F&K Estimatings Construction Estimating & Takeoffs

Risers · House book versus commercial book · No invented bury

Nashville pipe is extended from the risers, and a shallow frost line does not add a bury depth the profile omitted

Nashville pipe lengths come off the risers, sized as drawn, with fixtures counted beside them. Since 17 April 2025 the State Fire Marshal minimums put commercial work on the 2021 IBC and one- and two-family work on the 2018 IRC. A city can adopt a different edition, so this page does not claim Nashville matched the minimum. The edition named on these sheets is what the log records. A house riser and a warehouse riser in one PDF are logged as different books until the drawings say otherwise. A Franklin or Murfreesboro sheet is excluded from the Nashville total.

House and commercial piping are extended as separate materials: supply, a pumped loop, soil stacks, and vents. The loop is measured only on the levels the diagram draws. Heaters come off the equipment list as each. A grease vessel is one each when a food-service plan is attached. Leaders that fall inside the building are kept out of the site pond quantity.

Cover over buried pipe is taken from the civil profile. Another state’s frost number is not copied in. Heat cable is a length only on the runs the plans actually show. Rock or a void in a trench is a soils quantity only when the borings say so, not a pipe adder.

Series OEUM003498000000047215203 reports $30.33 an hour for Plumbers, Pipefitters, and Steamfitters in Nashville-Davidson-Murfreesboro-Franklin. The published title also contains steam fitting and sprinkler fitting. Read it as one hourly market note, never as a fixture price. Tennessee’s January 2023 line is highway construction over $50,000. Non-highway construction has no state prevailing wage. A building bid is not a highway bid.

Mop sinks stay off the floor-drain count. Lavatory mixing valves are included only when the written spec names them. Gas distribution is a separate extension and is left out when the plumber does not hold gas. The file you get lists pipe lengths, fixture tallies, the code note, and anything still blank.

A medical-gas zone valve is an each-count when a med-gas sheet exists, and that sheet is not domestic water. A church baptistry fill, if drawn, is one run. Commercial kitchen floor drains are not a residence laundry standpipe. A meter and backflow at the building entry are those pieces plus the piping the plan dimensions inside the wall.

Piping quantities before importing a deeper frost line into Nashville

Nashville piping bid questions

Do you deepen buried pipe because other states frost deeper?

No. Depth follows the profile on these sheets. A missing profile leaves depth blank.

Is the plumber statistic a sprinkler price?

The occupation is Plumbers, Pipefitters, and Steamfitters. Sprinkler pipe stays out unless this contract holds it.

Is $30.33 a fixture price?

No. OEUM003498000000047215203 is the hourly statistic for that occupation.

Nashville piping references

Upload the Nashville risers and name house or commercial

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.