-channel ceiling and a hard-lid ceiling in the same corridor are two surfaces. Shaft liner is a layer count from the rated assembly, not the typical board. Access doors in a hard lid are pieces. Corner guards that the finish spec gives to the drywall trade are lengths. A plaster veneer, if the spec calls for veneer plaster instead of paint-ready board, is called out as a different surface.

Board quantities before reading Fort Worth’s energy code as a finish level

Fort Worth board questions the energy book does not settle

Does the 2015 energy code set the gypsum finish level?

No. Finish level follows the specification. The energy path is envelope compliance, not a Level 4 or Level 5 instruction.

Does the occupation wage cover a ceiling-tile package and a wall package the same way?

The title is Drywall and Ceiling Tile Installers. Those are different scopes. The hourly figure is not a sheet price for either one.

Is $24.47 a Fort Worth-only rate?

No. Series OEUM001910000000047208103 is the Dallas-Fort Worth-Arlington figure.

Fort Worth drywall references

Forward the Fort Worth partition schedule

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.