F&K Estimatings Construction Estimating & Takeoffs

Title 14M · Equipment schedules · Duct weight

Chicago duct weight and equipment schedules depend on which mechanical code the application elected

Mechanical plans for Chicago have a code-election problem through the end of November 2026. Code Memorandum 2026-001 says the 2026 Chicago Mechanical Code, Title 14M, may be used on applications started from 1 October 2026 and must be used on applications started on or after 1 December 2026. An application started before that date can remain on the prior mechanical text. The equipment efficiencies, economizers, and ventilation rates follow the edition the drawings were coordinated to. They are not updated in the takeoff to the other book. Energy rules are a further split: the state energy code moved, and the city’s 2026 energy title is part of the same optional window. Use the forms in the set.

Ductwork is converted to weight and surface from the sizes on the plan, with fittings counted rather than stuffed into a pound-per-square-foot factor. Air devices, dampers, and valves are counts. Rooftop units, air handlers, and terminals come from the equipment schedule with the electrical connection left to the electrical trade unless you asked for a combined MEP sheet. Refrigerant and hydronic pipe are lengths by size. Condensate is its own small system. Roof curbs and rail supports are counts from the structural or mechanical details. Snow and intake protection are included when the detail draws them, which is common in this climate and still not automatic. Vibration isolation and seismic restraints, where the schedule lists them, are counts per piece of equipment. They are not a percentage of the equipment price. Controls and the sequence of operations are excluded unless you asked for a controls takeoff. Test and balance is a separate line if the spec assigns it to this contractor. Insulation on duct and pipe is an area or a length from the insulation spec, kept visible so it is not lost inside the sheet-metal weight. VAV boxes are counts from the schedule. Controls and the sequence of operations stay out unless you asked for them. Test and balance is its own line when the spec assigns it to this contractor. Vibration isolation is a count per machine, not a percent of equipment cost. Snow hoods are included only where the detail draws them.

Two wages get confused on mechanical bids. Heating, Air Conditioning, and Refrigeration Mechanics and Installers average $38.14 an hour on May 2025 series OEUM001698000000049902103. Sheet Metal Workers, who fabricate and hang a large share of the duct, average $41.16 on series OEUM001698000000047221103. Quoting one average for both crews erases the difference. Neither number is a pound price for duct or a ton price for a chiller. Prevailing wage, where the public contract is covered, replaces both.

No air balance is performed and no roof is visited. Send plans, the equipment schedule, the mechanical specification, and a statement of which code edition the application is using.

HVAC quantity rules that ignore Chicago’s code election

Chicago mechanical scope that the code window changes

Must a November 2026 filing use the 2026 Mechanical Code?

Only if the applicant elected it. Memorandum 2026-001 makes Title 14M mandatory for applications started on or after 1 December 2026. Say which path this set is on.

Is the sheet-metal wage the same as the equipment-mechanic wage?

No. May 2025 series OEUM001698000000047221103 and series OEUM001698000000049902103 are different occupations and different averages.

Do you add snow hoods on every rooftop unit?

Only when the detail or the schedule calls for them. Climate is a reason they often appear, not a quantity by itself.

Chicago mechanical sources

Upload Chicago mechanical plans and the code election

Request a quote for paid estimating or quantity takeoff services. Share your trade scope, project location and bid deadline. We confirm the fee and deliverables before work starts. Fields marked * are required.

Contact and project details
Choose your phone country and enter your local number. Or enter a full number starting with + and its country code, regardless of the country selected.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

No drawings attached. This field is optional.

    Already have a sharing link? Paste it here instead of uploading. Grant access to info@fandkestimatings.us; do not include passwords.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    Prefer to discuss the scope first, or having trouble with the form? Email your project details or discuss your project on WhatsApp. Include your project location, trade scope and bid deadline.