SDCI · 15 March 2024 · One log per invitation
A Seattle bid list is SDCI inside the city, and Bellevue or Tacoma is not that counter
A list of bids around Seattle is handled off site. Nothing here is a login to the city portal or a seat at a local desk. Every invitation is recorded alone: the city on the cover, the energy form in the set, and the sheets that actually arrived. Inside the city limit the reviewer is the Seattle Department of Construction and Inspections. Bellevue, Shoreline, Tacoma, and unincorporated King County are other reviewers even though some of them share a wage-survey name.
Washington’s 2021 state building code took effect 15 March 2024. The building volume is the 2021 IBC with amendments in WAC 51-50, and the residential volume is the 2021 IRC with amendments in WAC 51-51. Seattle layers its own energy amendments. Insulation, glazing, and mechanical efficiency are taken from the energy forms in that set, not from an unedited state pamphlet and not from a Spokane checklist.
File OEUM004266000000013105103 places Cost Estimators at $47.87 an hour. The survey geography is Seattle-Tacoma-Bellevue. The occupation estimates. It is not an electrician and it is not a plumber. Trade dollars, when you want them, come from rates you hand over or from the project schedule on a covered public job. Washington’s January 2023 chart shows no dollar minimum for the state prevailing-wage law, with a separate $25,000 note for some state college and university construction. A private office is not given a campus schedule. The fee for this support is its own quote.
Rain and seismic design show up only as the details these sheets draw: rainscreen cavities, deck membranes, shear walls, drag struts, equipment anchorage. They are not a percentage added after the takeoff. Liquefaction or ground improvement is included only when this geotech puts the parcel in that condition. A hill lot is not assigned a valley soils problem because the job is “in Seattle.”
Add-alternates sit on separate pages. Any contingency figure is one you choose. A university invitation and a private warehouse on the same afternoon do not share a wage basis. Labor and Industries registration is a state credential. It does not replace SDCI.
Deferred submittals are named and left unmeasured until those sheets exist. Correction letters that change the design belong in a revision, with the superseded quantities still visible.
Pass the bid list and the first plan set. No intake meeting is attended.
A shoreline street-use permit is a general requirement only when the invitation names it. A floating home is not an SDCI mid-rise. Deferred curtain-wall engineering is named and left unmeasured until the shop drawings exist.
A Seattle shoreline street-use item is a general requirement only when the invitation names the closure. Deferred curtain wall is named and left unmeasured until shop drawings exist. A floating home is not an SDCI mid-rise. Hillside pin piles are counts only when the structural set shows the pins.
A Seattle bid list that includes a floating structure is logged separately from an upland SDCI building. The floating scope is only the sheets that actually describe it. Upland shoring pins are counts when the structural set shows the pins. A street-use closure is a general requirement only when the invitation describes the hours. Energy forms from Bellevue are not swapped onto a Seattle cover.
Bid support before treating Bellevue as SDCI
Seattle bid-list questions the city line creates
Does King County review a parcel inside Seattle?
No. SDCI is the city office. King County reviews unincorporated land. Bellevue and Tacoma are other cities.
Is Seattle’s energy code the same pamphlet as Spokane’s?
No. Both sit under the Washington cycle, and Seattle adopts additional energy amendments. Use the forms issued with these drawings.
Is $47.87 the fee?
No. File OEUM004266000000013105103 is the survey hourly statistic for Cost Estimators.