F&K Estimatings Construction Estimating & Takeoffs
Verified Takeoff Samples • Selected quantities only Owner Authorized Public Release

Construction Estimating Samples
Follow the detail.

Explore selected workbook quantities alongside their scope and drawing evidence. A practical look at what sits behind a measured takeoff.

Compare the source excerpts

Four source excerpts, 234 selected quantity rows

Compare the available scope before opening the interactive schedule. Values below retain the saved precision and original unit. These excerpts do not establish complete project totals, pricing, a client relationship or a project outcome.

Concrete & site quantities

Concrete, reinforcement, formwork and site-improvement quantities with separate source units.

48 selected rows · 1 approved drawing crop

Source units: CY, LBS, SF, EA, LF. Units are not summed together.

Inspect three saved source rows
  • 2'-0" W x 1'-0"D x 192' L Cont Concrete Footing14.2222222222222 CYDrawing reference: S1
  • (2) Cont #5 Rebars400.512 LBSDrawing reference: S1
  • #5 Bent Dowel @ 16"O.C x 3'-0" L Alternate Direction Of Bend451.705263157895 LBSDrawing reference: S1
Open this quantity schedule Concrete estimating scope

Electrical systems takeoff

Conduit, conductors and electrical distribution, organized by the source schedule.

48 selected rows · No drawing crop published for this excerpt

Source units: FT, SF, CY, EA. Units are not summed together.

Inspect three saved source rows
  • 3/4" Emt Conduit19870 FTDrawing reference: E 101 - 701
  • 3/4" Flex Conduit1584 FTDrawing reference: E 101 - 701
  • 3/4" Rgs Conduit8395 FTDrawing reference: E 101 - 701
Open this quantity schedule Electrical estimating scope

Coordinated MEP quantities

Plumbing, mechanical and electrical quantities organized by their recorded CSI divisions.

90 selected rows · 6 approved drawing crops

Source units: LF, EA, LS, SF. Units are not summed together.

Inspect three saved source rows
  • 2" Vent Pipe129.29 LFDrawing reference: P101,201,202
  • 3" Vent Pipe60.81 LFDrawing reference: P101,201,202
  • 4" Vent Pipe22.3 LFDrawing reference: P101,201,202
Open this quantity schedule MEP estimating scope

Drywall & insulation takeoff

Selected wall assemblies, gypsum board, framing and insulation from the finishes schedule.

48 selected rows · 1 approved drawing crop

Source units: SF, EA, LF, LBS. Units are not summed together.

Inspect three saved source rows
  • (1) Layer Of 5/8" Type-X Gypsum Board On Both Side Manufacturer: United States Gypsum Company1112.2649999999999 SFDrawing reference: A3.1 -- A3.3
  • 4x8 Gypsum Board Sheathing38.234109374999996 EADrawing reference: A3.1 -- A3.3
  • Taping611.74574999999993 LFDrawing reference: A3.1 -- A3.3
Open this quantity schedule Drywall estimating scope

How quantities are measured and reviewed · Request a project-specific scope quote

Preparing the verified sample library…