Structural sheets · Geotech · No soils percentage
Seattle concrete is the yards on these sheets, and a wet winter is a means note rather than extra volume
Concrete inside Seattle is cubic yards from the structural set SDCI will review. The 2021 state building code has been in effect since 15 March 2024. Footings, walls, columns, slabs, and elevated decks are separate. A mat, a pile cap, and a slab on grade are not one number. If the borings never arrived, pile counts and ground improvement stay blank. A Duwamish fill condition is used only when this report describes it. A hill site is not given that condition.
Bar steel is summed by size off the schedule that was attached. Formwork is contact area. Embeds and anchor bolts are piece counts. Shear walls and boundary bars are the schedules, not a seismic percentage placed on top of finished yards. Shotcrete, if the structural notes use it, is the area and thickness those notes print.
Rain changes how a crew protects a placement. That protection is a means line when you say the pour is exposed. It is not additional concrete. Fog and a marine winter do not deepen a footing the detail already dimensions. Footing depth is the detail.
Series OEUM004266000000047205103 records Cement Masons and Concrete Finishers at $42.25 for Seattle-Tacoma-Bellevue. The occupation finishes concrete. It is not a yard price, and Tacoma is inside the statistic without being SDCI. A private slab is not given a public wage determination.
Paving and sidewalks are civil items. A podium lid is measured from the podium sections, including the slopes the architectural section shows. Topping on metal deck is a thickness from that section, separate from any structural slab below. Cure compound and a vapor barrier are their own lines when the spec names them. Joints follow a layout. No layout leaves the cuts unresolved.
Bellevue foundation details are not substituted. Special inspection is a general-requirement note when the spec requires it. It is not cubic yards.
Upload the structural set and the borings. No placement is watched.
A transfer girder is cubic yards from its section, not a slab thickening. Rock anchors are counts when the shoring sheet shows them. A topping over CLT is the thickness that architectural section prints. Shotcrete walls are area and thickness, not form-and-pour walls.
A Seattle transfer girder is its own cubic yards from the girder section. Topping over timber is the thickness the architectural section prints and is not the structural lid. Rock anchors are counts when the shoring sheet shows them. A mat edge thickening is measured from that edge, not from a typical footing. Stair pans are counts.
Concrete quantities before a Seattle soils percentage
Seattle concrete questions the geotech has to settle
Do you add piles because parts of Seattle are on fill?
Only when this geotechnical report calls for piles or ground improvement. A missing report leaves that scope blank.
Does winter rain add concrete?
No. Protection of the placement is a means note when you ask for it. Yards stay with the sheets.
Is $42.25 a yard price?
No. Series OEUM004266000000047205103 is the survey hourly statistic for Cement Masons and Concrete Finishers.