F&K Estimatings Construction Estimating & Takeoffs

Division pricing · Energy forms · No square-foot habit

A Seattle cost estimate prices the energy forms and the structural sheets as separate sources, not one square-foot factor

A Seattle priced estimate is assembled division by division from the drawings you send. SDCI reviews parcels inside the city. The state building code in force since 15 March 2024 is the 2021 edition, and the energy rules Seattle amended are read from the envelope and mechanical forms attached to this package. Square-foot building cost is not what this workbook delivers.

Division breaks follow the bid form you send. Owner allowances are copied as printed numbers. An early schematic is marked as a budget and the absent sheets are named. Different roof systems stay in different groups so a later unit price is not forced onto one combined area. Civil stormwater stays out of the building total unless the invitation includes those sheets.

Series OEUM004266000000013105103 reports $47.87 an hour for Cost Estimators across Seattle-Tacoma-Bellevue. Tacoma and Bellevue sit inside that statistic and outside SDCI. The figure is not this proposal. Covered public work uses the project schedule. January 2023 lists no dollar floor, except a campus note that applies only when the solicitation is certain state college or university construction. A private bid does not borrow that campus figure.

Rainscreen cladding is square feet only where the wall sections draw the cavity. It is not added to every elevation. Alternates and unit prices occupy their own pages. A crane is a general-requirement line only when the invitation describes it. A Bellevue energy form is not swapped onto a Seattle log.

Sales-tax handling is left to you. This estimate does not pick a tax method. What you receive is the division pricing, the energy-form note, the assumption list, and the gaps. How a national estimate is organized is linked below this Seattle file.

Owner-furnished lab gear shown for coordination is excluded and listed so it is not bought in the trade columns. A design-build narrative with sketches only is labeled a budget. Winter protection is a means allowance only when you give a duration. Rock excavation is not filled from a regional average.

Laboratory equipment the owner furnishes is named on an exclusion list so no trade column buys it. Excavation in rock stays blank until this site’s borings say rock is present. Cold-weather protection is a means allowance only after you state a duration. Sketches without sheets are marked as a budget and the missing sheets are listed. A crane appears only when the invitation describes one. Sheets stamped Bellevue stay out of the Seattle total.

Cost estimates before a Seattle square-foot factor

Seattle pricing bid questions

Will you price the envelope from a generic checklist?

No. Insulation, glazing, and mechanical efficiency come from the energy forms in this set.

Is every public job above a dollar minimum?

The January 2023 chart shows no dollar minimum, with a separate note for some state college and university work. Read the solicitation.

Is $47.87 the fee?

No. OEUM004266000000013105103 is the hourly statistic for Cost Estimators. The fee is a separate quote.

Seattle pricing references

Hand off the Seattle drawings and energy forms

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.