PBCE · Member and footing schedules · No seismic percent
San Jose concrete is the yards on these sheets, and a valley seismic note is not an extra percentage
Concrete inside San Jose is reviewed by Planning, Building and Code Enforcement. The statewide building standards that took effect at the start of 2026 are the cycle those notes sit in, and the city can file its own amendments. Sunnyvale and Santa Clara share the wage-survey name and do not share this counter. Footings, walls, columns, slabs, and elevated decks are cubic yards from the dimensions drawn here. If the borings never arrived, pier counts stay blank. Nothing is copied from a different Santa Clara County foundation.
Bar steel is summed by size off whichever schedule was attached. Formwork is contact area. Embeds and anchor bolts are counts. They vanish into the cubic yards unless they are listed on their own. A site-cast panel, when this set is an industrial shell, is measured apart from the slab it stands on. A downtown podium deck is not that shell. Each is measured from its own sheets.
Lateral design in the valley shows up as the shear walls, the boundary bars, and the hold-downs the structural sheets schedule. Those are quantities. They are not a second percentage placed on top of a finished yardage. Special inspection is a general-requirement note when the specification requires it. It is not cubic yards.
Cement Masons and Concrete Finishers in San Jose-Sunnyvale-Santa Clara are published at $38.83 an hour on file OEUM004194000000047205103. The occupation finishes concrete. It is not a yard price, and the survey reaches cities this department does not permit. A private slab does not inherit a public-works determination. Covered public work uses the decision in that solicitation.
Vapor retarder, underslab fill, and cure compound are their own lines when the spec names them. Sawcut joints follow a joint layout. No layout means those cuts are not invented. Blankets for a freeze are a means line only when you say the pour is scheduled in a freeze. That is uncommon in the valley and it still happens.
Forward the structural set and the soils report if foundations are in the bid. Nobody watches a placement.
A mat foundation under a podium is yards from the mat sections, including the thickened edges, and it is not a repeat of the typical footing. Elevator pits are their own small volumes. Topping slabs on metal deck are a thickness from the architectural section, separate from the structural slab below if both exist. Curb and gutter at the building entry stay with site concrete unless the structural set draws them.
Concrete quantities before a San Jose seismic percentage
San Jose concrete questions the structural set has to answer
Do you add a seismic factor after the yards are done?
No. Walls, boundary reinforcing, and hold-downs are taken from the schedules. A referenced detail that was not drawn stays open.
Does Sunnyvale’s counter apply because the wage area includes it?
No. A parcel inside San Jose is reviewed by Planning, Building and Code Enforcement.
Is $38.83 a yard price?
No. File OEUM004194000000047205103 is the metro hourly figure for Cement Masons and Concrete Finishers.