Black clay · Borings · Development Services
Dallas concrete quantities start with the soils report, because black clay does not imply a pier under every slab
Concrete inside the Dallas city limits is reviewed by Development Services. The 2021 International Building Code and Residential Code, with Dallas amendments, have been the city’s books since 12 May 2023. The soil that moves foundations here is high-plasticity clay. That fact does not authorize a pier schedule. Drilled piers, carton forms, and a structurally supported floor are quantities only when this project’s borings and structural sheets call them out. A missing report is an open exclusion, not a typical pier length borrowed from another North Texas job.
Footings, grade beams, piers, slabs, and walls are yards from the dimensions on these sheets. Reinforcing is weight by bar size from the schedule. Formwork is contact area, which grows when a void form lifts the beam off the clay. Vapor retarder and select fill are areas and yards of their own. Hail has nothing to do with the slab. It belongs on the roof specification if it belongs anywhere. Frost is shallow. Footing depth here is a bearing and swell question, not a northern frost line.
Cement Masons and Concrete Finishers in the Dallas-Fort Worth-Arlington wage area, which is wider than the city, are published at $24.22 hourly mean on 2025 file OEUM001910000000047205103. The metro figure is not a Dallas crew rate and not a price per yard. Texas public work can carry prevailing wage with no dollar minimum on the January 2023 federal chart. A private house slab does not.
Paving and detention live on the civil package. They are not part of the building slab unless the invitation includes that civil set. Tilt-wall panels, when this is an industrial shell, are a separate concrete scope from the floor.
Send the structural set and the geotechnical report. Nobody watches a pour.
Control joints in the slab are lengths from the joint plan. Without a joint plan the joints stay open rather than being laid out on a guessed grid. Embedded plates for tilt panels are counts from the panel schedule and are easy to leave inside the yardage. Vapor barrier laps are not a second full area unless the spec calls out the lap. Cure compound is an area only when the spec names the product. Cold-weather blankets are listed only if you say the placement is in freezing weather, which is uncommon here and still possible.
Concrete quantities before North Texas pier schedules
Dallas foundation items the clay does not automatically create
Should every Dallas slab include piers?
No. Piers, void forms, and suspended floors are quantified when the borings and the structural drawings call them out. A missing report is an exclusion.
Does Fort Worth’s code apply because the wage area includes Fort Worth?
No. The wage area is Dallas-Fort Worth-Arlington. Fort Worth has its own building official. A Dallas parcel uses Dallas amendments.
Is $24.22 a yard price?
No. File OEUM001910000000047205103 is an hourly mean for cement masons and concrete finishers across the metro.