Seattle, Washington · Remote estimating support
Seattle estimating for side-sewer and building-drainage interfaces
A Seattle building estimate can miss scope at the point where the building drainage leaves the structure. We separate the interior plumbing package, the side-sewer route and surface reinstatement using the issued plans. The schedule identifies the contractor responsible for each segment so a connection is neither omitted nor included by two trades.
Send plans for a scope quoteProject context and local references
Seattle Public Utilities describes side-sewer work on private property and within the public right-of-way, including sanitary and certain drainage connections. The relevant permit and utility directions depend on the proposed work. Use the approved project routing and correspondence rather than assuming that the building plumbing drawing describes the whole external connection.
Reconcile private-property and public-interface quantities
Hypothetical worked example · not a client project or market quotation
Suppose the civil route contains 95 feet on private property and 25 feet within the indicated public interface. The external route totals 120 feet, while the building-plumbing package separately begins at the stated connection point. If a plumbing quotation already includes the first 15 feet outside the building, reconcile that overlap explicitly: do not buy 135 feet of the same route. Pipe material, structures, cleanouts and reinstatement still follow their own schedules, and any drainage branch is measured separately from the sanitary line.
Review before pricing
Confirm existing versus proposed routing, the defined connection point and the source of depth information. Separate removal or capping from new installation. Do not infer slope, capacity or connection approval from an old utility map. Civil quantities should reflect the designer's sections, while traffic access, testing and inspection responsibilities remain named scope items.
Documents and requested output
Send the drainage and side-sewer sheets, building-plumbing tie-in detail, utility correspondence, profiles and restoration sections. Ask for a segment register showing owner, system, material, length and drawing reference. Any overlap with a plumbing or utility quotation should be marked as a deduction or reassigned responsibility, not hidden in an overall contingency.
What to confirm before comparing bids
Compare the same start and end points in every bid. A quotation for an external route may exclude the public connection or pavement restoration even when its pipe length appears complete.
Scope checklist
- Mark the building-to-side-sewer responsibility boundary.
- Reconcile private and public route segments.
- Separate sanitary, drainage, removal and restoration lines.
Source documents for project review
Local references checked . Confirm the current requirements with the project team and relevant authority.
Questions for this estimating scope
What information helps us reconcile private-property and public-interface quantities?
Send the drainage and side-sewer sheets, building-plumbing tie-in detail, utility correspondence, profiles and restoration sections. Ask for a segment register showing owner, system, material, length and drawing reference. Any overlap with a plumbing or utility quotation should be marked as a deduction or reassigned responsibility, not hidden in an overall contingency.
What needs review before this scope is priced?
Confirm existing versus proposed routing, the defined connection point and the source of depth information. Separate removal or capping from new installation. Do not infer slope, capacity or connection approval from an old utility map. Civil quantities should reflect the designer's sections, while traffic access, testing and inspection responsibilities remain named scope items.