Schedule equipment · Energy forms · No invented tons

Seattle mechanical quantities follow the equipment schedule, and the energy forms do not add a unit the schedule omitted

An SDCI mechanical bid uses the 2021 Washington code that has applied since 15 March 2024, plus Seattle’s own energy amendments. Those amendments can demand an efficiency or an outside-air rate the equipment list never caught. Put both documents on the assumption log. Do not insert a machine to “fix” the form, and do not drop a tagged machine because the form looks stricter.

Tag counts are the bid quantities: heat pumps, air handlers, fans, energy-recovery boxes, each as its own mark. Relief air is a separate column from heating or cooling capacity. Sheet-metal mains are squared or weighed from the duct layout that was issued. Flexible runouts are lengths only on branches the plan marks as flex. Grilles are each. Refrigerant line sets are lengths by pipe size off the piping diagram.

Heating, Air Conditioning, and Refrigeration Mechanics and Installers are filed at $41.07 under OEUM004266000000049902103. The survey name is Seattle-Tacoma-Bellevue, so Tacoma is inside the statistic and outside SDCI. That occupation is the mechanic. It is not tons of cooling and not pounds of duct. Sheet-metal workers are a different line and are not blended in. The figure is not the estimate fee.

Hood exhaust stays on the hood sheets, apart from comfort duct. Makeup air serving that hood is its own mark when the list tags it. A generator radiator is not comfort cooling. Condensate piping is linear. Isolators and the roof curb are piece counts, and the curb is flagged so the roof package is not also buying it. Control points wait for a points list. No list means the controls cell stays blank.

Balance work is a line only when you ask for it. Crane time for a rooftop piece is a general-requirement allowance you describe, not a hidden adder on the equipment count. A Bellevue equipment list is not extended on Seattle energy forms. Laboratory exhaust, when those sheets exist, is its own system and is not mixed into toilet exhaust.

Duct wrap thickness comes from the mechanical spec. If the Seattle energy form prints a different thickness, report the clash and price neither one as a silent correction. A dedicated outdoor-air unit is not a recirculating air handler. Hydronic fin-tube is linear by element. A server-room CRAC is a count from the IT plan. Radiant ceiling panels are area only where the ceiling plan shows them.

What you send: the equipment list, the duct plans, and the Seattle energy forms. What you get is quantities, the code-year note, and the gaps. Nothing is started on site.

Mechanical quantities before adding Seattle equipment the schedule omitted

Seattle mechanical bid questions

Will you add a unit so the Seattle energy form passes?

No. A mismatch between the form and the equipment list is logged. Missing tags stay missing.

Is laboratory exhaust the same column as toilet exhaust?

No. Laboratory exhaust is its own system when those sheets are in the set.

Is $41.07 the price per ton?

No. OEUM004266000000049902103 is the hourly statistic for Heating, Air Conditioning, and Refrigeration Mechanics and Installers. It is not the fee.

Seattle mechanical references

Upload the Seattle equipment schedule and energy forms

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.