Chapter 18-29 · Title 14P · Interior stacks

Chicago plumbing is Chapter 18-29, not an IPC suburb’s book

Interior plumbing in Chicago is not the International Plumbing Code a collar suburb may have adopted. The city’s construction-code page places building plumbing in Chapter 18-29 of the Municipal Code and says those provisions are referenced by the interim plumbing title, Title 14P, adopted in April 2019. It also says water and sewer provisions, including site stormwater, sit in Title 11 and are administered primarily by the Department of Water Management. The Department of Buildings still runs building permits. A bid that stops at the property line and a bid that includes the tap are different scopes. The drawings have to say which one you hold.

Waste, vent, storm, and domestic water are measured as separate materials and sizes from the risers and the plans. Fixtures come from the schedule. Carriers, interceptors, valves, and cleanouts are counts. Roof drains are not floor drains. A grease waste system is excluded when the food-service drawings are not in the set. Pipe insulation is a length from the spec, not a percent of water pipe. Freeze protection on exposed lines is a spec item. Chicago winters make it familiar. They do not create the line by themselves. Water heaters and recirculation pumps are equipment from the schedule. Backflow preventers are counts where the riser shows them. Storm leaders inside the building are not the site storm sewer in Title 11. If the bid stops at the building wall, the site pipe stays off the sheet. Medical gas and lab vacuum need their own spec and are not counted as domestic water. Recirculation pumps and expansion tanks are schedule counts. Backflow preventers are counts where the riser shows them. Storm leaders inside the building are not the site sewer. A bid that stops at the wall leaves the site pipe off the sheet. Water heaters are equipment counts. Trap primers are counts where the riser shows them. A grease-waste system is excluded when the food-service drawings are absent. Pipe insulation is a length from the spec rather than a percent of water pipe. Freeze protection is listed only when the spec calls for heat trace on exposed lines.

Plumbers, Pipefitters, and Steamfitters in Chicago-Naperville-Elgin average $46.36 an hour on May 2025 series OEUM001698000000047215203. Sprinkler fitters are inside that published title, so a fire-protection contract should not be priced as if the average were only a residential service plumber. The average is not the installed cost. Covered public work takes the classification in the Illinois wage schedule for that county. Private work leaves it out.

Stacks are counted from the PDFs. No camera is run and no water-department counter is visited. Send risers, plans, the fixture schedule, and a note on whether the tap is included.

Plumbing measurement practice outside Chicago’s chapter 18-29

Chicago plumbing boundaries worth fixing first

Is Chicago on the same IPC as a nearby suburb?

No. Building plumbing is Chapter 18-29, referenced by the interim Title 14P. A suburb’s adopted IPC is a different book even when the wage survey lumps the metro together.

Who reviews the sewer connection?

The city describes Title 11 water and sewer provisions as administered primarily by the Department of Water Management. Do not assume a building permit covers the tap.

Does the plumber average include sprinkler fitters?

The OEWS title is Plumbers, Pipefitters, and Steamfitters and the occupation description includes sprinkler fitters. It is one published average, not three prices.

Chicago plumbing sources

Send Chicago riser diagrams and the fixture schedule

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.